    INDICI DE ACTUALIZARE

    COSTURI DE RECONSTRUCIE - COSTURI DE NLOCUIRE

    CLDIRI REZIDENIALE

    CLDIRI INDUSTRIALE, COMERCIALE I AGRICOLE. CONSTRUCII SPECIALE

    1 AUGUST 2014 1 AUGUST 2015

    IROVAL BUCURETI

    2014

  • 8/10/2019 Indici de Actualizare 2014-2015

    2/117

    Corneliu chiopu, Mihail-Ioan chiopu

    Indici de actualizare

    Costuri de reconstrucie - Costuri de nlocuire. Cldiri rezideniale. Cldiri industriale, comerciale i agricole. Construcii speciale.1 August 2014 - 1 August 2015

    Copyright 2014 Asociaia Naionala Evaluatorilor Autorizai din Romnia (ANEVAR). Toate drepturile rezervate.

    CD editat de IROVAL- CERCETRI N EVALUARE SRL

    Nici o parte a acestei publicaii nu poate fi reprodus, stocatsau transmissub orice formsau prin orice mijloace, electronic,mecanic, fotocopiere, de nregistrare, de scanare sau de alt tip, cu excepia celor permise n conformitate cu art. 33 din Legeanr. 8 din 1996 privind dreptul de autor i drepturile conexe, fracordul prealabil, n scris, al editorului.

    ISBN 978-606-8316-24-6

  • 8/10/2019 Indici de Actualizare 2014-2015

    3/117

  • 8/10/2019 Indici de Actualizare 2014-2015

    4/117

    CUPRINS

    CLDIRI REZIDENIALE Numrul paginilor din crile de baz Pag.Fundaii continui cldiri frsubsol i cu subsol pag.11,13 1Structurcldire parter (frscar) gradul seismic 6,7,8 pag.15,16,17 2Structurcldire parter (frscar) gradul seismic 9Structurcldire parter (cu scar) gradul seismic 6,7 pag.18,19,20 3Structurcldire parter (cu scar) gradul seismic 8,9Structuretaj (frscar) gradul seismic 6 pag.21,22,23 4Structuretaj (frscar) gradul seismic 7,8,9 pag.24,25,26 5Structuretaj (cu scar) gradul seismic 6,7,8 pag.27,28,29 6Structuretaj (cu scar) gradul seismic 9

    Mansardgradul seismic 6,7 pag.30,31,32 7Mansardgradul seismic 8,9 pag.33,34 8nvelitori i teraseFinisaje interioare i exterioareFinisaje scarFinisaje de faad pag.35,36 9Instalaii funcionale pag.37 10Structurbloc P+4E+subsol tehnic

    Teras, finisaje i instalaii electrice i de nclzireFinisaj scarbloc P+4E+subsol tehnic pag.39,40 11Ansambluri obiecte sanitare obinuite bloc P+4E pag.41 12Ansambluri obiecte sanitare calitate superioarbloc P+4E pag.42 13Structurbloc P+8E+subsol tehnicTeras, finisaje i instalaii electrice i de nclzireFinisaj scarbloc P+8E+subsol tehnic pag.43,44 14Ansambluri obiecte sanitare obinuite bloc P+8E pag.45 15

    Ansambluri obiecte sanitare calitate superioarbloc P+8E pag.46 16Structurbloc P+10E+subsol tehnicTeras, finisaje i instalaii electrice i de nclzireFinisaj scarbloc P+10E+subsol tehnic pag.47,48 17Ansambluri obiecte sanitare obinuite bloc P+10E pag.49 18Ansambluri obiecte sanitare calitate superioarbloc P+10E pag.50 19Cldire monumental pag.51 20Cldire din lemn pag.53 21

    Cldire din paiant pag.55 22

  • 8/10/2019 Indici de Actualizare 2014-2015

    5/117

    CLDIRI INDUSTRIALE Numrul paginilor din crile de baz Pag.Structurhalindustrialcu stlpi prefabricai de 6mnlime, cu 1,2 sau 3 deschideri de 6mStructurhalindustrialcu stlpi prefabricai de 8mnlime, cu 1,2 sau 3 deschideri de 6m pag.14,16 23Structurhalindustrialcu stlpi prefabricai de 10mnlime, cu 1,2 sau 3 deschideri de 6mStructurhalindustrialcu stlpi prefabricai de 6mnlime, cu 1,2 sau 3 deschideri de 9m pag.18,20 24Structurhalindustrialcu stlpi prefabricai de 8m

    nlime, cu 1,2 sau 3 deschideri de 9mStructurhalindustrialcu stlpi prefabricai de 10mnlime, cu 1,2 sau 3 deschideri de 9m pag.22,24 25Structurhalindustrialcu stlpi prefabricai de 6mnlime, cu 1,2 sau 3 deschideri de 12mStructurhalindustrialcu stlpi prefabricai de 8mnlime, cu 1,2 sau 3 deschideri de 12m pag.26,28 26Structurhalindustrialcu stlpi prefabricai de 10m

    nlime, cu 1,2 sau 3 deschideri de 12mStructurhalindustrialcu stlpi prefabricai de 6mnlime, cu 1,2 sau 3 deschideri de 15m pag.30,32 27Structurhalindustrialcu stlpi prefabricai de 8mnlime, cu 1,2 sau 3 deschideri de 15mStructurhalindustrialcu stlpi prefabricai de 10mnlime, cu 1,2 sau 3 deschideri de 15m pag.34,36 28Structurhalindustrialcu stlpi prefabricai de 6m

    nlime, cu 1,2 sau 3 deschideri de 18mStructurhalindustrialcu stlpi prefabricai de 8mnlime, cu 1,2 sau 3 deschideri de 18m pag.38,40 29Structurhalindustrialcu stlpi prefabricai de 10mnlime, cu 1,2 sau 3 deschideri de 18mStructurhalindustrialcu stlpi prefabricai de 6mnlime, cu 1,2 sau 3 deschideri de 21m pag.42,44 30

  • 8/10/2019 Indici de Actualizare 2014-2015

    6/117

    CLDIRI INDUSTRIALE Numrul paginilor din crile de baz Pag.Structurhalindustrialcu stlpi prefabricai de 8mnlime, cu 1,2 sau 3 deschideri de 21mStructurhalindustrialcu stlpi prefabricai de 10mnlime, cu 1,2 sau 3 deschideri de 21m pag.46,48 31Structurhalindustrialcu stlpi prefabricai de 6mnlime, cu 1,2 sau 3 deschideri de 24mStructurhalindustrialcu stlpi prefabricai de 8mnlime, cu 1,2 sau 3 deschideri de 24m pag.50,52 32Structurhalindustrialcu stlpi prefabricai de 10mnlime, cu 1,2 sau 3 deschideri de 24m

    Structurhalindustrialcu stlpi prefabricai de 6 i 8mnlime, avnd deschiderile de 9m i 12m pag.54,56 33Structurhalindustrialcu stlpi prefabricai de 6 i 10mnlime, avnd deschiderile de 9m i 12mStructurhalindustrialcu stlpi prefabricai de 6 i 8mnlime, avnd deschiderile de 9m i 15m pag.57,58 34Structurhalindustrialcu stlpi prefabricai de 6 i 10mnlime, avnd deschiderile de 9m i 15m

    Structurhalindustrialcu stlpi prefabricai de 6 i 8mnlime, avnd deschiderile de 9m i 18m pag.59,60 35Structurhalindustrialcu stlpi prefabricai de 6 i 10mnlime, avnd deschiderile de 9m i 18mStructurhalindustrialcu stlpi prefabricai de 6 i 8mnlime, avnd deschiderile de 9m i 21m pag.61,62 36Structurhalindustrialcu stlpi prefabricai de 6 i 10mnlime, avnd deschiderile de 9m i 21m

    Structurhalindustrialcu stlpi prefabricai de 6 i 8mnlime, avnd deschiderile de 9m i de 24m pag.63,64 37Structurhalindustrialcu stlpi prefabricai de 6 i 10mnlime, avnd deschiderile de 9m i de 24m pag.65 38Acoperiuri pentru hale industriale pag.66,67 39

  • 8/10/2019 Indici de Actualizare 2014-2015

    7/117

    CLDIRI INDUSTRIALE Numrul paginilor din crile de baz Pag.Centralnecircularcu termoizolaie vatmineralLuminator structurmetalici geam armatnchidere lateralexterioarcu crmidde 24cmgrosime, finisatinterior i exteriornchidere lateralexterioarcu B.C.A. de 24cmgrosime, finisatinterior i exterior pag.68,69,70 40nchidere lateralexterioarcu B.C.A. de 20cmgrosime, finisatinterior i exteriorFinisaje pentru hale industriale

    Instala

    ii func

    ionale pentru hale industriale pag.71,72 41Halde depozitare cu structurpe cadre de din betonarmat i nchidere cu panouri izolatoare de tip izopanHalindustrialdin europrofile zincatecu o deschidere de 12m pag.73,76 42Halindustrialdin europrofile zincatecu o deschidere de 14mHalindustrialdin europrofile zincate

    cu o deschidere de 17mHalindustrialdin europrofile zincatecu o deschidere de 20m pag.77,78,79 43Halindustrialdin europrofile zincatecu doudeschideri de 12mHalindustrialdin europrofile zincatecu doudeschideri de 14mHalindustrialdin europrofile zincate

    cu doudeschideri de 17m pag.80,81,82 44Halindustrialdin europrofile zincatecu doudeschideri de 20mHalindustrialcu panouri izolatoare tip isopangrosimea peretelui 10cm i nvelitoarea de 10cmHalindustrialcu panouri izolatoare tip isopangrosimea peretelui 16cm i nvelitoarea de 12cm pag.83,84,85 45

  • 8/10/2019 Indici de Actualizare 2014-2015

    8/117

    CLDIRI INDUSTRIALE Numrul paginilor din crile de baz Pag.Haldepozit cu stlpi prefabricai de 4m n fundaii tippahar, deschidere de 9m i acoperide tip chesonCldire veche industrialSp+P+1E(depozite i atelier de producie) pag.75,86 46Costuri cldire P+1E (halproducie+depozit)Costuri cldire P+2E (vestiare+birouri) pag.86,87 47BaracmetalicCabinpoarti cuvde beton aferent pod basculConducte tehnologice pozate pe console metaliceSuport metalic pentru susinerea conductelor tehnologice pag.89,90,91 48Canale pardosealcu hidroizolaie lateralCosturi cuvaferent reparaii autoCosturi inde rulareCosturi scaun tamponCosturi fundaie utilaj pag.92,93 49Tipuri de cabluri aferente instalaiei de for1.Cabluri cu 3-4 fire cu seciunile ntre 4-35mm22.Cabluri cu nul de protecie cu 3 fire, cu seciunile

    ntre 25-120mm2

    pag.94 503.Pod tip cablu electric zincat pag.94 51CLDIRI COMERCIALE Numrul paginilor din crile de baz Pag.Cldire parter frsubsol cu destinaia magazinCldire parter de tip supermarket pag.99,100 52Cldire comercialindependentde tip magazin S+P+2E pag.101 53Cldire comercialindependentde tip magazin S+P+3E pag.103 54Spaiu comercial (frcorp extindere) situat la parterul

    blocului de apartamente tip P+4E, inlime magazin 3,25mSpaiu comercial (frcorp extindere) situat la parterulblocului de apartamente tip P+4E, nlime magazin 3,50m pag.105,106 55Spaiu comercial (frcorp extindere) situat la parterulblocului de apartamente tip P+4E, inlime magazin 3,75mSpaiu comercial (frcorp extindere) situat la parterulblocului de apartamente tip P+4E, inlime magazin 4,00m pag.107,108 56

  • 8/10/2019 Indici de Actualizare 2014-2015

    9/117

    CLDIRI COMERCIALE Numrul paginilor din crile de baz Pag.Spaiu comercial (frcorp extindere) situat la parterulblocului de apartamente tip P+8E, inlime magazin 3,25mSpaiu comercial (frcorp extindere) situat la parterul

    blocului de apartamente tip P+8E, inlime magazin 3,50m pag.109,110 57Spaiu comercial (frcorp extindere) situat la parterulblocului de apartamente tip P+8E, inlime magazin 3,75mSpaiu comercial (frcorp extindere) situat la parterulblocului de apartamente tip P+8E, inlime magazin 4,00m pag.111,112 58Spaiu comercial (frcorp extindere) situat la parterulblocului de apartamente tip P+10E, inlime magazin 3,25mSpaiu comercial (frcorp extindere) situat la parterulblocului de apartamente tip P+10E, inlime magazin 3,50m pag.113,114 59Spaiu comercial (frcorp extindere) situat la parterulblocului de apartamente tip P+10E, inlime magazin 3,75mSpaiu comercial (frcorp extindere) situat la parterulblocului de apartamente tip P+10E, inlime magazin 4,00m pag.115,116 60Corp extindere spaiu comercial situat la parterul bloculuide apartamente tip P+4E, P+8E sau P+10E, nlime 3,25m

    Corp extindere spaiu comercial situat la parterul bloculuide apartamente tip P+4E, P+8E sau P+10E, nlime 3,50m pag.117,118 61Corp extindere spaiu comercial situat la parterul bloculuide apartamente tip P+4E, P+8E sau P+10E, nlime 3,75mCorp extindere spaiu comercial situat la parterul bloculuide apartamente tip P+4E, P+8E sau P+10E, nlime 4,00m pag.119,120 62Cldire cu destinaia showroom + service autoCldire cu destinaia showroom auto pag.121,123 63

    Cldire de tip benzinrie pag.125 64Chioc pag.126 65Cldire de birouri - clasa A pag.127 66Cldire de birouri i spaii arhiv clasa A pag.129 67Cldire de birouri cu structurpe zidrie portantparter+mansard clasa BCldire de birouri P+1E n interiorul halei industriale(birouri cu supantpe structurmetalicindependent) pag.130,132 68

  • 8/10/2019 Indici de Actualizare 2014-2015

    10/117

    CLDIRI COMERCIALE Numrul paginilor din crile de baz Pag.Cldire S+P+8E cu destinaia hotel 2 stele pag.133 69Cldire S+P+8E cu destinaia hotel 3 stele pag.135 70Cldire S+P+8E cu destinaia hotel 4 stele pag.137 71

    Cldire S+P+8E cu destinaia hotel 5 stele pag.139 72Cldire S+P+10E cu destinaia hotel 2 stele pag.141 73Cldire S+P+10E cu destinaia hotel 3 stele pag.143 74Cldire S+P+10E cu destinaia hotel 4 stele pag.145 75Cldire S+P+10E cu destinaia hotel 5 stele pag.147 76Cldire cu destinaia pensiune 2 margarete pag.149 77Cldire cu destinaia pensiune 3 margarete pag.152 78Cldire cu destinaia pensiune 4 margarete pag.155 79Cldire cu destinaia pensiune 5 margarete pag.158 80Cldire cu destinaia motel pag.161 81Cldire cu destinaia casde vacan pag.163 82Cldire cu destinaia caban pag.164 83CLDIRI AGRICOLE Numrul paginilor din crile de baz Pag.Cldire cu destinaia grajd pentru porcine - tip nouCldire cu destinaia grajd pentru bovine

    i porcine - tip vechi pag.168,169 84Cldire cu destinaia grajd pentru bovine - tip nouCldire cu destinaia adpost pentru psri tip vechi pag.170,171 85Halparter (tip nou) pentru creterea n sistem intensiva ginilor i puilorHalparter + etaj (tip nou) pentru creterea n sistemintensiv a ginilor i a puilor pag.172,173 86Cldire cu destinaie magazie pentru cereale

    Siloz pentru cereale 60.000 70.000 toneSiloz pentru cereale 71.000 80.000 toneSiloz pentru cereale 81.000 90.000 tone pag.174,175,176,177 87Silozuri cu structurmetalicgalvanizatCldire de tip ptul porumbopron cu structurmetalicopron cu structurlemn pag.178,179,180,181 88Sernclzit

    Construcie de tip solar pag.182,183 89

  • 8/10/2019 Indici de Actualizare 2014-2015

    11/117

    CLDIRI AGRICOLE Numrul paginilor din crile de baz Pag.Silozuri cu structurmecanicgalvanizat pag.178 90CONSTRUCII SPECIALE Numrul paginilor din crile de baz Pag.Costuri spturi, umpluturi i sprijiniri maluri aferente

    reelelor exterioare de canalizareCosturi reele de canalizare executate cu tuburi din beton,P.V.C. i font pag.188 91Costuri spturi pentru cmine canalizareCosturi materiale cmine canalizare din tuburi de beton pag.189,190 92Costuri reele de apCosturi cmine de ap(include spturi umpluturde pmnt) pag.192,193 93Costuri sptur+ pat nisip + umpluturaferentebranamentelor de apCosturi rezervor api caspompe rezervoare ngropateCosturi rezervor api caspompe rezervoare semingropateCosturi fossepticvidanjabili decantor ape uzate

    Costuri castel de ap pag.193,197,198,204 94Costuri spturaferentcablurilor electriceCabluri electrice aferente instalaiei de forCosturi canale de termoficare ngropate pag.194,195 95Costuri conducte de termoficare montate n canaletermice subterane pag.196 96Stlpi pentru reeaua electric pag.207 97Costuri drumuri, platforme, alei i cale feratindustrial

    Costuri soclu gard din beton aparentCosturi finisaj socluCosturi mprejmuiri pag.199,201,200 98Costuri panouri gardCosturi estacade pag.202,203 99Costuri copertinmetalicla benzinrie pag.205 100Costuri puuri forate pag.206 101

  • 8/10/2019 Indici de Actualizare 2014-2015

    12/117

    CLDIRI REZIDENIALE

  • 8/10/2019 Indici de Actualizare 2014-2015

    13/117

    FUNDAII CONTINUE FUNDAIE CU SUBSOL

    Tip fundatie Varianta pret indice cost actualizat Tip fundatie pret indice cost actualizatcarte 2014 - 2015 2014 - 2015 carte 2014 - 2015 2014 - 2015

    Beton simplu V1 359,3 1,0437 375,0 Subsol parialFCBS V2 475,0 1,0437 495,8 FSUBSPAR 1.178,60 1,0664 1.256,9

    V3 583,2 1,0437 608,7Beton simplu V1 395,2 1,0478 414,1 Subsol total

    si cuzinei armai V2 507,4 1,0478 531,7 FSUBSTOT 1.795,40 1,0850 1.948,0FC V3 649,4 1,0478 680,4

    Izolatn trepte V1 509,0 1,0560 537,5sub stlp V2 629,3 1,0560 664,5

    FI V3 695,3 1,0560 734,2Grind V1 624,0 1,0704 667,9

    continu V2 761,2 1,0704 814,8GRFUN V3 910,4 1,0704 974,5 pag. carte: 11 i 13

    Indicii de actualizare prezentai conin i indicele de cretere a TVA de la 19% la 24%.

