Link Budget
Internal Use Only▲
<ZTE Confidential>
OutlineBasic conception of link budget
Reverse link budget in CDMA 2000 1X
Forward link budget in CDMA 2000 1X
Internal Use Only▲
<ZTE Confidential>
OUTLINE
Basic concept of link budgetBasic concept of link budgetBasic concept of link budget
Reverse link budget in CDMA2000Reverse link budget in CDMA2000Reverse link budget in CDMA2000
Forward link budget in CDMA2000Forward link budget in CDMA2000Forward link budget in CDMA2000
Internal Use Only▲
<ZTE Confidential>
What is Link BudgetUnder condition of ensuring the service quality, confirm the Maximum Allowable Path Loss of the propagation environment between BTS and terminals.
To predict coverage radius using link budget
Figure out numbers of sectors to meet coverage requirement
building
HataCost231
Correction model
…
HataCost231
Correction model
…
Internal Use Only▲
<ZTE Confidential>
The constitution of wireless link
Receiver
antenna
antenna
Transmission line
Transmitter
Transmission line
Transmit Power
Loss of transmission line
Gain
Path loss
Gain
Loss of transmission linesensitivity
Margin
Internal Use Only▲
<ZTE Confidential>
Link Budget Model
Up link
Down link
mobile BTSFeeder loss
Antenna gain
Path loss
Antenna gain
Feeder loss margin
Margin:Fade margin、Interference margin、Penetration loss…
Margin:Fade margin、Interference margin、Penetration loss…
Internal Use Only▲
<ZTE Confidential>
Transmitter
)()()(
)()(
dBLossorBodyfeederdBiternOfTansmitAntennaGai
dBmerTansmitPowdBmRPTransmitEI
−+
=
Internal Use Only▲
<ZTE Confidential>
Receiver
)()()/(
)/()(
HzdBDataRatedBreqNoEb
HzdBmceNoiseInterferendBmitivityceiverSensRe
−++=
Internal Use Only▲
<ZTE Confidential>
Penetration Loss
Main mechanism:
diffraction, refractionCalculation method:statistic
Building lossCar loss
?
?
?
Typical value of Building Penetration Loss
Dense urban
Urban
Sub urban
Rural
25 dB
20 dB
15 dB
6 dB
Open land 0 dB
Internal Use Only▲
<ZTE Confidential>
Fade margin
90%
75%
Assuming that at least 75% of edge area (90% in cell) can reliably receive signal strength more than -105dBm. Standard Deviation is generally 8 dB.From the table we can find that 75% Probability corresponds to 0.675σ
0.675 x 8 = 5.4 dB-105 + 5.4 = -99.6 dBm
Therefore, The designed middle value should be -99.6 dBm
Deviation to middle value signal strength M
Accumulated normal probability distributing
0%10%20%30%40%50%60%70%80%90%
100%
-3 -2.5 -2 -1.5 -1 -0.5 0 0.5 1 1.5 2 2.5 3
75%
0.675σ
Are
a
Pro
babi
lity
dens
ity
-99.6dBm
σ=8dB
RSSI
Normal Distribution0.675σ=5.4 dΒ
- 105 dBm
[ ]dxxxPP mx
xx 2
2
0
0 2)(
21
0 exp][σπσ−−
∞
∫=≥=
Internal Use Only▲
<ZTE Confidential>
OUTLINE
Basic concept of link budgetBasic concept of link budgetBasic concept of link budget
Reverse link budget inCDMA2000Reverse link budget inCDMA2000Reverse link budget inCDMA2000
Forward link budget inCDMA2000Forward link budget inCDMA2000Forward link budget inCDMA2000
内部公开▲
<本文中的所有信息归中兴通讯股份有限公司所有,未经允许,不得外传>
CDMA 2000 1X System 800M Reverse link budget
Internal Use Only▲
<ZTE Confidential>
Explanation for link budget (1)
service rate:Use to show the voice service and data service system can support, at present, Radio Configuration in CDMA2000 1X is RC3, so in reverse link ,it can support 9.6kbps,19.2kbps,38.4kbps,76.8kbps,153.6kbps.
MS EIRPCDMA terminal’s maximum TX power is 0.2W, 23dBm
MS antenna gainCDMA mobile’s antenna gain is 0 dB,and fixed terminal (in door or out doot) has its relative gain.
Body lossMost of the time body loss is 3 dB,IF it is fixed terminal or data service,we could consider that mobile a little far from body, and body loss can be 0dB.
Internal Use Only▲
<ZTE Confidential>
Explanation for link budget (2)
common antenna gain
11dBi7360Single
16.5dBi6.590Dual
18dBi765Dual
1.9G
11dBi8360Single
15.5dBi1090Single
17dBi1065Single
800M
10dBi10360Single
Single
15.5dBi1765Dual
450M
Gain Vertical beamwidthHorizon beamwidthPolarization
Internal Use Only▲
<ZTE Confidential>
Explanation for link budget (3)BS feeder loss
When the length from BTS to antenna is less than 15m, usually only 1/2 inch Jumper cable is required. Meanwhile there is only jumper cable loss.
If 7/8 inch feeder cable is also used, we needs to take 7/8 inch feeder loss into consideration. When cable is longer than 80m, we consider it’s too long, it’s better to use 5/4 inch or other big size feeder.