    Exemplu: Pentru o cldire cu Sc = 90 mp, avndo fundaie de tip FC - V2, amplasatntr-o localitate cu treapta III-a de salarizare i la10 Km distande transport materiale, costul de nlocuire de nou al fundaiei devine:

    Cost de nou = 90 mp x 531,70 lei/mp = 47.853 lei (TVA inclus).

    Not: pentru cazul infrastructurilor cu variante diferite de fundare, cum ar fi fundaiile cu susbsol parial sau fundaiile de betonsimplu adiacente fundaiilor continui de beton armat, se vor utiliza indicii de actualizare specifici tipului de funda ie existent.

    pag.1

    INDICI DE ACTUALIZARE A COSTURILOR ELEMENTELOR SUBSISTEMELOR STRUCTURALEAUGUST 2014 - AUGUST 2015

  • 8/10/2019 Indici de Actualizare 2014-2015

    14/117

    STRUCTURCLDIRE PARTER (FRSCAR) GRADUL SEISMIC 6Tip zidrie Grosime Simbol pret indice cost actualizat

    carte 2014 - 2015 2014 - 2015Zidrie 24 6ZIDCAR24PFS 638,2 1,1024 703,6

    crmid 30 6ZIDCAR30PFS 670,1 1,1024 738,737,5 6ZIDCAR37PFS 791,8 1,1024 872,9

    Zidrie 24 6ZBCA24PFS 611,5 0,9171 560,8BCA 30 6ZBCA30PFS 616,2 0,9171 565,1

    35 6ZBCA35PFS 644,8 0,9171 591,3Zidrie 24 6ZBOL24PFS 529,6 1,0278 544,3bolari 29 6ZBOL29PFS 564,6 1,0278 580,3Zidrie 24 6ZPOROT24PFS 599,7 0,9508 570,2

    porotherm 30 6ZPOROT30PFS 677,2 0,9508 643,9STRUCTURCLDIRE PARTER (FRSCAR) GRADUL SEISMIC 7

    Tip zidrie Grosime Simbol pret indice cost actualizatcarte 2014 - 2015 2014 - 2015

    Zidrie 24 7ZIDCAR24PFS 656,9 1,0853 712,9crmid 30 7ZIDCAR30PFS 688,8 1,0853 747,5

    37,5 7ZIDCAR37PFS 810,6 1,0853 879,7Zidrie 24 7ZBCA24PFS 630,2 0,9048 570,2

    BCA 30 7ZBCA30PFS 634,0 0,9048 573,6

    35 7ZBCA35PFS 662,7 0,9048 599,6Zidrie 24 7ZBOL24PFS 547,5 1,0192 558,0bolari 29 7ZBOL29PFS 583,4 1,0192 594,6Zidrie 24 7ZPOROT24PFS 617,6 0,9371 578,7

    porotherm 30 7ZPOROT30PFS 696,0 0,9371 652,2STRUCTURCLDIRE PARTER (FRSCAR) GRADUL SEISMIC 8

    Tip zidrie Grosime Simbol pret indice cost actualizatcarte 2014 - 2015 2014 - 2015

    Zidrie 24 8ZIDCAR24PFS 675,7 1,0681 721,7crmid 30 8ZIDCAR30PFS 707,6 1,0681 755,8

    37,5 8ZIDCAR37PFS 829,3 1,0681 885,8Zidrie 24 8ZBCA24PFS 649,0 0,8925 579,2

    BCA 30 8ZBCA30PFS 651,9 0,8925 581,835 8ZBCA35PFS 680,5 0,8925 607,3

    Zidrie 24 8ZBOL24PFS 565,5 1,0106 571,5bolari 29 8ZBOL29PFS 602,3 1,0106 608,7Zidrie 24 8ZPOROT24PFS 635,5 0,9233 586,8

    porotherm 30 8ZPOROT30PFS 714,8 0,9233 660,0 pag.2

    AUGUST 2014 - AUGUST 2015

    pag. carte: 15

    pag. carte: 16

    pag. carte: 17

  • 8/10/2019 Indici de Actualizare 2014-2015

    15/117

    STRUCTURCLDIRE PARTER (FRSCAR) GRADUL SEISMIC 9Tip zidrie Grosime Simbol pret indice cost actualizat

    carte 2014 - 2015 2014 - 2015Zidrie 24 9ZIDCAR24PFS 694,5 1,0510 729,9

    crmid 30 9ZIDCAR30PFS 726,4 1,0510 763,437,5 9ZIDCAR37PFS 848,1 1,0510 891,3

    Zidrie 24 9ZBCA24PFS 667,8 0,8802 587,8BCA 30 9ZBCA30PFS 669,8 0,8802 589,6

    35 9ZBCA35PFS 698,4 0,8802 614,7Zidrie 24 9ZBOL24PFS 583,4 1,0020 584,6bolari 29 9ZBOL29PFS 621,1 1,0020 622,3Zidrie 24 9ZPOROT24PFS 653,4 0,9095 594,3

    porotherm 30 9ZPOROT30PFS 733,6 0,9095 667,2STRUCTURCLDIRE PARTER (CU SCAR) GRADUL SEISMIC 6

    Tip zidrie Grosime Simbol pret indice cost actualizatcarte 2014 - 2015 2014 - 2015

    Zidrie 24 6ZIDCAR24PS 665,0 1,0768 716,1crmid 30 6ZIDCAR30PS 696,9 1,0768 750,4

    37,5 6ZIDCAR37PS 818,6 1,0768 881,5Zidrie 24 6ZBCA24PS 638,3 0,9025 576,1

    BCA 30 6ZBCA30PS 643,0 0,9025 580,3

    35 6ZBCA35PS 671,6 0,9025 606,1Zidrie 24 6ZBOL24PS 556,4 1,0118 563,0bolari 29 6ZBOL29PS 591,4 1,0118 598,4Zidrie 24 6ZPOROT24PS 626,5 0,9612 602,2

    porotherm 30 6ZPOROT30PS 704,0 0,9612 676,7STRUCTURCLDIRE PARTER (CU SCAR) GRADUL SEISMIC 7

    Tip zidrie Grosime Simbol pret indice cost actualizatcarte 2014 - 2015 2014 - 2015

    Zidrie 24 7ZIDCAR24PS 683,6 1,0610 725,3

    crmid 30 7ZIDCAR30PS 715,5 1,0610 759,137,5 7ZIDCAR37PS 837,2 1,0610 888,3

    Zidrie 24 7ZBCA24PS 656,9 0,8922 586,1BCA 30 7ZBCA30PS 659,4 0,8922 588,3

    35 7ZBCA35PS 688,0 0,8922 613,8Zidrie 24 7ZBOL24PS 573,0 1,0053 576,0bolari 29 7ZBOL29PS 610,1 1,0053 613,3Zidrie 24 7ZPOROT24PS 643,0 0,9432 606,5

    porotherm 30 7ZPOROT30PS 722,6 0,9432 681,6 pag.3

    AUGUST 2014 - AUGUST 2015

    pag. carte: 18

    pag. carte: 19

    pag. carte: 20

  • 8/10/2019 Indici de Actualizare 2014-2015

    16/117

    STRUCTURCLDIRE PARTER (CU SCAR) GRADUL SEISMIC 8Tip zidrie Grosime Simbol pret indice cost actualizat

    carte 2014 - 2015 2014 - 2015Zidrie 24 8ZIDCAR24PS 702,4 1,0453 734,2

    crmid 30 8ZIDCAR30PS 734,3 1,0453 767,637,5 8ZIDCAR37PS 856,0 1,0453 894,8

    Zidrie 24 8ZBCA24PS 675,7 0,8818 595,8BCA 30 8ZBCA30PS 677,3 0,8818 597,2

    35 8ZBCA35PS 705,9 0,8818 622,5Zidrie 24 8ZBOL24PS 590,9 0,9988 590,2bolari 29 8ZBOL29PS 629,0 0,9988 628,2Zidrie 24 8ZPOROT24PS 660,9 0,9253 611,5

    porotherm 30 8ZPOROT30PS 741,4 0,9253 686,0STRUCTURCLDIRE PARTER CU SCAR) GRADUL SEISMIC 9

    Tip zidrie Grosime Simbol pret indice cost actualizatcarte 2014 - 2015 2014 - 2015

    Zidrie 24 9ZIDCAR24FPS 721,2 1,0296 742,5crmid 30 9ZIDCAR30FPS 753,1 1,0296 775,4

    37,5 9ZIDCAR37FPS 874,7 1,0296 900,5Zidrie 24 9ZBCA24FPS 694,5 0,8715 605,3

    BCA 30 9ZBCA30FPS 695,2 0,8715 605,9

    35 9ZBCA35FPS 723,8 0,8715 630,8Zidrie 24 9ZBOL24FPS 608,8 0,9923 604,1bolari 29 9ZBOL29FPS 647,8 0,9923 642,8Zidrie 24 9ZPOROT24PFS 678,8 0,9074 615,9

    porotherm 30 9ZPOROT30PFS 760,2 0,9074 689,8STRUCTURETAJ (FRSCAR) GRADUL SEISMIC 6

    Tip zidrie Grosime Simbol pret indice cost actualizatcarte 2014 - 2015 2014 - 2015

    Zidrie 24 6ZIDCAR24EFS 638,2 1,1024 703,6

    crmid 30 6ZIDCAR30EFS 670,1 1,1024 738,737,5 6ZIDCAR37EFS 791,8 1,1024 872,9

    Zidrie 24 6ZBCA24EFS 611,5 0,8715 532,9BCA 30 6ZBCA30EFS 616,2 0,8715 537,0

    35 6ZBCA35EFS 644,8 0,8715 561,9Zidrie 24 6ZBOL24EFS 529,6 1,0278 544,3bolari 29 6ZBOL29EFS 564,6 1,0278 580,3Zidrie 24 6ZPOROT24EFS 599,7 0,9508 570,2

    porotherm 30 6ZPOROT30EFS 677,2 0,9508 643,9 pag.4

    pag. carte: 21

    pag. carte: 22

    pag. carte: 23

    AUGUST 2014 - AUGUST 2015

  • 8/10/2019 Indici de Actualizare 2014-2015

    17/117

    STRUCTURETAJ (FRSCAR) GRADUL SEISMIC 7Tip zidrie Grosime Simbol pret indice cost actualizat

    carte 2014 - 2015 2014 - 2015Zidrie 24 7ZIDCAR24EFS 656,9 1,0853 712,9

    crmid 30 7ZIDCAR30EFS 688,8 1,0853 747,637,5 7ZIDCAR37EFS 810,6 1,0853 879,7

    Zidrie 24 7ZBCA24EFS 630,2 0,8715 549,2BCA 30 7ZBCA30EFS 634,0 0,8715 552,5

    35 7ZBCA35EFS 662,7 0,8715 577,5Zidrie 24 7ZBOL24EFS 547,5 1,0192 558,0bolari 29 7ZBOL29EFS 583,4 1,0192 594,6Zidrie 24 7ZPOROT24EFS 617,6 0,9371 578,8

    porotherm 30 7ZPOROT30EFS 696,0 0,9371 652,2STRUCTURETAJ (FRSCAR) GRADUL SEISMIC 8

    Tip zidrie Grosime Simbol pret indice cost actualizatcarte 2014 - 2015 2014 - 2015

    Zidrie 24 8ZIDCAR24EFS 675,7 1,0681 721,7crmid 30 8ZIDCAR30EFS 707,6 1,0681 755,8

    37,5 8ZIDCAR37EFS 829,3 1,0681 885,8Zidrie 24 8ZBCA24EFS 649,0 0,8925 579,2

    BCA 30 8ZBCA30EFS 651,9 0,8925 581,8

    35 8ZBCA35EFS 680,5 0,8925 607,3Zidrie 24 8ZBOL24EFS 565,5 1,0106 571,5bolari 29 8ZBOL29EFS 602,3 1,0106 608,7Zidrie 24 8ZPOROT24EFS 635,5 0,9233 586,8

    porotherm 30 8ZPOROT30EFS 714,8 0,9233 660,0STRUCTURETAJ (FRSCAR) GRADUL SEISMIC 9

    Tip zidrie Grosime Simbol pret indice cost actualizatcarte 2014 - 2015 2014 - 2015

    Zidrie 24 9ZIDCAR24EFS 694,5 1,0510 729,9

    crmid 30 9ZIDCAR30EFS 726,4 1,0510 763,437,5 9ZIDCAR37EFS 848,1 1,0510 891,4

    Zidrie 24 9ZBCA24EFS 667,8 0,8802 587,8BCA 30 9ZBCA30EFS 669,8 0,8802 589,6

    35 9ZBCA35EFS 698,4 0,8802 614,7Zidrie 24 9ZBOL24EFS 583,4 1,0020 584,6bolari 29 9ZBOL29EFS 621,1 1,0020 622,3Zidrie 24 9ZPOROT24EFS 653,4 0,9095 594,3

    porotherm 30 9ZPOROT30EFS 733,6 0,9095 667,2 pag.5

    pag. carte: 24

    AUGUST 2014 - AUGUST 2015

    pag. carte: 25

    pag. carte: 26

  • 8/10/2019 Indici de Actualizare 2014-2015

    18/117

    STRUCTURETAJ (CU SCAR) GRADUL SEISMIC 6Tip zidrie Grosime Simbol pret indice cost actualizat

    carte 2014 - 2015 2014 - 2015Zidrie 24 6ZIDCAR24ES 665,0 1,0768 716,1

    crmid 30 6ZIDCAR30ES 696,9 1,0768 750,437,5 6ZIDCAR37ES 818,6 1,0768 881,5Zidrie 24 6ZBCA24ES 638,3 0,9025 576,1

    BCA 30 6ZBCA30ES 643,0 0,9025 580,335 6ZBCA35ES 671,6 0,9025 606,1

    Zidrie 24 6ZBOL24ES 556,4 1,0118 563,0bolari 29 6ZBOL29ES 591,4 1,0118 598,4Zidrie 24 6ZPOROT24ES 626,5 0,9612 602,2

    porotherm 30 6ZPOROT30ES 704,0 0,9612 676,7STRUCTURETAJ (CU SCAR) GRADUL SEISMIC 7

    Tip zidrie Grosime Simbol pret indice cost actualizatcarte 2014 - 2015 2014 - 2015

    Zidrie 24 7ZIDCAR24ES 683,6 1,0610 725,3crmid 30 7ZIDCAR30ES 715,5 1,0610 759,1

    37,5 7ZIDCAR37ES 837,2 1,0610 888,3Zidrie 24 7ZBCA24ES 656,9 0,8922 586,1

    BCA 30 7ZBCA30ES 659,4 0,8922 588,3

    35 7ZBCA35ES 688,0 0,8922 613,8Zidrie 24 7ZBOL24ES 573,0 1,0053 576,0bolari 29 7ZBOL29ES 610,1 1,0053 613,3Zidrie 24 7ZPOROT24ES 643,0 0,9432 606,5

    porotherm 30 7ZPOROT30ES 722,6 0,9432 681,6STRUCTURETAJ (CU SCAR) GRADUL SEISMIC 8

    Tip zidrie Grosime Simbol pret indice cost actualizatcarte 2014 - 2015 2014 - 2015

    Zidrie 24 8ZIDCAR24ES 702,4 1,0453 734,2

    crmid 30 8ZIDCAR30ES 734,3 1,0453 767,637,5 8ZIDCAR37ES 856,0 1,0453 894,8

    Zidrie 24 8ZBCA24ES 675,7 0,8818 595,8BCA 30 8ZBCA30ES 677,3 0,8818 597,2

    35 8ZBCA35ES 705,9 0,8818 622,5Zidrie 24 8ZBOL24ES 590,9 0,9988 590,2bolari 29 8ZBOL29ES 629,0 0,9988 628,2Zidrie 24 8ZPOROT24ES 660,9 0,9253 611,5

    porotherm 30 8ZPOROT30ES 741,4 0,9253 686,0 pag.6

    pag. carte: 27

    pag. carte: 28

    AUGUST 2014 - AUGUST 2015

    pag. carte: 29

  • 8/10/2019 Indici de Actualizare 2014-2015

    19/117

    STRUCTURETAJ (CU SCAR) GRADUL SEISMIC 9Tip zidrie Grosime Simbol pret indice cost actualizat

    carte 2014 - 2015 2014 - 2015Zidrie 24 9ZIDCAR24ES 721,2 1,0296 742,5

    crmid 30 9ZIDCAR30ES 753,1 1,0296 775,437,5 9ZIDCAR37ES 874,7 1,0296 900,6Zidrie 24 9ZBCA24ES 694,5 0,8715 605,3

    BCA 30 9ZBCA30ES 695,2 0,8715 605,935 9ZBCA35ES 723,8 0,8715 630,8

    Zidrie 24 9ZBOL24ES 608,8 0,9923 604,1bolari 29 9ZBOL29ES 647,8 0,9923 642,8Zidrie 24 9ZPOROT24ES 678,8 0,9074 615,9

    porotherm 30 9ZPOROT30ES 760,2 0,9074 689,8MANSARDGRADUL SEISMIC 6

    Tip zidrie Grosime Simbol pret indice cost actualizatcarte 2014 - 2015 2014 - 2015

    Zidrie 24 6ZIDCAR24M 300,3 1,0646 319,7crmid 30 6ZIDCAR30M 337,5 1,0646 359,3

    37,5 6ZIDCAR37M 378,8 1,0646 403,3Zidrie 24 6ZBCA24M 285,0 0,9890 281,9

    BCA 30 6ZBCA30M 315,8 0,9890 312,3

    35 6ZBCA35M 347,8 0,9890 344,0Zidrie 24 6ZBOL24M 250,2 1,0477 262,1bolari 29 6ZBOL29M 272,2 1,0477 285,2Zidrie 24 6ZPOROT24M 292,7 1,0707 313,4

    porotherm 30 6ZPOROT30M 320,4 1,0707 343,1MANSARDGRADUL SEISMIC 7

    Tip zidrie Grosime Simbol pret indice cost actualizatcarte 2014 - 2015 2014 - 2015

    Zidrie 24 7ZIDCAR24M 302,5 1,0679 323,0

    crmid 30 7ZIDCAR30M 342,1 1,0679 365,337,5 7ZIDCAR37M 381,2 1,0679 407,1

    Zidrie 24 7ZBCA24M 295,3 0,8996 265,7BCA 30 7ZBCA30M 331,7 0,8996 298,4

    35 7ZBCA35M 363,5 0,8996 327,0Zidrie 24 7ZBOL24M 252,3 1,0580 266,9bolari 29 7ZBOL29M 274,3 1,0580 290,2Zidrie 24 7ZPOROT24M 294,8 1,0486 309,1

    porotherm 30 7ZPOROT30M 322,5 1,0486 338,2 pag.7

    pag. carte: 30

    pag. carte: 31

    pag. carte: 32

    AUGUST 2014 - AUGUST 2015

  • 8/10/2019 Indici de Actualizare 2014-2015

    20/117

    MANSARDGRADUL SEISMIC 8Tip zidrie Grosime Simbol pret indice cost actualizat

    carte 2014 - 2015 2014 - 2015Zidrie 24 8ZIDCAR24M 307,0 1,0711 328,8

    crmid 30 8ZIDCAR30M 354,5 1,0711 379,737,5 8ZIDCAR37M 386,1 1,0711 413,6Zidrie 24 8ZBCA24M 316,1 0,8102 256,1

    BCA 30 8ZBCA30M 346,9 0,8102 281,135 8ZBCA35M 374,0 0,8102 303,0

    Zidrie 24 8ZBOL24M 256,6 1,0682 274,1bolari 29 8ZBOL29M 278,6 1,0682 297,6Zidrie 24 8ZPOROT24M 299,1 1,0264 307,0

    porotherm 30 8ZPOROT30M 326,8 1,0264 335,4MANSARDGRADUL SEISMIC 9

    Tip zidrie Grosime Simbol pret indice cost actualizatcarte 2014 - 2015 2014 - 2015

    Zidrie 24 9ZIDCAR24M 309,2 1,0743 332,2crmid 30 9ZIDCAR30M 355,8 1,0743 382,2

    37,5 9ZIDCAR37M 388,5 1,0743 417,4Zidrie 24 9ZBCA24M 326,3 0,8208 267,8

    BCA 30 9ZBCA30M 379,2 0,8208 311,2

    35 9ZBCA35M 410,5 0,8208 336,9Zidrie 24 9ZBOL24M 258,7 1,0784 279,0bolari 29 9ZBOL29M 280,7 1,0784 302,7Zidrie 24 9ZPOROT24M 301,1 1,0042 302,4

    porotherm 30 9ZPOROT30M 328,9 1,0042 330,3

    pag.8

    pag. carte: 33

    pag. carte: 34

    AUGUST 2014 - AUGUST 2015

  • 8/10/2019 Indici de Actualizare 2014-2015

    21/117

    NVELITORI I TERASETip nvelitoare / teras pret indice cost actualizat

    carte 2014 - 2015 2014 - 2015nvelitoare tablzincat(INVTZ) 226,4 1,0953 248,0

    nvelitare tablLindab (INVTL) 340,4 1,0188 346,8nvelitoare iglprofilatceramic(INVTIG) 363,4 1,0657 387,3Terasnecirculabil(TERNE) 439,4 1,0517 462,1Terascirculabilcu balustraddin inox (TERCIRC) 952,5 1,0254 976,7FINISAJE INTERIOARE SI EXTERIOARETip finisaj pret indice cost actualizat

    carte 2014 - 2015 2014 - 2015Finisaj obinuit frscar(FOBFS) 918,1 1,0284 944,2Finisaj superior frscar(FSUPFS) 1.253,6 0,9077 1.137,9

    Finisaj obinuit mansardcu tavan gipscarton (FOMANS) 608,3 1,0622 646,1FINISAJE SCARTip scar pret indice cost actualizat

    carte 2014 - 2015 2014 - 2015Scarobinuitcu trepte mozaicate i parapet din lemn (SCAMOZ) 3.563,5 1,0050 3.581,3Scarobinuitcu trepte gresie i parapet din lemn (SCAGRES) 3.662,2 0,9695 3.550,5Scarsuperioarcu trepte stejar i balustraddin inox (SCASTEJA) 10.887,6 1,1684 12.721,1Scarsuperioarcu trepte marmuri balustraddin inox (SCAMARM) 15.413,6 0,7271 11.207,2

    COSTUL DE EXECUIE AFERENT FINISAJELOR DE FAADDenumire faad pret indice cost actualizatcarte 2014 - 2015 2014 - 2015

    Finisaj similipiatrcu asize de 3 cm 403,8 1,0160 410,3Placare cu crmidbratca 384,5 1,0295 395,8Finisaj termosistem la soclu faad(polistiren extrudatde 10 cm) 329,0 1,0004 329,1Finisaj similipiatrcu asize de 1 cm 238,9 0,9717 232,1Faadcu terasit 222,4 0,9508 211,5Faadcu praf de piatr 221,3 0,9280 205,4

    Tencuialtip strop cu ciment alb 218,5 1,0402 227,3Finisaj termosistem la faad(polistiren expandat de 5 cm) 165,2 0,9786 161,7Finisaj cu tencuialdricuiti vinarom 149,4 0,9134 136,5Faadplacatcu alucobond 449,8 1,0170 457,4Finisaj termosistem la faad(polistiren expandat de 10 cm grosime) 251,6 1,0000 251,6 nou

    pag.9

    pag. carte: 35

    pag. carte: 35

    pag. carte: 36

    pag. carte: 35

    AUGUST 2014 - AUGUST 2015

  • 8/10/2019 Indici de Actualizare 2014-2015

    22/117

    INSTALAII FUNCIONALEElectriceTip instalaie electric pret carte indice cost actualizatInstalaii electrice de iluminat, prize monofazate i trasee de cureni

    slabi (ELINGR) 82,4 1,0296 84,8nclzireTip instalaie de nclzire pret carte indice cost actualizatnclzire cu convectoradiatoare(INCCONV) 113,1 0,9799 110,8nclzire cu traseu eavcupru i corp static din font, bimetal(INCELFS) 172,5 0,9136 157,6SanitareTip insalaie sanitar pret carte indice cost actualizatChiuvetfont+ baterie amestec

    (sanitare obinuite) CHFOBO 1.159,7 0,9457 1.096,7Chiuvetinox + baterie amestec(sanitare cal.superioar) CHINOX 1.705,5 0,8910 1.519,5Lavoar + WC(sanitare obinuite) LAVWC 1.424,6 1,0121 1.441,8Lavoar + WC(sanitare cal.superioar) LAVWCSUP 5.460,3 0,8809 4.810,2Cuvdu+ lavoar + WC

    (sanitare obinuite) DUSLAWC 2.561,8 0,9802 2.511,1Du+ cabin+ lavoar + WC(sanitare cal.superioar) DUSLAWCS 6.544,0 0,9714 6.356,9Cadfont+ lavoar + WC(sanitare obinuite) CALAWC 3.642,0 1,1783 4.291,2Cada jacuzzi + lavoar + WC(sanitare cal.superioar) CAJALAWC 11.366,3 1,1382 12.937,3

    Indicii de actualizare conin i creterea TVA de la 19% la 24 %

    pag.10

    pag. carte: 37

    AUGUST 2014 - AUGUST 2015

    pag. carte: 37

    pag. carte: 37

  • 8/10/2019 Indici de Actualizare 2014-2015

    23/117

    STRUCTURBLOC P+4E+SUBSOL TEHNIC AUGUST 2014 - AUGUST 2015Denumire Simbol pret indice cost actualizat

    carte 2014 - 2015 2014 - 2015Gradul seismic 6 6BLOC4E 1.007,1 1,0325 1.039,8

    Gradul seismic 7 7BLOC4E 1.048,6 1,0325 1.082,7Gradul seismic 8 8BLOC4E 1.095,3 1,0325 1.130,9Gradul seismic 9 9BLOC4E 1.189,9 1,0325 1.228,6

    TERAS,FINISAJE I INSTALAII FUNCIONALE ELECTRICE I DE NCLZIRE BLOC P+4E+SUBSOL TEHNICDenumire Simbol pret indice cost actualizat

    carte 2014 - 2015 2014 - 2015TerasTerasnecirculabil TERNE4E 87,9 1,0517 92,4

    FinisajFinisaj obinuit frscar FOBFS4E 918,1 1,0284 944,2Finisaj superior frscar FSUPFS4E 1.253,6 0,9077 1.137,9Instalaii electriceInstalaii electrice de iluminat, prizemonofazate i trasee de cureni slabi ELINGR4E 82,4 1,0296 84,8Instalaii de nclzirenclzire cu convectoradiatoare INCCONV4E 113,1 0,9799 110,8nclzire cu traseu din eavcupru i corp static

    din font, bimetal INCELFS4E 172,5 0,9136 157,6FINISAJ SCARBLOC P+4E+SUBSOL TEHNIC*costuri aferente scarcotparte pe apartament

    Nr.apartamente pe palier / Simbol Finisaj pret indice cost actualizatcarte 2014 - 2015 2014 - 2015

    2 apartamente pe nivel obinuit 1.781,7 1,0284 1.832,3FINSC2AP4E superior 7.706,8 0,9077 6.995,5

    3 apartamente pe nivel obinuit 1.187,8 1,0284 1.221,5

    FINSC3AP4E superior 5.137,9 0,9077 4.663,74 apartamente pe nivel obinuit 890,9 1,0284 916,2FINSC4AP4E superior 3.853,4 0,9077 3.497,7

    6 apartamente pe nivel obinuit 593,9 1,0284 610,8FINSC6AP4E superior 2.568,9 0,9077 2.331,8

    pag.11

    pag. carte: 39

    pag. carte: 40

    pag. carte: 40

  • 8/10/2019 Indici de Actualizare 2014-2015

    24/117

    ANSAMBLURI OBIECTE SANITARE OBINUITE BLOC P+4E+SUBSOL TEHNIC AUGUST 2014 - AUGUST 2015*costuri pe ansamblu sanitar

    Tipuri obiecte sanitare Simbol pret indice cost actualizatcarte 2014 - 2015 2014 - 2015

    1 CAMERChiuvetfont+ baterie amestec CHFOBO4E 1.159,7 0,9457 1.096,7Cadfont+ lavoar + WC CALAWC4E 3.642,0 1,1783 4.291,2TOTAL ANSAMBLURI 4.801,7 5.387,92 CAMEREChiuvetfont+ baterie amestec CHFOBO4E 1.159,7 0,9457 1.096,7Cadfont+ lavoar + WC CALAWC4E 3.642,0 1,1783 4.291,2TOTAL ANSAMBLURI 4.801,7 5.387,93 CAMERE V1

    Chiuvetfont+ baterie amestec CHFOBO4E 1.159,7 0,9457 1.096,7Cadfont+ lavoar + WC CALAWC4E 3.642,0 1,1783 4.291,2TOTAL ANSAMBLURI 4.801,7 5.387,93 CAMERE V2Chiuvetfont+ baterie amestec CHFOBO4E 1.159,7 0,9457 1.096,7Cadfont+ lavoar + WC CALAWC4E 3.642,0 1,1783 4.291,2Lavoar + WC LAVWC4E 1.424,6 1,0121 1.441,8TOTAL ANSAMBLURI 6.226,3 6.829,74 CAMERE V1

    Chiuvetfont+ baterie amestec CHFOBO4E 1.159,7 0,9457 1.096,7Cadfont+ lavoar + WC CALAWC4E 3.642,0 1,1783 4.291,2Lavoar + WC LAVWC4E 1.424,6 1,0121 1.441,8TOTAL ANSAMBLURI 6.226,3 6.829,74 CAMERE V2Chiuvetfont+ baterie amestec CHFOBO4E 1.159,7 0,9457 1.096,7Cadfont+ lavoar + WC CALAWC4E 3.642,0 1,1783 4.291,2Cuvdu+ lavoar + WC DUSLAWC4E 2.561,8 0,9803 2.511,3TOTAL ANSAMBLURI 7.363,5 7.899,1

    pag.12

    pag. carte: 41

  • 8/10/2019 Indici de Actualizare 2014-2015

    25/117

    ANSAMBLURI OBIECTE SANITARE CALITATE SUPERIOARBLOC P+4E+SUBSOL TEHNIC AUGUST 2014 - AUGUST 2015*costuri pe ansamblu sanitar

    Tipuri obiecte sanitare Simbol pret indice cost actualizatcarte 2014 - 2015 2014 -2015

    1 CAMERChiuvetinox + baterie amestec CHINOX4E 1.705,5 0,890956 1.519,5Cadjacuzzi + lavoar + WC CAJALAWC4E 11.366,3 1,138216 12.937,3TOTAL ANSAMBLURI 13.071,8 14.456,82 CAMEREChiuvetinox + baterie amestec CHINOX4E 1.705,5 0,890956 1.519,5Cadjacuzzi + lavoar + WC CAJALAWC4E 11.366,3 1,138216 12.937,3TOTAL ANSAMBLURI 13.071,8 14.456,83 CAMERE V1

    Chiuvetinox + baterie amestec CHINOX4E 1.705,5 0,890956 1.519,5Cadjacuzzi + lavoar + WC CAJALAWC4E 11.366,3 1,138216 12.937,3TOTAL ANSAMBLURI 13.071,8 14.456,83 CAMERE V2Chiuvetinox + baterie amestec CHINOX4E 1.705,5 0,890956 1.519,5Cadjacuzzi + lavoar + WC CAJALAWC4E 11.366,3 1,138216 12.937,3Lavoar + WC LAVWCSU4E 5.460,3 0,880947 4.810,2TOTAL ANSAMBLURI 18.532,1 19.267,14 CAMERE V1

    Chiuvetinox + baterie amestec CHINOX4E 1.705,5 0,890956 1.519,5Cadjacuzzi + lavoar + WC CAJALAWC4E 11.366,3 1,138216 12.937,3Lavoar + WC LAVWCSU4E 5.460,3 0,880947 4.810,2TOTAL ANSAMBLURI 18.532,1 19.267,14 CAMERE V2Chiuvetinox + baterie amestec CHINOX4E 1.705,5 0,890956 1.519,5Cadjacuzzi + lavoar + WC CAJALAWC4E 11.366,3 1,138216 12.937,3Du+ cabin+ lavoar + WC DUSLAWCS4E 6.544,0 0,971406 6.356,9TOTAL ANSAMBLURI 19.615,8 20.813,7

    pag.13

    pag. carte: 42

  • 8/10/2019 Indici de Actualizare 2014-2015

    26/117

    STRUCTURBLOC P+8E+SUBSOL TEHNIC AUGUST 2014 - AUGUST 2015Denumire Simbol pret indice cost actualizat

    carte 2014 - 2015 2014 - 2015Gradul seismic 6 6BLOC8E 833,4 1,0755 896,3

    Gradul seismic 7 7BLOC8E 867,8 1,0755 933,3Gradul seismic 8 8BLOC8E 906,4 1,0755 974,8Gradul seismic 9 9BLOC8E 984,7 1,0755 1.059,0

    TERAS,FINISAJE I INSTALAII FUNCIONALE ELECTRICE I DE NCLZIRE BLOC P+8E+SUBSOL TEHNICDenumire Simbol pret indice cost actualizat

    carte 2014 - 2015 2014 -2015TerasTerasnecirculabil TERNE8E 48,8 1,0517 51,3Finisaj

    Finisaj obinuit frscar FOBFS8E 918,1 1,0284 944,2Finisaj superior frscar FSUPFS8E 1.253,6 0,9077 1.137,9Instalaii electriceInstalaii electrice de iluminat, prizemonofazate i trasee de cureni slabi ELINGR8E 82,4 1,0296 84,8Instalaii de nclzirenclzire cu convectoradiatoare INCCONV8E 113,1 0,9799 110,8nclzire cu traseu din eavcupru i corp staticdin font, bimetal INCELFS8E 172,5 0,9136 157,6

    FINISAJ SCARBLOC P+8E+SUBSOL TEHNIC*costuri aferente scarcotparte pe apartament

    Nr.apartamente pe palier / Simbol Finisaj pret indice cost actualizatcarte 2014 - 2015 2014 - 2015

    2 apartamente pe nivel obinuit 1.781,7 1,0284 1.832,3FINSC2AP8E superior 7.706,8 0,9077 6.995,5

    3 apartamente pe nivel obinuit 1.187,8 1,0284 1.221,5FINSC3AP8E superior 5.137,9 0,9077 4.663,7

    4 apartamente pe nivel obinuit 890,9 1,0284 916,2FINSC4AP8E superior 3.853,4 0,9077 3.497,76 apartamente pe nivel obinuit 593,9 1,0284 610,8

    FINSC6AP8E superior 2.568,9 0,9077 2.331,8

    pag.14

    pag. carte: 44

    pag. carte: 43

    pag. carte: 44

  • 8/10/2019 Indici de Actualizare 2014-2015

    27/117

    ANSAMBLURI OBIECTE SANITARE OBINUITE BLOC P+8E+SUBSOL TEHNIC AUGUST 2014 - AUGUST 2015*costuri pe ansamblu sanitar

    Tipuri obiecte sanitare Simbol pret indice cost actualizatcarte 2014 - 2015 2014 - 2015

    1 CAMERChiuvetfont+ baterie amestec CHFOBO8E 1.159,7 0,9457 1.096,7Cadfont+ lavoar + WC CALAWC8E 3.642,0 1,1783 4.291,2TOTAL ANSAMBLURI 4.801,7 5.387,92 CAMEREChiuvetfont+ baterie amestec CHFOBO8E 1.159,7 0,9457 1.096,7Cadfont+ lavoar + WC CALAWC8E 3.642,0 1,1783 4.291,2TOTAL ANSAMBLURI 4.801,7 5.387,93 CAMERE V1

    Chiuvetfont+ baterie amestec CHFOBO8E 1.159,7 0,9457 1.096,7Cadfont+ lavoar + WC CALAWC8E 3.642,0 1,1783 4.291,2TOTAL ANSAMBLURI 4.801,7 5.387,93 CAMERE V2Chiuvetfont+ baterie amestec CHFOBO8E 1.159,7 0,9457 1.096,7Cadfont+ lavoar + WC CALAWC8E 3.642,0 1,1783 4.291,2Lavoar + WC LAVWC8E 1.424,6 1,0121 1.441,8TOTAL ANSAMBLURI 6.226,3 6.829,74 CAMERE V1

    Chiuvetfont+ baterie amestec CHFOBO8E 1.159,7 0,9457 1.096,7Cadfont+ lavoar + WC CALAWC8E 3.642,0 1,1783 4.291,2Lavoar + WC LAVWC8E 1.424,6 1,0121 1.441,8TOTAL ANSAMBLURI 6.226,3 6.829,74 CAMERE V2Chiuvetfont+ baterie amestec CHFOBO8E 1.159,7 0,9457 1.096,7Cadfont+ lavoar + WC CALAWC8E 3.642,0 1,1783 4.291,2Cuvdu+ lavoar + WC DUSLAWC8E 2.561,8 0,9803 2.511,3TOTAL ANSAMBLURI 7.363,5 7.899,1

    pag.15

    pag. carte: 45

  • 8/10/2019 Indici de Actualizare 2014-2015

    28/117

    ANSAMBLURI OBIECTE SANITARE CALITATE SUPERIOARBLOC P+8E+SUBSOL TEHNIC AUGUST 2014 - AUGUST 2015*costuri pe ansamblu sanitar

    Tipuri obiecte sanitare Simbol pret indice cost actualizatcarte 2014 - 2015 2014 - 2015

    1 CAMERChiuvetinox + baterie amestec CHINOX8E 1.705,5 0,8910 1.519,5Cadjacuzzi + lavoar + WC CAJALAWC8E 11.366,3 1,1382 12.937,3TOTAL ANSAMBLURI 13.071,8 14.456,82 CAMEREChiuvetinox + baterie amestec CHINOX8E 1.705,5 0,8910 1.519,5Cadjacuzzi + lavoar + WC CAJALAWC8E 11.366,3 1,1382 12.937,3TOTAL ANSAMBLURI 13.071,8 14.456,83 CAMERE V1

    Chiuvetinox + baterie amestec CHINOX8E 1.705,5 0,8910 1.519,5Cadjacuzzi + lavoar + WC CAJALAWC8E 11.366,3 1,1382 12.937,3TOTAL ANSAMBLURI 13.071,8 14.456,83 CAMERE V2Chiuvetinox + baterie amestec CHINOX8E 1.705,5 0,8910 1.519,5Cadjacuzzi + lavoar + WC CAJALAWC8E 11.366,3 1,1382 12.937,3Lavoar + WC LAVWCSU8E 5.460,3 0,8809 4.810,2TOTAL ANSAMBLURI 18.532,1 19.267,14 CAMERE V1

    Chiuvetinox + baterie amestec CHINOX8E 1.705,5 0,8910 1.519,5Cadjacuzzi + lavoar + WC CAJALAWC8E 11.366,3 1,1382 12.937,3Lavoar + WC LAVWCSU8E 5.460,3 0,8809 4.810,2TOTAL ANSAMBLURI 18.532,1 19.267,14 CAMERE V2Chiuvetinox + baterie amestec CHINOX8E 1.705,5 0,8910 1.519,5Cadjacuzzi + lavoar + WC CAJALAWC8E 11.366,3 0,8809 10.013,1Du+ cabin+ lavoar + WC DUSLAWCS8E 6.544,0 0,9714 6.356,9TOTAL ANSAMBLURI 19.615,8 17.889,5

    pag.16

    pag. carte: 46

  • 8/10/2019 Indici de Actualizare 2014-2015

    29/117

    STRUCTURBLOC P+10E+SUBSOL TEHNIC AUGUST 2014 - AUGUST 2015Denumire Simbol pret indice cost actualizat

    carte 2014 - 2015 2014 - 2015Gradul seismic 6 6BLOC10E 750,1 1,0523 789,3

    Gradul seismic 7 7BLOC10E 781,0 1,0523 821,8Gradul seismic 8 8BLOC10E 815,8 1,0523 858,5Gradul seismic 9 9BLOC10E 886,2 1,0523 932,5

    TERAS,FINISAJE I INSTALAII FUNCIONALE ELECTRICE I DE NCLZIRE BLOC P+10E+SUBSOL TEHNICDenumire Simbol pret indice cost actualizat

    carte 2014 - 2015 2014 - 2015TerasTerasnecirculabil TERNE10E 39,9 1,0517 42,0Finisaj

    Finisaj obinuit frscar FOBFS10E 918,1 1,0240 940,1Finisaj superior frscar FSUPFS10E 1.253,6 0,9077 1.137,9Instalaii electriceInstalaii electrice de iluminat, prizemonofazate i trasee de cureni slabi ELINGR10E 82,4 1,0296 84,8Instalaii de nclzirenclzire cu convectoradiatoare INCCONV10E 113,1 0,9799 110,8nclzire cu traseu din eavcupru i corp staticdin font, bimetal INCELFS10E 172,5 0,9136 157,6

    FINISAJ SCARBLOC P+10E+SUBSOL TEHNIC*costuri aferente scarcotparte pe apartament

    Nr.apartamente pe palier / Simbol Finisaj pret indice cost actualizatcarte 2014 - 2015 2014 - 2015

    2 apartamente pe nivel obinuit 1.781,7 1,0284 1.832,3FINSC2AP10E superior 7.706,8 0,9077 6.995,5

    3 apartamente pe nivel obinuit 1.187,8 1,0284 1.221,5FINSC3AP10E superior 5.137,9 0,9077 4.663,7

    4 apartamente pe nivel obinuit 890,9 1,0284 916,2FINSC4AP10E superior 3.853,4 0,9077 3.497,76 apartamente pe nivel obinuit 593,9 1,0284 610,8

    FINSC6AP10E superior 2.568,9 0,9077 2.331,8

    pag.17

    pag. carte: 48

    pag. carte: 47

    pag. carte: 48

  • 8/10/2019 Indici de Actualizare 2014-2015

    30/117

    ANSAMBLURI OBIECTE SANITARE OBINUITE BLOC P+10E+SUBSOL TEHNIC AUGUST 2014 - AUGUST 2015*costuri pe ansamblu sanitar

    Tipuri obiecte sanitare Simbol pret indice cost actualizatcarte 2014 - 2015 2014 - 2015

    1 CAMERChiuvetfont+ baterie amestec CHFOBO10E 1.159,7 0,9457 1.096,7Cadfont+ lavoar + WC CALAWC10E 3.642,0 1,1783 4.291,2TOTAL ANSAMBLURI 4.801,7 5.387,92 CAMEREChiuvetfont+ baterie amestec CHFOBO10E 1.159,7 0,9457 1.096,7Cadfont+ lavoar + WC CALAWC10E 3.642,0 1,1783 4.291,2TOTAL ANSAMBLURI 4.801,7 5.387,93 CAMERE V1

    Chiuvetfont+ baterie amestec CHFOBO10E 1.159,7 0,9457 1.096,7Cadfont+ lavoar + WC CALAWC10E 3.642,0 1,1783 4.291,2TOTAL ANSAMBLURI 4.801,7 5.387,93 CAMERE V2Chiuvetfont+ baterie amestec CHFOBO10E 1.159,7 0,9457 1.096,7Cadfont+ lavoar + WC CALAWC10E 3.642,0 1,1783 4.291,2Lavoar + WC LAVWC10E 1.424,6 1,0121 1.441,8TOTAL ANSAMBLURI 6.226,3 6.829,74 CAMERE V1

    Chiuvetfont+ baterie amestec CHFOBO10E 1.159,7 0,9457 1.096,7Cadfont+ lavoar + WC CALAWC10E 3.642,0 1,1783 4.291,4Lavoar + WC LAVWC10E 1.424,6 1,0121 1.441,8TOTAL ANSAMBLURI 6.226,3 6.829,94 CAMERE V2Chiuvetfont+ baterie amestec CHFOBO10E 1.159,7 0,9457 1.096,7Cadfont+ lavoar + WC CALAWC10E 3.642,0 1,1783 4.291,4Cuvdu+ lavoar + WC DUSLAWC10E 2.561,8 0,9802 2.511,1TOTAL ANSAMBLURI 7.363,5 7.899,2

    pag.18

    pag. carte: 49

  • 8/10/2019 Indici de Actualizare 2014-2015

    31/117

    ANSAMBLURI OBIECTE SANITARE CALITATE SUPERIOARBLOC P+10E+SUBSOL TEHNIC AUGUST 2014 - AUGUST 2015*costuri pe ansamblu sanitar

    Tipuri obiecte sanitare Simbol pret indice cost actualizatcarte 2014 - 2015 2014 - 2015

    1 CAMERChiuvetinox + baterie amestec CHINOX10E 1.705,5 0,8910 1.519,5Cadjacuzzi + lavoar + WC CAJALAWC10E 11.366,3 1,1382 12.937,3TOTAL ANSAMBLURI 13.071,8 14.456,82 CAMEREChiuvetinox + baterie amestec CHINOX10E 1.705,5 0,8910 1.519,6Cadjacuzzi + lavoar + WC CAJALAWC10E 11.366,3 1,1382 12.937,1TOTAL ANSAMBLURI 13.071,8 14.456,73 CAMERE V1

    Chiuvetinox + baterie amestec CHINOX10E 1.705,5 0,8910 1.519,6Cadjacuzzi + lavoar + WC CAJALAWC10E 11.366,3 1,1382 12.937,1TOTAL ANSAMBLURI 13.071,8 14.456,73 CAMERE V2Chiuvetinox + baterie amestec CHINOX10E 1.705,5 0,8910 1.519,6Cadjacuzzi + lavoar + WC CAJALAWC10E 11.366,3 1,1382 12.937,1Lavoar + WC LAVWCSU10E 5.460,3 0,8809 4.810,2TOTAL ANSAMBLURI 18.532,1 19.267,04 CAMERE V1

    Chiuvetinox + baterie amestec CHINOX10E 1.705,5 0,8910 1.519,6Cadjacuzzi + lavoar + WC CAJALAWC10E 11.366,3 1,1382 12.937,1Lavoar + WC LAVWCSU10E 5.460,3 0,8809 4.810,0TOTAL ANSAMBLURI 18.532,1 19.266,74 CAMERE V2Chiuvetinox + baterie amestec CHINOX10E 1.705,5 0,8910 1.519,6Cadjacuzzi + lavoar + WC CAJALAWC10E 11.366,3 1,1382 12.937,1Du+ cabin+ lavoar + WC DUSLAWCS10E 6.544,0 0,9714 6.356,9TOTAL ANSAMBLURI 19.615,8 20.813,6

    pag.19

    pag. carte: 50

  • 8/10/2019 Indici de Actualizare 2014-2015

    32/117

    CLDIRE MONUMENTALCU FAADA DE INFLUENNEOCLASIC(INFLUENFRANCEZ) AUGUST 2014 - AUGUST 2015Denumire pret indice cost actualizat

    carte 2014 - 2015 2014 - 2015Infrastructurcu planeu de bolioare 3.197,8 0,8641 2.763,2

    Suprastructurzidrie portantcu planeu de bolioare 2.049,9 0,9840 2.017,1nvelitoare iglsolzi din tablarmit 604,1 1,0914 659,3Faadcu metope, ancadramente i basoreliefuri 722,6 0,9042 653,4Finisaj interior cu stucaturi, ancadramente i profile 3.672,5 0,8705 3.196,9Instalaie electric 126,7 0,8530 108,1Instalaie nclzire 84,5 1,0574 89,4Instalaie sanitar 44,9 0,9493 42,6TOTAL COSTURI PE MP 10.503,0 9.530,0

    pag.20

    pag. carte: 51

  • 8/10/2019 Indici de Actualizare 2014-2015

    33/117

    CLDIRE DIN LEMN (SISTEM AMERICAN) FUNDAIE, STRUCTUR, NVELITOARE, FINISAJ, AUGUST 2014 - AUGUST 2015INSTALAII ELECTRICE I INSTALAII DE NCLZIREDenumire pret indice cost actualizat

    carte 2014 - 2015 2014 - 2015

    Fundaii de beton simplu i cuzinei armai FCV1 395,2 1,0478 414,1Suprastructura CASALEMN 503,6 0,9239 465,3nvelitoare tablLindab INVTLCL 340,4 1,0188 346,8Finisaj obinuit frscarFOBFSCL 658,5 1,0284 677,2Finisaj superior frscarFSUPFSCL 1.253,6 0,9077 1.137,9Instalaii electrice ELINGRCL 82,4 1,0296 84,8nclzire cu convectoradiatoare INCCONVCL 113,1 0,9799 110,8

    INSTALAII SANITARETip instalatie sanitara pret indice cost actualizat

    carte 2014 - 2015 2014 - 2015Chiuveta inox + baterie amestec(sanitare cal.superioar) CHINOXCL 1.705,5 0,8910 1.519,6Lavoar + WC(sanitare obinuite) LAVWCCL 1.424,6 1,0121 1.441,8Lavoar + WC(sanitare cal.superioar) LAVWCSUCL 5.460,3 0,8809 4.810,0Cadfont+ lavoar + WC(sanitare obinuite) CALAWCCL 3.642,0 1,1382 4.145,3

    FINISAJ SCARTip scar pret indice cost actualizat

    carte 2014 - 2015 2014 - 2015Scarobinuitcu trepte gresie i parapet din lemnSCAGRESCL 3.662,2 0,9695 3.550,5Scarsuperioarcu trepte stejar i balustraddin inoxSCASTEJACL 10.887,6 1,1684 12.721,1

    pag.21

    pag. carte: 53

  • 8/10/2019 Indici de Actualizare 2014-2015

    34/117

    CLDIRE DIN PAIANT AUGUST 2014 - AUGUST 2015Denumire pret indice cost actualizat

    carte 2014 - 2015 2014 - 2015Fundaii i structura 705,4 1,0194 719,1

    Finisaj 486,1 0,9684 470,7Instalaia electrici 3 sobe 65,0 0,9683 62,9

    pag.22

    pag. carte: 55

  • 8/10/2019 Indici de Actualizare 2014-2015

    35/117

    CLDIRI INDUSTRIALE

  • 8/10/2019 Indici de Actualizare 2014-2015

    36/117

    TABEL CENTRALIZATOR COSTURI STRUCTURHALINDUSTRIALA AUGUST 2014 - AUGUST 2015CU STLPI PREFABRICAI DE 6 M NLIME, CU 1, 2 SAU 3 DESCHIDERI DE 6 M

    Gradul Numar de Simbol pret indice cost actualizatseismic deschideri carte 2014 - 2015 2014 - 2015

    1 6STR1D6H6 766,2 1,0068 771,4Grad 6 2 6STR2D6H6 627,0 1,0136 635,53 6STR3D6H6 580,3 1,0009 580,81 7STR1D6H6 797,8 1,0068 803,2 pag. carte: 14

    Grad 7 2 7STR2D6H6 652,9 1,0136 661,83 7STR3D6H6 604,2 1,0009 604,71 8STR1D6H6 833,3 1,0068 839,0

    Grad 8 2 8STR2D6H6 682,0 1,0136 691,33 8STR3D6H6 631,2 1,0009 631,8

    1 9STR1D6H6 905,3 1,0068 911,5Grad 9 2 9STR2D6H6 740,8 1,0136 750,9

    3 9STR3D6H6 685,7 1,0009 686,3TABEL CENTRALIZATOR COSTURI STRUCTURHALINDUSTRIALACU ST LPI PREFABRICAI DE 8 M N LIME, CU 1, 2 SAU 3 DESCHIDERI DE 6 M

    Gradul Numar de Simbol pret indice cost actualizatseismic deschideri carte 2014 - 2015 2014 - 2015

    1 6STR1D6H8 1.121,1 1,0033 1.124,8Grad 6 2 6STR2D6H8 984,0 0,9658 950,3

    3 6STR3D6H8 962,1 0,9339 898,51 7STR1D6H8 1.167,3 1,0033 1.171,2 pag. carte: 16

    Grad 7 2 7STR2D6H8 1.024,5 0,9658 989,53 7STR3D6H8 1.001,7 0,9339 935,51 8STR1D6H8 1.219,3 1,0033 1.223,3

    Grad 8 2 8STR2D6H8 1.070,2 0,9658 1.033,63 8STR3D6H8 1.046,4 0,9339 977,21 9STR1D6H8 1.324,6 1,0033 1.329,0

    Grad 9 2 9STR2D6H8 1.162,6 0,9658 1.122,83 9STR3D6H8 1.136,7 0,9339 1.061,6

    pag.23

  • 8/10/2019 Indici de Actualizare 2014-2015

    37/117

    TABEL CENTRALIZATOR COSTURI STRUCTURHALINDUSTRIALA AUGUST 2014 - AUGUST 2015CU STLPI PREFABRICAI DE 10 M NLIME, CU 1, 2 SAU 3 DESCHIDERI DE 6 M

    Gradul Numar de Simbol pret indice cost actualizatseismic deschideri carte 2014 - 2015 2014 - 2015

    1 6STR1D6H10 1.820,7 0,9592 1.746,4Grad 6 2 6STR2D6H10 1.452,7 0,9678 1.405,9

    3 6STR3D6H10 1.372,4 0,9441 1.295,71 7STR1D6H10 1.895,7 0,9592 1.818,4 pag. carte: 18

    Grad 7 2 7STR2D6H10 1.512,6 0,9678 1.463,93 7STR3D6H10 1.429,0 0,9441 1.349,11 8STR1D6H10 1.980,2 0,9592 1.899,4

    Grad 8 2 8STR2D6H10 1.580,0 0,9678 1.529,13 8STR3D6H10 1.492,7 0,9441 1.409,3

    1 9STR1D6H10 2.151,1 0,9592 2.063,3Grad 9 2 9STR2D6H10 1.716,4 0,9678 1.661,1

    3 9STR3D6H10 1.621,5 0,9441 1.530,9TABEL CENTRALIZATOR COSTURI STRUCTURHALINDUSTRIALACU ST LPI PREFABRICAI DE 6 M N LIME, CU 1, 2 SAU 3 DESCHIDERI DE 9 M

    Gradul Numar de Simbol pret indice cost actualizatseismic deschideri carte 2014 - 2015 2014 - 2015

    1 6STR1D9H6 725,1 0,9475 687,0Grad 6 2 6STR2D9H6 598,5 0,9745 583,2

    3 6STR3D9H6 556,1 0,9868 548,81 7STR1D9H6 755,0 0,9475 715,4 pag. carte: 20

    Grad 7 2 7STR2D9H6 623,2 0,9745 607,33 7STR3D9H6 579,0 0,9868 571,41 8STR1D9H6 788,6 0,9475 747,2

    Grad 8 2 8STR2D9H6 650,9 0,9745 634,33 8STR3D9H6 604,8 0,9868 596,81 9STR1D9H6 856,7 0,9475 811,7

    Grad 9 2 9STR2D9H6 707,1 0,9745 689,13 9STR3D9H6 657,0 0,9868 648,3

    pag.24

  • 8/10/2019 Indici de Actualizare 2014-2015

    38/117

    TABEL CENTRALIZATOR COSTURI STRUCTURHALINDUSTRIALA AUGUST 2014 - AUGUST 2015CU STLPI PREFABRICAI DE 8 M NLIME, CU 1, 2 SAU 3 DESCHIDERI DE 9 M

    Gradul Numar de Simbol pret indice cost actualizatseismic deschideri carte 2014 - 2015 2014 - 2015

    1 6STR1D9H8 1.097,6 0,9475 1.040,0Grad 6 2 6STR2D9H8 949,0 0,9745 924,8

    3 6STR3D9H8 912,2 0,9868 900,21 7STR1D9H8 1.142,8 0,9475 1.082,8 pag. carte: 22

    Grad 7 2 7STR2D9H8 988,1 0,9745 962,93 7STR3D9H8 949,8 0,9868 937,31 8STR1D9H8 1.193,7 0,9475 1.131,0

    Grad 8 2 8STR2D9H8 1.032,1 0,9745 1.005,83 8STR3D9H8 992,2 0,9868 979,1

    1 9STR1D9H8 1.296,8 0,9475 1.228,7Grad 9 2 9STR2D9H8 1.121,3 0,9745 1.092,7

    3 9STR3D9H8 1.077,8 0,9868 1.063,6TABEL CENTRALIZATOR COSTURI STRUCTURHALINDUSTRIALACU ST LPI PREFABRICAI DE 10 M N LIME, CU 1, 2 SAU 3 DESCHIDERI DE 9 M

    Gradul Numar de Simbol pret indice cost actualizatseismic deschideri carte 2014 - 2015 2014 - 2015

    1 6STR1D9H10 1.676,1 0,9475 1.588,1Grad 6 2 6STR2D9H10 1.334,5 0,9745 1.300,5

    3 6STR3D9H10 1.256,6 0,9868 1.240,01 7STR1D9H10 1.745,1 0,9475 1.653,5 pag. carte: 24

    Grad 7 2 7STR2D9H10 1.389,5 0,9745 1.354,13 7STR3D9H10 1.308,4 0,9868 1.291,11 8STR1D9H10 1.822,9 0,9475 1.727,2

    Grad 8 2 8STR2D9H10 1.451,4 0,9745 1.414,43 8STR3D9H10 1.366,7 0,9868 1.348,71 9STR1D9H10 1.980,3 0,9475 1.876,3

    Grad 9 2 9STR2D9H10 1.576,7 0,9745 1.536,53 9STR3D9H10 1.484,7 0,9868 1.465,1

    pag.25

  • 8/10/2019 Indici de Actualizare 2014-2015

    39/117

    TABEL CENTRALIZATOR COSTURI STRUCTURHALINDUSTRIALA AUGUST 2014 - AUGUST 2015CU STLPI PREFABRICAI DE 6 M NLIME, CU 1, 2 SAU 3 DESCHIDERI DE 12 M

    Gradul Numar de Simbol pret indice cost actualizatseismic deschideri carte 2014 - 2015 2014 - 2015

    1 6STR1D12H6 684,0 1,0342 707,4Grad 6 2 6STR2D12H6 570,0 1,0452 595,8

    3 6STR3D12H6 531,9 1,0086 536,51 7STR1D12H6 712,2 1,0342 736,6 pag. carte: 26

    Grad 7 2 7STR2D12H6 593,4 1,0452 620,23 7STR3D12H6 553,8 1,0086 558,61 8STR1D12H6 743,9 1,0342 769,3

    Grad 8 2 8STR2D12H6 619,9 1,0452 647,93 8STR3D12H6 578,5 1,0086 583,5

    1 9STR1D12H6 808,2 1,0342 835,8Grad 9 2 9STR2D12H6 673,4 1,0452 703,8

    3 9STR3D12H6 628,4 1,0086 633,8TABEL CENTRALIZATOR COSTURI STRUCTURHALINDUSTRIALACU ST LPI PREFABRICAI DE 8 M N LIME, CU 1, 2 SAU 3 DESCHIDERI DE 12 M

    Gradul Numar de Simbol pret indice cost actualizatseismic deschideri carte 2014 - 2015 2014 - 2015

    1 6STR1D12H8 1.074,0 1,0171 1.092,4Grad 6 2 6STR2D12H8 914,0 0,9826 898,1

    3 6STR3D12H8 862,4 0,9786 843,91 7STR1D12H8 1.118,3 1,0171 1.137,4 pag. carte: 28

    Grad 7 2 7STR2D12H8 951,7 0,9826 935,13 7STR3D12H8 897,9 0,9786 878,71 8STR1D12H8 1.168,1 1,0171 1.188,1

    Grad 8 2 8STR2D12H8 994,1 0,9826 976,83 8STR3D12H8 937,9 0,9786 917,81 9STR1D12H8 1.269,0 1,0171 1.290,7

    Grad 9 2 9STR2D12H8 1.079,9 0,9826 1.061,13 9STR3D12H8 1.018,9 0,9786 997,1

    pag.26

    TABEL CENTRALIZATOR COSTURI STRUCTUR HAL INDUSTRIALA AUGUST 2014 AUGUST 2015

  • 8/10/2019 Indici de Actualizare 2014-2015

    40/117

    TABEL CENTRALIZATOR COSTURI STRUCTURHALINDUSTRIALA AUGUST 2014 - AUGUST 2015CU STLPI PREFABRICAI DE 10 M NLIME, CU 1, 2 SAU 3 DESCHIDERI DE 12 M

    Gradul Numar de Simbol pret indice cost actualizatseismic deschideri carte 2014 - 2015 2014 - 2015

    1 6STR1D12H10 1.531,9 0,9903 1.517,0Grad 6 2 6STR2D12H10 1.216,1 1,0451 1.270,9

    3 6STR3D12H10 1.140,8 0,9835 1.122,01 7STR1D12H10 1.595,0 0,9903 1.579,5 pag. carte: 30

    Grad 7 2 7STR2D12H10 1.266,2 1,0451 1.323,33 7STR3D12H10 1.187,8 0,9835 1.168,21 8STR1D12H10 1.666,1 0,9903 1.649,9

    Grad 8 2 8STR2D12H10 1.322,6 1,0451 1.382,23 8STR3D12H10 1.240,8 0,9835 1.220,3

    1 9STR1D12H10 1.810,0 0,9903 1.792,4Grad 9 2 9STR2D12H10 1.436,8 1,0451 1.501,6

    3 9STR3D12H10 1.347,9 0,9835 1.325,7TABEL CENTRALIZATOR COSTURI STRUCTURHALINDUSTRIALACU ST LPI PREFABRICAI DE 6 M N LIME, CU 1, 2 SAU 3 DESCHIDERI DE 15 M

    Gradul Numar de Simbol pret indice cost actualizatseismic deschideri carte 2014 - 2015 2014 - 2015

    1 6STR1D15H6 642,9 0,9576 615,6Grad 6 2 6STR2D15H6 541,4 0,9393 508,5

    3 6STR3D15H6 507,6 0,9516 483,01 7STR1D15H6 669,4 0,9576 641,0 pag. carte: 32

    Grad 7 2 7STR2D15H6 563,7 0,9393 529,53 7STR3D15H6 528,5 0,9516 502,91 8STR1D15H6 699,3 0,9576 669,6

    Grad 8 2 8STR2D15H6 588,9 0,9393 553,23 8STR3D15H6 552,1 0,9516 525,41 9STR1D15H6 759,6 0,9576 727,4

    Grad 9 2 9STR2D15H6 639,7 0,9393 600,93 9STR3D15H6 599,8 0,9516 570,8

    pag.27

    TABEL CENTRALIZATOR COSTURI STRUCTUR HAL INDUSTRIALA AUGUST 2014 AUGUST 2015

  • 8/10/2019 Indici de Actualizare 2014-2015

    41/117

    TABEL CENTRALIZATOR COSTURI STRUCTURHALINDUSTRIALA AUGUST 2014 - AUGUST 2015CU STLPI PREFABRICAI DE 8 M NLIME, CU 1, 2 SAU 3 DESCHIDERI DE 15 M

    Gradul Numar de Simbol pret indice cost actualizatseismic deschideri carte 2014 - 2015 2014 - 2015

    1 6STR1D15H8 1.050,5 0,9074 953,2Grad 6 2 6STR2D15H8 879,1 0,9184 807,4

    3 6STR3D15H8 812,6 0,9300 755,71 7STR1D15H8 1.093,8 0,9074 992,5 pag. carte: 34

    Grad 7 2 7STR2D15H8 915,3 0,9184 840,63 7STR3D15H8 846,0 0,9300 786,81 8STR1D15H8 1.142,5 0,9074 1.036,7

    Grad 8 2 8STR2D15H8 956,1 0,9184 878,13 8STR3D15H8 883,7 0,9300 821,8

    1 9STR1D15H8 1.241,2 0,9074 1.126,3Grad 9 2 9STR2D15H8 1.038,6 0,9184 953,9

    3 9STR3D15H8 960,0 0,9300 892,8TABEL CENTRALIZATOR COSTURI STRUCTURHALINDUSTRIALACU ST LPI PREFABRICAI DE 10 M N LIME, CU 1, 2 SAU 3 DESCHIDERI DE 15 M

    Gradul Numar de Simbol pret indice cost actualizatseismic deschideri carte 2014 - 2015 2014 - 2015

    1 6STR1D15H10 1.386,9 0,8678 1.203,6Grad 6 2 6STR2D15H10 1.098,0 0,9242 1.014,8

    3 6STR3D15H10 1.025,0 0,9293 952,51 7STR1D15H10 1.444,0 0,8678 1.253,1 pag. carte: 36

    Grad 7 2 7STR2D15H10 1.143,2 0,9242 1.056,53 7STR3D15H10 1.067,3 0,9293 991,81 8STR1D15H10 1.508,4 0,8678 1.309,0

    Grad 8 2 8STR2D15H10 1.194,1 0,9242 1.103,63 8STR3D15H10 1.114,8 0,9293 1.036,01 9STR1D15H10 1.638,6 0,8678 1.422,0

    Grad 9 2 9STR2D15H10 1.297,2 0,9242 1.198,93 9STR3D15H10 1.211,1 0,9293 1.125,5

    pag.28

    TABEL CENTRALIZATOR COSTURI STRUCTUR HAL INDUSTRIALA AUGUST 2014 - AUGUST 2015

  • 8/10/2019 Indici de Actualizare 2014-2015

    42/117

    TABEL CENTRALIZATOR COSTURI STRUCTURHALINDUSTRIALA AUGUST 2014 - AUGUST 2015CU STLPI PREFABRICAI DE 6 M NLIME, CU 1, 2 SAU 3 DESCHIDERI DE 18 M

    Gradul Numar de Simbol pret indice cost actualizatseismic deschideri carte 2014 - 2015 2014 - 2015

    1 6STR1D18H6 601,9 0,9967 599,9Grad 6 2 6STR2D18H6 512,9 1,0345 530,6

    3 6STR3D18H6 483,4 1,0488 507,01 7STR1D18H6 626,7 0,9967 624,6 pag. carte: 38

    Grad 7 2 7STR2D18H6 534,0 1,0345 552,43 7STR3D18H6 503,3 1,0488 527,91 8STR1D18H6 654,6 0,9967 652,4

    Grad 8 2 8STR2D18H6 557,8 1,0345 577,03 8STR3D18H6 525,7 1,0488 551,4

    1 9STR1D18H6 711,1 0,9967 708,8Grad 9 2 9STR2D18H6 606,0 1,0345 626,93 9STR3D18H6 571,1 1,0488 599,0

    TABEL CENTRALIZATOR COSTURI STRUCTURHALINDUSTRIALACU ST LPI PREFABRICAI DE 8 M N LIME, CU 1, 2 SAU 3 DESCHIDERI DE 18 M

    Gradul Numar de Simbol pret indice cost actualizatseismic deschideri carte 2014 - 2015 2014 - 2015

    1 6STR1D18H8 1.027,0 1,0139 1.041,3Grad 6 2 6STR2D18H8 844,1 1,0208 861,7

    3 6STR3D18H8 762,7 1,0513 801,81 7STR1D18H8 1.069,3 1,0139 1.084,2 pag. carte: 40

    Grad 7 2 7STR2D18H8 878,9 1,0208 897,23 7STR3D18H8 794,1 1,0513 834,81 8STR1D18H8 1.117,0 1,0139 1.132,5

    Grad 8 2 8STR2D18H8 918,1 1,0208 937,23 8STR3D18H8 829,5 1,0513 872,11 9STR1D18H8 1.213,4 1,0139 1.230,3

    Grad 9 2 9STR2D18H8 997,3 1,0208 1.018,03 9STR3D18H8 901,2 1,0513 947,4

    pag.29

    TABEL CENTRALIZATOR COSTURI STRUCTUR HAL INDUSTRIALA AUGUST 2014 - AUGUST 2015

  • 8/10/2019 Indici de Actualizare 2014-2015

    43/117

    TABEL CENTRALIZATOR COSTURI STRUCTURHALINDUSTRIALA AUGUST 2014 AUGUST 2015CU STLPI PREFABRICAI DE 10 M NLIME, CU 1, 2 SAU 3 DESCHIDERI DE 18 M

    Gradul Numar de Simbol pret indice cost actualizatseismic deschideri carte 2014 - 2015 2014 - 2015

    1 6STR1D18H10 1.242,6 1,0088 1.253,5Grad 6 2 6STR2D18H10 979,6 1,0466 1.025,2

    3 6STR3D18H10 909,2 1,0424 947,81 7STR1D18H10 1.293,8 1,0088 1.305,2 pag. carte: 42

    Grad 7 2 7STR2D18H10 1.020,0 1,0466 1.067,53 7STR3D18H10 946,7 1,0424 986,81 8STR1D18H10 1.351,5 1,0088 1.363,4

    Grad 8 2 8STR2D18H10 1.065,5 1,0466 1.115,23 8STR3D18H10 988,9 1,0424 1.030,8

    1 9STR1D18H10 1.468,2 1,0088 1.481,1Grad 9 2 9STR2D18H10 1.157,5 1,0466 1.211,43 9STR3D18H10 1.074,3 1,0424 1.119,9

    TABEL CENTRALIZATOR COSTURI STRUCTURHALINDUSTRIALACU ST LPI PREFABRICAI DE 6 M N LIME, CU 1, 2 SAU 3 DESCHIDERI DE 21 M

    Gradul Numar de Simbol pret indice cost actualizatseismic deschideri carte 2014 - 2015 2014 - 2015

    1 6STR1D21H6 560,8 0,9944 557,7Grad 6 2 6STR2D21H6 484,4 1,0063 487,5

    3 6STR3D21H6 459,1 1,0151 466,01 7STR1D21H6 583,9 0,9944 580,6 pag. carte: 44

    Grad 7 2 7STR2D21H6 504,3 1,0063 507,53 7STR3D21H6 478,1 1,0151 485,31 8STR1D21H6 609,9 0,9944 606,5

    Grad 8 2 8STR2D21H6 526,8 1,0063 530,13 8STR3D21H6 499,4 1,0151 506,91 9STR1D21H6 662,5 0,9944 658,8

    Grad 9 2 9STR2D21H6 572,3 1,0063 575,93 9STR3D21H6 542,5 1,0151 550,7

    pag.30

    TABEL CENTRALIZATOR COSTURI STRUCTURHALINDUSTRIALA AUGUST 2014 - AUGUST 2015

  • 8/10/2019 Indici de Actualizare 2014-2015

    44/117

    C O COS U S UC U US UGUS 0 UGUS 0 5CU STLPI PREFABRICAI DE 8 M NLIME, CU 1, 2 SAU 3 DESCHIDERI DE 21 M

    Gradul Numar de Simbol pret indice cost actualizatseismic deschideri carte 2014 - 2015 2014 - 2015

    1 6STR1D21H8 1.003,5 1,0109 1.014,4Grad 6 2 6STR2D21H8 809,2 1,0128 819,6

    3 6STR3D21H8 712,9 1,0273 732,41 7STR1D21H8 1.044,8 1,0109 1.056,2 pag. carte: 46

    Grad 7 2 7STR2D21H8 842,5 1,0128 853,33 7STR3D21H8 742,3 1,0273 762,61 8STR1D21H8 1.091,4 1,0109 1.103,3

    Grad 8 2 8STR2D21H8 880,1 1,0128 891,43 8STR3D21H8 775,3 1,0273 796,5

    1 9STR1D21H8 1.185,6 1,0109 1.198,5Grad 9 2 9STR2D21H8 956,0 1,0128 968,23 9STR3D21H8 842,3 1,0273 865,3

    TABEL CENTRALIZATOR COSTURI STRUCTURHALINDUSTRIALACU ST LPI PREFABRICAI DE 10 M N LIME, CU 1, 2 SAU 3 DESCHIDERI DE 21 M

    Gradul Numar de Simbol pret indice cost actualizatseismic deschideri carte 2014 - 2015 2014 - 2015

    1 6STR1D21H10 1.214,2 0,9874 1.198,9Grad 6 2 6STR2D21H10 979,1 1,0111 990,0

    3 6STR3D21H10 862,6 1,0207 880,51 7STR1D21H10 1.264,2 0,9874 1.248,3 pag. carte: 48

    Grad 7 2 7STR2D21H10 1.019,4 1,0111 1.030,73 7STR3D21H10 898,1 1,0207 916,71 8STR1D21H10 1.320,5 0,9874 1.303,9

    Grad 8 2 8STR2D21H10 1.064,8 1,0111 1.076,63 8STR3D21H10 938,1 1,0207 957,51 9STR1D21H10 1.434,5 0,9874 1.416,4

    Grad 9 2 9STR2D21H10 1.156,8 1,0111 1.169,63 9STR3D21H10 1.019,1 1,0207 1.040,2

    pag.31

    TABEL CENTRALIZATOR COSTURI STRUCTURHALINDUSTRIALA AUGUST 2014 - AUGUST 2015

  • 8/10/2019 Indici de Actualizare 2014-2015

    45/117

    CU STLPI PREFABRICAI DE 6 M NLIME, CU 1, 2 SAU 3 DESCHIDERI DE 24 MGradul Numar de Simbol pret indice cost actualizatseismic deschideri carte 2014 - 2015 2014 - 2015

    1 6STR1D24H6 519,7 0,9869 512,9Grad 6 2 6STR2D24H6 455,8 1,0132 461,8

    3 6STR3D24H6 434,9 1,0229 444,91 7STR1D24H6 541,1 0,9869 534,0 pag. carte: 50

    Grad 7 2 7STR2D24H6 474,6 1,0132 480,93 7STR3D24H6 452,8 1,0229 463,21 8STR1D24H6 565,2 0,9869 557,8

    Grad 8 2 8STR2D24H6 495,8 1,0132 502,33 8STR3D24H6 473,0 1,0229 483,8

    1 9STR1D24H6 614,0 0,9869 606,0Grad 9 2 9STR2D24H6 538,6 1,0132 545,73 9STR3D24H6 513,8 1,0229 525,6

    TABEL CENTRALIZATOR COSTURI STRUCTURHALINDUSTRIALACU ST LPI PREFABRICAI DE 8 M N LIME, CU 1, 2 SAU 3 DESCHIDERI DE 24 M

    Gradul Numar de Simbol pret indice cost actualizatseismic deschideri carte 2014 - 2015 2014 - 2015

    1 6STR1D24H8 980,0 0,9922 972,4Grad 6 2 6STR2D24H8 774,2 1,0081 780,5

    3 6STR3D24H8 663,0 1,0422 691,01 7STR1D24H8 1.020,3 0,9922 1.012,3 pag. carte: 52

    Grad 7 2 7STR2D24H8 806,1 1,0081 812,63 7STR3D24H8 690,4 1,0422 719,51 8STR1D24H8 1.065,8 0,9922 1.057,5

    Grad 8 2 8STR2D24H8 842,0 1,0081 848,83 8STR3D24H8 721,1 1,0422 751,51 9STR1D24H8 1.157,8 0,9922 1.148,8

    Grad 9 2 9STR2D24H8 914,7 1,0081 922,13 9STR3D24H8 783,4 1,0422 816,5

    pag.32

    TABEL CENTRALIZATOR COSTURI STRUCTURHALINDUSTRIALA AUGUST 2014 - AUGUST 2015

  • 8/10/2019 Indici de Actualizare 2014-2015

    46/117

    CU STLPI PREFABRICAI DE 10 M NLIME, CU 1, 2 SAU 3 DESCHIDERI DE 24 MGradul Numar de Simbol pret indice cost actualizatseismic deschideri carte 2014 - 2015 2014 - 2015

    1 6STR1D24H10 1.153,3 1,0055 1.159,6Grad 6 2 6STR2D24H10 899,2 1,0174 914,8

    3 6STR3D24H10 819,9 1,0173 834,11 7STR1D24H10 1.200,8 1,0055 1.207,4 pag. carte: 54

    Grad 7 2 7STR2D24H10 936,3 1,0174 952,63 7STR3D24H10 853,6 1,0173 868,41 8STR1D24H10 1.254,3 1,0055 1.261,2

    Grad 8 2 8STR2D24H10 978,0 1,0174 995,03 8STR3D24H10 891,7 1,0173 907,1

    1 9STR1D24H10 1.362,6 1,0055 1.370,1Grad 9 2 9STR2D24H10 1.062,4 1,0174 1.080,93 9STR3D24H10 968,7 1,0173 985,5

    TABEL CENTRALIZATOR COSTURI STRUCTURA HALINDUSTRIALCU ST LPIPREFABRICAI DE 6 I 8 M N LIME AV ND DESCHIDERILE DE 9 M I 12 M

    Caracteristici Gradul Simbol pret indice cost actualizatstructura seismic carte 2014 - 2015 2014 - 2015

    Numrul i

    dimensiunea Grad 6 6S2D912H68 1.014,7 1,0168 1.031,7

    deschiderilor:1x9m + 1x12m Grad 7 7S2D912H68 1.056,5 1,0168 1.074,2 pag. carte: 56Numrul i

    nlimea Grad 8 8S2D912H68 1.103,6 1,0168 1.122,1stlpilor:1x6m+2x8m Grad 9 9S2D912H68 1.198,8 1,0168 1.218,9Numrul i

    dimensiunea Grad 6 6S3D912H68 903,2 1,0259 926,6deschiderilor:

    2x9m + 1x12m Grad 7 7S3D912H68 940,4 1,0259 964,8Numrul i

    nlimea Grad 8 8S3D912H68 982,3 1,0259 1.007,7stlpilor:2x6m+2x8m Grad 9 9S3D912H68 1.067,1 1,0259 1.094,7

    pag.33

    TABEL CENTRALIZATOR COSTURI STRUCTURA HALINDUSTRIALCU STLPI AUGUST 2014 - AUGUST 2015C SC

  • 8/10/2019 Indici de Actualizare 2014-2015

    47/117

    PREFABRICAI DE 6 I 10 M NLIME AV ND DESCHIDERILE DE 9 M I 12 MCaracteristici Gradul Simbol pret indice cost actualizat

    structura seismic carte 2014 - 2015 2014 - 2015Numrul i

    dimensiunea Grad 6 6S2D912H610 1.199,6 0,9976 1.196,7deschiderilor:

    1x9m + 1x12m Grad 7 7S2D912H610 1.249,0 0,9976 1.246,0 pag. carte: 57Numrul i

    nlimea Grad 8 8S2D912H610 1.304,7 0,9976 1.301,6stlpilor:1x6m+2x10m Grad 9 9S2D912H610 1.417,4 0,9976 1.414,0Numrul i

    dimensiunea Grad 6 6S3D912H610 1.046,1 1,0013 1.047,5deschiderilor:

    2x9m + 1x12m Grad 7 7S3D912H610 1.089,2 1,0013 1.090,6Numrul i

    nlimea Grad 8 8S3D912H610 1.137,7 1,0013 1.139,2stlpilor:2x6m+2x10m Grad 9 9S3D912H610 1.235,9 1,0013 1.237,5TABEL CENTRALIZATOR COSTURI STRUCTURA HALINDUSTRIALCU STLPIPREFABRICAI DE 6 I 8 M NLIE AV ND DESCHIDERILE DE 9 M I 15 M

    Caracteristici Gradul Simbol pret indice cost actualizatstructura seismic carte 2014 - 2015 2014 - 2015Numrul i

    dimensiunea Grad 6 6S2D915H68 979,8 0,9792 959,4deschiderilor:

    1x9m + 1x15m Grad 7 7S2D915H68 1.020,1 0,9792 998,9 pag. carte: 58Numrul i

    nlimea Grad 8 8S2D915H68 1.065,6 0,9792 1.043,4stlpilor:

    1x6m+2x8m Grad 9 9S2D915H68 1.157,6 0,9792 1.133,5Numrul i

    dimensiunea Grad 6 6S3D915H68 885,3 1,0212 904,1deschiderilor:

    2x9m + 1x15m Grad 7 7S3D915H68 921,8 1,0212 941,3Numrul i

    nlimea Grad 8 8S3D915H68 962,9 1,0212 983,3stlpilor:

    2x6m+2x8m Grad 9 9S3D915H68 1.046,0 1,0212 1.068,2 pag.34

    TABEL CENTRALIZATOR COSTURI STRUCTURA HALINDUSTRIALCU STLPI AUGUST 2014 - AUGUST 2015PREFABRICAI DE 6 I 10 M NLIME AV ND DESCHIDERILE DE 9 M I 15 M

  • 8/10/2019 Indici de Actualizare 2014-2015

    48/117

    PREFABRICAI DE 6 I 10 M NLIME AV ND DESCHIDERILE DE 9 M I 15 MCaracteristici Gradul Simbol pret indice cost actualizat

    structura seismic carte 2014 - 2015 2014 - 2015Numrul i

    dimensiunea Grad 6 6S2D915H610 1.141,8 1,0201 1.164,8deschiderilor:

    1x9m + 1x15m Grad 7 7S2D915H610 1.188,9 1,0201 1.212,8 pag. carte: 59Numrul i

    nlimea Grad 8 8S2D915H610 1.241,8 1,0201 1.266,8stlpilor:1x6m+2x10m Grad 9 9S2D915H610 1.349,1 1,0201 1.376,2Numrul i

    dimensiunea Grad 6 6S3D915H610 995,8 1,0087 1.004,5deschiderilor:

    2x9m + 1x15m Grad 7 7S3D915H610 1.036,9 1,0087 1.045,9Numrul i

    nlimea Grad 8 8S3D915H610 1.083,1 1,0087 1.092,5stlpilor:2x6m+2x10m Grad 9 9S3D915H610 1.176,6 1,0087 1.186,8TABEL CENTRALIZATOR COSTURI STRUCTURA HALINDUSTRIALCU STLPIPREFABRICAI DE 6 I 8 M NLIME AV ND DESCHIDERILE DE 9 M I 18 M

    Caracteristici Gradul Simbol pret indice cost actualizatstructura seismic carte 2014 - 2015 2014 - 2015Numrul i

    dimensiunea Grad 6 6S2D918H68 967,4 1,0100 977,1deschiderilor:

    1x9m + 1x18m Grad 7 7S2D918H68 1.007,2 1,0100 1.017,3 pag. carte: 60Numrul i

    nlimea Grad 8 8S2D918H68 1.052,1 1,0100 1.062,6stlpilor:

    1x6m+2x8m Grad 9 9S2D918H68 1.143,0 1,0100 1.154,4Numrul i

    dimensiunea Grad 6 6S3D918H68 878,7 1,0042 882,4deschiderilor:

    2x9m + 1x18m Grad 7 7S3D918H68 915,0 1,0042 918,8Numrul i

    nlimea Grad 8 8S3D918H68 955,7 1,0042 959,7stlpilor:

    2x6m+2x8m Grad 9 9S3D918H68 1.038,2 1,0042 1.042,6 pag.35

    TABEL CENTRALIZATOR COSTURI STRUCTURA HALINDUSTRIALCU STLPI AUGUST 2014 - AUGUST 2015PREFABRICAI DE 6 I 10 M NLIME AV ND DESCHIDERILE DE 9 M I 18 M

  • 8/10/2019 Indici de Actualizare 2014-2015

    49/117

    PREFABRICAI DE 6 I 10 M NLIME AV ND DESCHIDERILE DE 9 M I 18 MCaracteristici Gradul Simbol pret indice cost actualizat

    structura seismic carte 2014 - 2015 2014 - 2015Numrul i

    dimensiunea Grad 6 6S2D918H610 1.124,7 1,0112 1.137,3deschiderilor:

    1x9m + 1x18m Grad 7 7S2D918H610 1.171,1 1,0112 1.184,2 pag. carte: 61Numrul i

    nlimea Grad 8 8S2D918H610 1.223,2 1,0112 1.236,9stlpilor:1x6m+2x10m Grad 9 9S2D918H610 1.328,9 1,0112 1.343,8Numrul i

    dimensiunea Grad 6 6S3D918H610 977,1 1,0112 988,0deschiderilor:

    2x9m + 1x18m Grad 7 7S3D918H610 1.017,4 1,0112 1.028,8Numrul i

    nlimea Grad 8 8S3D918H610 1.062,7 1,0112 1.074,6stlpilor:2x6m+2x10m Grad 9 9S3D918H610 1.154,5 1,0112 1.167,4TABEL CENTRALIZATOR COSTURI STRUCTURA HALINDUSTRIALCU STLPIPREFABRICAI DE 6 I 8 M NLIME AV ND DESCHIDERILE DE 9 M I 21 M

    Caracteristici Gradul Simbol pret indice cost actualizatstructura seismic carte 2014 - 2015 2014 - 2015Numrul i

    dimensiunea Grad 6 6S2D921H68 955,0 1,0000 955,0deschiderilor:

    1x9m + 1x21m Grad 7 7S2D921H68 994,4 1,0000 994,4 pag. carte: 62Numrul i

    nlimea Grad 8 8S2D921H68 1.038,7 1,0000 1.038,7stlpilor:

    1x6m+2x8m Grad 9 9S2D921H68 1.128,4 1,0000 1.128,4Numrul i

    dimensiunea Grad 6 6S3D921H68 872,2 1,0065 877,9deschiderilor:

    2x9m + 1x21m Grad 7 7S3D921H68 908,1 1,0065 914,0Numrul i

    nlimea Grad 8 8S3D921H68 948,6 1,0065 954,8stlpilor:

    2x6m+2x8m Grad 9 9S3D921H68 1.030,5 1,0065 1.037,2 pag.36

    TABEL CENTRALIZATOR COSTURI STRUCTURA HALINDUSTRIALCU STLPI AUGUST 2014 - AUGUST 2015PREFABRICAI DE 6 I 10 M NLIME AV ND DESCHIDERILE DE 9 M I 21 M

  • 8/10/2019 Indici de Actualizare 2014-2015

    50/117

    PREFABRICAI DE 6 I 10 M NLIME AV ND DESCHIDERILE DE 9 M I 21 MCaracteristici Gradul Simbol pret indice cost actualizat

    structura seismic carte 2014 - 2015 2014 - 2015Numrul i

    dimensiunea Grad 6 6S2D921H610 1.107,6 1,0081 1.116,6deschiderilor:

    1x9m + 1x21m Grad 7 7S2D921H610 1.153,2 1,0081 1.162,5 pag. carte: 63Numrul i

    nlimea Grad 8 8S2D921H610 1.204,6 1,0081 1.214,4stlpilor:1x6m+2x10m Grad 9 9S2D921H610 1.308,6 1,0081 1.319,2Numrul i

    dimensiunea Grad 6 6S3D921H610 958,4 1,0108 968,8deschiderilor:

    2x9m + 1x21m Grad 7 7S3D921H610 997,9 1,0108 1.008,7Numrul i

    nlimea Grad 8 8S3D921H610 1.042,4 1,0108 1.053,7stlpilor:2x6m+2x10m Grad 9 9S3D921H610 1.132,4 1,0108 1.144,6TABEL CENTRALIZATOR COSTURI STRUCTURA HALINDUSTRIALCU STLPIPREFABRICAI DE 6 I 8 M NLIME AV ND DESCHIDERILE DE 9 M I 24 M

    Caracteristici Gradul Simbol pret indice cost actualizatstructura seismic carte 2014 - 2015 2014 - 2015Numrul i

    dimensiunea Grad 6 6S2D924H68 942,7 1,0135 955,4deschiderilor:

    1x9m + 1x24m Grad 7 7S2D924H68 981,5 1,0135 994,8 pag. carte: 64Numrul i

    nlimea Grad 8 8S2D924H68 1.025,2 1,0135 1.039,0stlpilor:

    1x6m+2x8m Grad 9 9S2D924H68 1.113,7 1,0135 1.128,7Numrul idimensiunea Grad 6 6S3D924H68 865,6 1,0089 873,3deschiderilor:

    2x9m + 1x24m Grad 7 7S3D924H68 901,3 1,0089 909,3Numrul i

    nlimea Grad 8 8S3D924H68 941,5 1,0089 949,9stlpilor:

    2x6m+2x8m Grad 9 9S3D924H68 1.022,7 1,0089 1.031,8 pag.37

    TABEL CENTRALIZATOR COSTURI STRUCTURA HALINDUSTRIALCU STLPI AUGUST 2014 - AUGUST 2015PREFABRICAI DE 6 I 10 M NLIME AV ND DESCHIDERILE DE 9 M I 24 M

  • 8/10/2019 Indici de Actualizare 2014-2015

    51/117

    PREFABRICAI DE 6 I 10 M NLIME AV ND DESCHIDERILE DE 9 M I 24 MCaracteristici Gradul Simbol pret indice cost actualizat

    structura seismic carte 2014 - 2015 2014 - 2015Numrul i

    dimensiunea Grad 6 6S2D924H68 1.090,5 1,0011 1.091,7deschiderilor:

    1x9m + 1x24m Grad 7 7S2D924H68 1.135,4 1,0011 1.136,6 pag. carte: 65Numrul i

    nlimea Grad 8 8S2D924H68 1.186,0 1,0011 1.187,3stlpilor:1x6m+2x10m Grad 9 9S2D924H68 1.288,4 1,0011 1.289,8Numrul i

    dimensiunea Grad 6 6S3D924H68 939,7 1,0040 943,5deschiderilor:

    2x9m + 1x24m Grad 7 7S3D924H68 978,5 1,0040 982,4Numrul i

    nlimea Grad 8 8S3D924H68 1.022,1 1,0040 1.026,2stlpilor:2x6m+2x10m Grad 9 9S3D924H68 1.110,3 1,0040 1.114,7

    pag.38

  • 8/10/2019 Indici de Actualizare 2014-2015

    52/117

    TABEL CENTRALIZATOR COSTURI CENTRALNECIRCULARCU TERMOIZOLAIE AUGUST 2014 - AUGUST 2015VATMINERAL

  • 8/10/2019 Indici de Actualizare 2014-2015

    53/117

    Denumire Simbol pret indice cost actualizatcarte 2014 - 2015 2014 - 2015

    Terasnecirculabilcu vat

    mineral TERASANE 184,9 1,2908 238,7 pag.carte: 68TABEL CENTRALIZATOR COSTURI LUMINATOR STRUCTURMETALICI GEAM ARMAT

    Denumire Simbol pret indice cost actualizatcarte 2014 - 2015 2014 - 2015

    Luminator cu geam armat TLUMINAT 508,9 1,0086 513,3TABEL CENTRALIZATOR COSTURI NCHIDERE LATERALEXTERIOARCU CRMIDDE 24 CM GROSIME, FINISATINTERIOR I EXTERIOR

    Tipul nlime Simbol pret indice cost actualizatde nchidere carte 2014 - 2015 2014 - 2015

    Cu geam H = 6 m ICARA24GH6 313,2 1,0554 330,6Cu geam H = 7 m ICARA24GH7 311,3 1,0554 328,5 pag.carte: 69Cu geam H = 8 m ICARA24GH8 309,3 1,0554 326,4Cu geam H = 9 m ICARA24GH9 307,3 1,0554 324,3Cu geam H = 10 m ICARA24GH10 305,4 1,0554 322,3Frgeam ICARA24P 608,7 1,0554 642,4TABEL CENTRALIZATOR COSTURI NCHIDERE LATERALEXTERIOARCU B.C.A.DE 24 CM GROSIME, FINISATINTERIOR I EXTERIOR

    Tipul nlime Simbol pret indice cost actualizatde nchidere carte 2014 - 2015 2014 - 2015Cu geam H = 6 m IBCA24GH6 300,6 1,0356 311,3Cu geam H = 7 m IBCA24GH7 298,8 1,0356 309,4 pag.carte: 70Cu geam H = 8 m IBCA24GH8 296,9 1,0356 307,5Cu geam H = 9 m IBCA24GH9 295,1 1,0356 305,6Cu geam H = 10 m IBCA24GH10 293,2 1,0356 303,6Frgeam IBCA24P 595,3 1,0356 616,5

    pag.40

    TABEL CENTRALIZATOR COSTURI NCHIDERE LATERALEXTERIOARCU B.C.A. AUGUST 2014 - AUGUST 2015DE 20 CM GROSIME, FINISATINTERIOR I EXTERIOR

  • 8/10/2019 Indici de Actualizare 2014-2015

    54/117

    Tipul nlime Simbol pret indice cost actualizatde nchidere carte 2014 - 2015 2014 - 2015

    Cu geam H = 6 m IBCA24GH6 356,7 1,0128 361,3

    Cu geam H = 7 m IBCA24GH7 339,7 1,0128 344,0 pag.carte: 71Cu geam H = 8 m IBCA24GH8 322,7 1,0128 326,8Cu geam H = 9 m IBCA24GH9 305,6 1,0128 309,5Cu geam H = 10 m IBCA24GH10 288,6 1,0128 292,3Frgeam IBCA24P 552,0 1,0128 559,1TABEL CENTRALIZATOR COSTURI FINISAJE PENTRU HALE INDUSTRIALETip finisaj Simbol pret indice cost actualizat

    carte 2014 - 2015 2014 - 2015Finisaj interior FINIHALA 140,0 0,9482 132,7Finisaj obinuit pentru vestiar FINIVEST 472,2 0,9703 458,2 pag.carte:72TABEL CENTRALIZATOR COSTURI INSTALAII FUNCIONALE PENTRU HALE INDUSTRIALETip instalaie Simbol pret indice cost actualizat

    carte 2014 - 2015 2014 - 2015Instalaii electrice (220v) ELHALAC 56,8 1,0184 57,8Instalaii sanitare SAHALAC 69,5 0,9794 68,1Instalaii sanitare vestiar SAHALAVE 17,7 0,9784 17,3Instalaii de nclzire INCHALAC 109,8 0,9749 107,0

    pag.41

    TABEL CENTRALIZATOR COSTURI HALDE DEPOZITARE CU STRUCTURPE CADRE AUGUST 2014 - AUGUST 2015DIN BETON ARMAT I NCHIDERE CU PANOURI IZOLATOARE DE TIP ISOPAN

  • 8/10/2019 Indici de Actualizare 2014-2015

    55/117

    Denumire Gradul Simbol pret indice cost actualizatseismic carte 2014 - 2015 2014 - 2015

    Infrastructur Grad 6 6INFHDSC 538,6 1,0367 558,4

    Grad 7 7INFHDSC 560,8 1,0367 581,4 pag.carte: 73Grad 8 8INFHDSC 585,8 1,0367 607,3Grad 9 9INFHDSC 636,4 1,0367 659,8

    Suprastructura Grad 6 6SHDSC 475,5 1,0081 479,4Grad 7 7SHDSC 495,1 1,0081 499,1Grad 8 8SHDSC 517,1 1,0081 521,3Grad 9 9SHDSC 561,8 1,0081 566,4

    Finisaj FINHDSC 594,6 1,0198 606,4Instalaii electrice ELHDSC 48,8 1,0011 48,9Instalaii sanitare SAHDSC 99,0 0,9416 93,2Instalaii de nclzire IVHDSC 13,3 0,9362 12,5TABEL CENTRALIZATOR COSTURI HALINDUSTRIALDIN EUROPROFILE ZINCATECU O DESCHIDERE DE 12 M

    Denumire Gradul Simbol pret indice cost actualizatseismic carte 2014 - 2015 2014 - 2015

    Suprastructura Grad 6 6EPZN1D12 1.897,8 0,8978 1.703,8Grad 7 7EPZN1D12 1.976,1 0,8978 1.774,1 pag.carte: 76

    Grad 8 8EPZN1D12 2.064,1 0,8978 1.853,1Grad 9 9EPZN1D12 2.242,2 0,8978 2.013,0Finisaj FIEPZN1D 231,6 1,0154 235,2Instalaii electrice ELEPZN1D 29,9 1,0289 30,8Instalaii sanitare SEPZN1D 8,2 0,9767 8,0Instalaii de nclzire IEPZN1D 31,2 0,9872 30,8

    pag.42

    TABEL CENTRALIZATOR COSTURI HALINDUSTRIALDIN EUROPROFILE ZINCATE AUGUST 2014 - AUGUST 2015CU O DESCHIDERE DE 14 M

    D i G d l Si b l t i di t t li t

  • 8/10/2019 Indici de Actualizare 2014-2015

    56/117

    Denumire Gradul Simbol pret indice cost actualizatseismic carte 2014 - 2015 2014 - 2015

    Suprastructura Grad 6 6EPZN1D14 1.784,2 0,9133 1.629,5

    Grad 7 7EPZN1D14 1.857,8 0,9133 1.696,7 pag.carte: 77Grad 8 8EPZN1D14 1.940,6 0,9133 1.772,3Grad 9 9EPZN1D14 2.108,0 0,9133 1.925,2

    Finisaj FIEPZN1D 231,6 1,0154 235,2Instalaii electrice ELEPZN1D 29,9 1,0289 30,8Instalaii sanitare SEPZN1D 8,2 0,9767 8,0Instalaii de nclzire IEPZN1D 31,2 0,9872 30,8TABEL CENTRALIZATOR COSTURI HALINDUSTRIALDIN EUROPROFILE ZINCATECU O DESCHIDERE DE 17 M

    Denumire Gradul Simbol pret indice cost actualizatseismic carte 2014 - 2015 2014 - 2015

    Suprastructura Grad 6 6EPZN1D17 1.669,5 0,9191 1.534,4Grad 7 7EPZN1D17 1.738,5 0,9191 1.597,9 pag.carte: 78Grad 8 8EPZN1D17 1.815,9 0,9191 1.669,0Grad 9 9EPZN1D17 1.972,5 0,9191 1.812,9

    Finisaj FIEPZN1D 231,6 1,0154 235,2Instalaii electrice ELEPZN1D 29,9 1,0289 30,8

    Instalaii sanitare SEPZN1D 8,2 0,9767 8,0Instalaii de nclzire IEPZN1D 31,2 0,9872 30,8TABEL CENTRALIZATOR COSTURI HALINDUSTRIALDIN EUROPROFILE ZINCATECU O DESCHIDERE DE 20 M

    Denumire Gradul Simbol pret indice cost actualizatseismic carte 2014 - 2015 2014 - 2015

    Suprastructura Grad 6 6EPZN1D20 1.556,5 0,9053 1.409,1Grad 7 7EPZN1D20 1.620,8 0,9053 1.467,3 pag.carte: 79Grad 8 8EPZN1D20 1.692,9 0,9053 1.532,6

    Grad 9 9EPZN1D20 1.839,0 0,9053 1.664,8Finisaj FIEPZN1D 231,6 1,0154 235,2Instalaii electrice ELEPZN1D 29,9 1,0289 30,8Instalaii sanitare SEPZN1D 8,2 0,9767 8,0Instalaii de nclzire IEPZN1D 31,2 0,9872 30,8

    pag.43

    TABEL CENTRALIZATOR COSTURI HALINDUSTRIALDIN EUROPROFILE ZINCATE AUGUST 2014 - AUGUST 2015CU DOUDESCHIDERI DE 12 M

    Denumire Gradul Simbol pret indice cost actualizat

  • 8/10/2019 Indici de Actualizare 2014-2015

    57/117

    Denumire Gradul Simbol pret indice cost actualizatseismic carte 2014 - 2015 2014 - 2015

    Suprastructura Grad 6 6EPZN2D12 1.707,6 0,8298 1.417,0

    Grad 7 7EPZN2D12 1.777,8 0,8298 1.475,2 pag.carte: 80Grad 8 8EPZN2D12 1.857,1 0,8298 1.541,0Grad 9 9EPZN2D12 2.017,5 0,8298 1.674,1

    Finisaj FIEPZN2D 130,2 1,0418 135,6Instalaii electrice ELEPZN2D 26,9 1,0248 27,6Instalaii sanitare SEPZN2D 15,2 0,9687 14,7Instalaii de nclzire IEPZN2D 25,9 0,9728 25,2TABEL CENTRALIZATOR COSTURI HALINDUSTRIALDIN EUROPROFILE ZINCATECU DOUDESCHIDERI DE 14 M

    Denumire Gradul Simbol pret indice cost actualizatseismic carte 2014 - 2015 2014 - 2015

    Suprastructura Grad 6 6EPZN2D12 1.622,7 0,8296 1.346,2Grad 7 7EPZN2D12 1.689,4 0,8296 1.401,5 pag.carte: 81Grad 8 8EPZN2D12 1.764,7 0,8296 1.464,0Grad 9 9EPZN2D12 1.917,2 0,8296 1.590,5

    Finisaj FIEPZN2D 130,2 1,0418 135,6Instalaii electrice ELEPZN2D 26,9 1,0248 27,6

    Instalaii sanitare SEPZN2D 15,2 0,9687 14,7Instalaii de nclzire IEPZN2D 25,9 0,9728 25,2TABEL CENTRALIZATOR COSTURI HALINDUSTRIALDIN EUROPROFILE ZINCATECU DOUDESCHIDERI DE 17 M

    Denumire Gradul Simbol pret indice cost actualizatseismic carte 2014 - 2015 2014 - 2015

    Suprastructura Grad 6 6EPZN2D17 1.536,6 0,9100 1.398,3Grad 7 7EPZN2D17 1.599,8 0,9100 1.455,8 pag.carte: 82Grad 8 8EPZN2D17 1.671,1 0,9100 1.520,7

    Grad 9 9EPZN2D17 1.815,5 0,9100 1.652,1Finisaj FIEPZN2D 130,2 1,0418 135,6Instalaii electrice ELEPZN2D 26,9 1,0248 27,6Instalaii sanitare SEPZN2D 15,2 0,9687 14,7Instalaii de nclzire IEPZN2D 25,9 0,9728 25,2

    pag.44

    TABEL CENTRALIZATOR COSTURI HALINDUSTRIALDIN EUROPROFILE ZINCATE AUGUST 2014 - AUGUST 2015CU DOUDESCHIDERI DE 20 M

    Denumire Gradul Simbol pret indice cost actualizat

  • 8/10/2019 Indici de Actualizare 2014-2015

    58/117

    Denumire Gradul Simbol pret indice cost actualizatseismic carte 2014 - 2015 2014 - 2015

    Suprastructura Grad 6 6EPZN2D20 1.451,4 0,9179 1.332,2

    Grad 7 7EPZN2D20 1.511,1 0,9179 1.387,0 pag.carte: 83Grad 8 8EPZN2D20 1.578,4 0,9179 1.448,8Grad 9 9EPZN2D20 1.714,8 0,9179 1.574,0

    Finisaj FIEPZN2D 130,2 1,0418 135,6Instalaii electrice ELEPZN2D 26,9 1,0248 27,6Instalaii sanitare SEPZN2D 15,2 0,9687 14,7Instalaii de nclzire IEPZN2D 25,9 0,9728 25,2TABEL CENTRALIZATOR COSTURI HALINDUSTRIALCU PANOURI IZOLATOARE TIPISOPAN - GROSIMEA PERETELUI 10 CM I NVELITOAREA DE 10 CM

    Denumire eschidere Simbol pret indice cost actualizatcarte 2014 - 2015 2014 - 2015

    Cldire cu panouri 9 m 10PANIZO109 1.232,1 1,0541 1.298,8izolatoare (Grosime 12 m 10PANIZO1012 1.168,7 1,0026 1.171,7 pag.carte: 84perete:10 cm 15 m 10PANIZO1015 1.031,0 1,0262 1.058,0nvelitoare: 10 cm)

    Finisaj interior FINIZOPAN 130,2 1,0418 135,6Instalaii electrice ELIZOPAN 26,9 1,0248 27,6

    Instalaii sanitare SIZOPAN 15,2

    0,9687 14,7Instalaii de nclzire IIZOPAN 25,9 0,9728 25,2TABEL CENTRALIZATOR COSTURI HALINDUSTRIALCU PANOURI IZOLATOARE TIPISOPAN - GROSIMEA PERETELUI 16 CM I NVELITOAREA DE 12 CM

    Denumire eschidere Simbol pret indice cost actualizatcarte 2014 - 2015 2014 - 2015

    Cldire cu panouri 9 m 10PANIZO109 1.256,7 1,0785 1.355,4izolatoare (Grosime 12 m 10PANIZO1012 1.190,9 1,0188 1.213,3 pag.carte: 85perete:16 cm 15 m 10PANIZO1015 1.125,2 1,0175 1.144,9

    nvelitoare: 12 cm)Finisaj interior FINIZOPAN 130,2 1,0418 135,6Instalaii electrice ELIZOPAN 26,9 1,0248 27,6Instalaii sanitare SIZOPAN 15,2 0,9687 14,7Instalaii de nclzire IIZOPAN 25,9 0,9728 25,2

    pag.45

    TABEL CENTRALIZATOR COSTURI HALDEPOZIT CU STLPI PREFABRICAI DE 4 M AUGUST 2014 - AUGUST 2015NCASTRAI N FUNDAII DE TIP PAHAR AV ND DESCHIDEREA DE 9 M I ACOPERI

    DE TIP CHESON

  • 8/10/2019 Indici de Actualizare 2014-2015

    59/117

    DE TIP CHESONGradul Numar de Simbol pret indice cost actualizatseismic deschideri carte 2014 - 2015 2014 - 2015

    1 6DEP1D9H4 973,5 1,0100 983,2Grad 6 2 6DEP2D9H4 869,6 0,9942 864,6 pag.carte: 75

    3 6DEP3D9H4 844,8 0,9655 815,71 7DEP1D9H4 1.013,6 1,0100 1.023,7

    Grad 7 2 7DEP2D9H4 905,4 0,9942 900,13 7DEP3D9H4 879,6 0,9655 849,31 8DEP1D9H4 1.058,7 1,0100 1.069,3

    Grad 8 2 8DEP2D9H4 945,8 0,9942 940,33 8DEP3D9H4 918,8 0,9655 887,11 9DEP1D9H4 1.150,2 1,0100 1.161,7

    Grad 9 2 9DEP2D9H4 1.027,4 0,9942 1.021,43 9DEP3D9H4 998,1 0,9655 963,7

    TABEL CENTRALIZATOR COSTURI CLDIRE VECHE INDUSTRIALSp+P+1E(DEPOZITE I ATELIERE DE PRODUCIE)

    Denumire Gradul Simbol pret indice cost actualizatseismic carte 2014 - 2015 2014 - 2015Grad 6 6SCLISP1 1.062,7 1,0096 1.072,9

    Structur Grad 7 7SCLISP1 1.106,5 1,0096 1.117,1 pag.carte: 86Grad 8 8SCLISP1 1.155,8 1,0096 1.166,9Grad 9 9SCLISP1 1.255,6 1,0096 1.267,7

    Finisaj FINSCLISP1 319,8 1,0008 320,1Instalaii electrice ELSCLISP1 63,3 0,9925 62,8Instalaii sanitare SASCLISP1 21,5 0,9907 21,3Instalaii de nclzire ISCLISP1 71,5 0,9964 71,2

    pag.46

    TABEL CENTRALIZATOR COSTURI CLDIRE P+1E AUGUST 2014 - AUGUST 2015(HALDE PRODUCIE + DEPOZIT)

    Denumire Gradul Simbol pret indice cost actualizat

  • 8/10/2019 Indici de Actualizare 2014-2015

    60/117

    e u e G adu S bo p et d ce cost actua atseismic carte 2014 - 2015 2014 - 2015Grad 6 6SCLDP1 717,7 1,0090 724,2

    Structur Grad 7 7SCLDP1 747,3 1,0090 754,0 pag.carte: 86Grad 8 8SCLDP1 780,6 1,0090 787,6Grad 9 9SCLDP1 848,0 1,0090 855,6

    Finisaj FINSCLDP1 292,2 0,9225 269,6Instalaii electrice ELSCLDP1 63,3 0,9925 62,8Instalaii sanitare SASCLDP1 21,5 0,9907 21,3Instalaii de nclzire ISCLDP1 71,5 0,9964 71,2TABEL CENTRALIZATOR COSTURI CLDIRE P+2E(VESTIARE + BIROURI)

    Denumire Gradul Simbol pret indice cost actualizatseismic carte 2014 - 2015 2014 - 2015Grad 6 6CLVEST 872,2 1,0046 876,2

    Structur Grad 7 7CLVEST 883,7 1,0046 887,8 pag.carte: 87Grad 8 8CLVEST 902,9 1,0046 907,1Grad 9 9CLVEST 925,5 1,0046 929,8

    Finisaj FINCLVEST 740,9 0,9987 739,9Instalaii electrice ELCLVEST 63,3 0,9925 62,8Instalaii sanitare SACLVEST 21,5 0,9907 21,3Instalaii de nclzire ICLVEST 71,5 0,9964 71,2

    pag.47

    TABEL CENTRALIZATOR COSTURI BARACMETALIC AUGUST 2014 - AUGUST 2015Denumire Suprafaa Simbol pret indice cost actualizat

    carte 2014 - 2015 2014 - 2015

  • 8/10/2019 Indici de Actualizare 2014-2015

    61/117

    Baracmetalicdin 210 mp BMVOP210 921,9 0,9895 912,2tablneagrvopsit 280 mp BMVOP280 782,7 0,9895 774,5 pag.carte: 89

    cutat/ondulat 350 mp BMVOP350 704,5 0,9895 697,1Baracmetalicdin 210 mp BMZN210 872,2 0,9250 806,8tablzincat 280 mp BMZN280 700,7 0,9250 648,1cutat/ondulat 350 mp BMZN350 673,7 0,9250 623,2TABEL CENTRALIZATOR COSTURI CABINPOARTI CUVDE BETON AFERENTPOD BASCUL

    Denumire Simbol pret indice cost actualizatcarte 2014 - 2015 2014 - 2015

    Cabinpoart CABPOART 2.678,2 0,9798 2.624,1Cabinpod bascul CABPBASC 1.483,9 0,9652 1.432,3 pag.carte: 90Cuvde beton aferent pod bascul CUVABASC 2.147,6 0,9489 2.037,9TABEL CENTRALIZATOR COSTURI CONDUCTE TEHNOLOGICEPOZATE PE CONSOLE METALICE

    Denumire Simbol pret indice cost actualizatcarte 2014 - 2015 2014 - 2015

    Douevi cu Frizolaie 2T2INFIZO 167,4 1,0013 167,6dia.=2" Cu izolaie 2T2INCIZO 279,2 0,8123 226,8 pag.carte: 91

    Douevi cu Frizolaie 2T3INFIZO 243,4 1,0013 243,7dia.=3" Cu izolaie 2T3INCIZO 310,6 0,8123 252,3Douevi cu Frizolaie 2T4INFIZO 326,9 1,0013 327,3dia.=4" Cu izolaie 2T4INCIZO 401,9 0,8123 326,5TABEL CENTRALIZATOR COSTURI SUPORT METALIC PENTRUSUSINEREA CONDUCTELOR TEHNOLOGICE

    Denumire Simbol pret indice cost actualizatcarte 2014 - 2015 2014 - 2015

    Suport metalic SUPMET 28,6 1,0133 29,0

    pag.48

    TABEL CENTRALIZATOR COSTURI CANALE PARDOSEAL AUGUST 2014 - AUGUST 2015CU HIDROIZOLAIE LATERAL

    Denumire Dim. Simbol pret indice cost actualizat

  • 8/10/2019 Indici de Actualizare 2014-2015

    62/117

    (cm) carte 2014 - 2015 2014 - 2015Canal pardosealcu plci de 50 x 50 CPB50X50 523,5 0,9877 517,1

    beton cu hidroizolaie 50 x 70 CPB50X70 664,7 0,9877 656,5 pag.carte: 9250 x 90 CPB50X90 827,7 0,9877 817,5

    Canal pardosealcu plci din 50 x 50 CPT50X50 481,1 0,9877 475,2tablstriat 50 x 70 CPT50X70 603,9 0,9877 596,5

    50 x 90 CPT50X90 742,1 0,9877 733,0TABEL CENTRALIZATOR COSTURI CUVAFERENT REPARAII AUTO

    Denumire Simbol pret indice cost actualizatcarte 2014 - 2015 2014 - 2015

    Cuvaferentreparaii auto Cu finisaj CUVAAUTO 2.898,3 1,0260 2.973,7 pag.carte: 92Frfinisaj CUVAREP 1.978,3 1,0389 2.055,3

    TABEL CENTRALIZATOR COSTURI INDE RULARE (PRE/ML)Denumire Simbol pret indice cost actualizat

    carte 2014 - 2015 2014 - 2015inde rulare pe traverse de fag SINARULARE 462,0 0,8622 398,3 pag.carte: 93TABEL CENTRALIZATOR COSTURI SCAUN TAMPON (PRE/ BUCAT)

    Denumire Simbol pret indice cost actualizatcarte 2014 - 2015 2014 - 2015

    Scaun tampon SCAUNTA 598,3 0,8550 511,5 pag.carte: 93TABEL CENTRALIZATOR COSTURI FUNDAIE UTILAJ (UTILAJ / MC)Denumire Simbol pret indice cost actualizat

    carte 2014 - 2015 2014 - 2015Fundaie utilaj de amortizare a trepidaiilor FSUTILAJ 778,8 1,0402 810,1 pag.carte: 93

    pag.49

    TABELE CENTRALIZATOARE COSTURI TIPURI DE CABLURI AFERENTE INSTALAIEI DE FOR AUGUST 2014 - AUGUST 20151.Cabluri cu 3 - 4 fire cu seciunile ntre 4 - 35 mm

    Denumire Dimensiuni pret indice cost actualizat

  • 8/10/2019 Indici de Actualizare 2014-2015

    63/117

    carte 2014 - 2015 2014 - 20153x4 0,6/1 kV 12,2 0,9769 11,9

    4x4 0,6/1 kV 14,9 0,9769 14,6 pag.carte: 942x6 0,6/1 kV 12,4 0,9769 12,13x6 0,6/1 kV 16,5 0,9769 16,14x6 0,6/1 kV 20,7 0,9769 20,22x10 0,6/1 kV 18,0 0,9769 17,6

    Cablu electric din cupru tip CYABY 3x10 0,6/1 kV 24,5 0,9769 23,94x10 0,6/1 kV 31,4 0,9769 30,72x16 0,6/1 kV 28,8 0,9769 28,13x16 0,6/1 kV 40,4 0,9769 39,54x16 0,6/1 kV 52,2 0,9769 51,03x25 0,6/1 kV 61,0 0,9769 59,64x25 0,6/1 kV 79,8 0,9769 78,04x35 0,6/1 kV 107,6 0,9769 105,1

    2.Cabluri cu nul de protecie cu 3 fire, cu seciunile ntre 25 - 120 mmDenumire Dimensiuni pret indice cost actualizat

    carte 2014 - 2015 2014 - 20