Antenna
1/2“Jumper
7/8“Cable
Grounding Clip
1/2“Jumper
Cabinet
LighteningArrester Grounding Clip
Internal Use Only▲
<ZTE Confidential>
Explanation for link budget (4)
Eb/N0Eb/N0 is demodulation SNR which reverse link requires when system is unload。In practical system, the Eb/N0 required is different in different frequency band, different wireless environment, different terminal characteristic, different RC, different frame error rate. Minimum Performance testing standard provides Eb/N0 at a high FER and a low FER, If Eb/N0 of other FER is required,figure it out by linear interpolation.The table below is from standard:
4.5 @ 6.1 dB9.0 @ 5.5 dB12002.5 @ 6.1 dB7.5 @ 5.5 dB24000.9 @ 6.1 dB5.5 @ 5.5 dB48000.3 @ 6.1 dB3.5 @ 5.5 dB9600
5
14.0 @ 6.5 dB22.0 @ 5.9 dB120012.0 @ 6.5 dB23.0 @ 5.9 dB24002.2 @ 6.5 dB7.6 @ 5.9 dB48000.3 @ 6.5 dB2.8% @ 5.9 dB9600
0, 2, 3, 5, 7, and 9
B
At Upper Eb/N0At Lower Eb/N0FER Limits (%)
Data Rate (bps)Band ClassesCase
Internal Use Only▲
<ZTE Confidential>
Explanation for link budget (5)
Interference MarginThis value is related to System Loading.
The formula is:
In CDMA 2000 1X system, generally loading factor is 75%。
)1(-10logmargin einterfernc 10 systemload−=
Internal Use Only▲
<ZTE Confidential>
Explanation for link budget (6)
soft hand-off gainSoft hand-off provides forward traffic channel multi-path diversity at the edge of BS, improves channel’s ability of anti-fading, decreases mobile’s Tx power, thereby decreases mobiles' interference to system, and extra gain to reverse link coverage.In CDMA system, soft hand-off gain’s concrete value is related to correlation coefficient ρof two propagation path, normal fading variance σ, edge coverage rate Prel.
4.670.50.98
4.20.50.95
4.090.50.9
3.70.50.75
Soft hand-off gain(dB)
σ=8dBρPrel
Internal Use Only▲
<ZTE Confidential>
Explanation for link budget (7)
Edge Coverage probability of serving areaThere are relationship between edge coverage probability and area coverage probability. The concrete relationship is as follows: In the chart the left y-axis is the area coverage probability, right y-axis is edge coverage probability, and x-axis is the standard deviation/ index of path loss. example:path loss index: n=4 (complex propagation environment), standard deviation=8dB, edge coverage rate=75%, corresponding area coverage probability will be 94%; path loss index n=2 (free space), standard deviation=8dB,edge coverage rate=75%, corresponding area coverage probability will be 91%.
Internal Use Only▲
<ZTE Confidential>
Explanation for link budget (8)
Antenna HeightGenerally antenna height is lower in dense urban area with
large capacity, to reduce pilot pollution and interference to other cells.
In open area with the capacity distributes dispersible, antenna height will be higher, and cover lager area.
Recommended Antenna height values are as follows: dense urban: 30m, urban: 40m,suburban and rural: 50m.
Internal Use Only▲
<ZTE Confidential>
>19.2 kbps>38.4 kbps
>153.6 kbps
>76.8 kbpsdistance
subscribers
>9.6 kbps
Explanation for link budget (9)
antenna heightIn same environment, the faster the speed of data rate is, the smaller the coverage
radius 1X system can provide is.Comparing with voice service, high speed data service’s coverage radius is smaller,
but generally the capacity is key restricted factor, especially in urban environment. So BTS’s actual coverage radius is smaller than coverage prediction, and the coverage radius that data service provides in 1X system can also approach the actual radius BS provides.
Internal Use Only▲
<ZTE Confidential>
Explanation for link budget (10)
EVDO (RLS 0) Reverse link budget related
Structure of link budget table is the same as data service part of CDMA 1X
Name of Parameters changedMobile station :MS—>access terminal :AT
Frame error rate FER—>package error rate:PER
Value of parameters Demodulating threshold Eb/No is different from CDMA
1X,but it is simuliar with CDMA 1X
Body loss is 0dB
Internal Use Only▲
<ZTE Confidential>
OUTLINE
Basic concept of link budgetBasic concept of link budgetBasic concept of link budget
Reverse link budget in CDMA2000Reverse link budget in CDMA2000Reverse link budget in CDMA2000
Forward link budget inCDMA2000Forward link budget inCDMA2000Forward link budget inCDMA2000
Internal Use Only▲
<ZTE Confidential>
CDMA 2000 1X system 800M forward link budget
Internal Use Only▲
<ZTE Confidential>
Explanation (1)
The maximum Tx power per traffic channel in one BTSThis value is in direct ratio with rated transmit power of the BTS.In RC3 configuration, when system parameters are default. The maximum Tx
power per traffic channel (voice) accounts for the total output 7.46%, approximate 31.47dBm, under the condition of two legs.
In 8X and 16X data rate system, The upper limit of Supplemental channel’s Tx power accounts for total output power 25% ,approximate 36.99dBm.
In 2X and 4X data rate, The upper limit of Supplemental channel’s Tx power accounts for total output power 19.9% ,approximate 36dBm.
trafftrafpagPsyncpiltotal PMKPNPPP α+++=pilP
syncP
pagP
trafP
pN
M
fα
trafK
Power of pilot channel;
Power of sych channel ;
Power of paging channel;
Power of traffic channnel;
Channel number of active paging channel;
channel number of active traffic channel;
Forward link voice activation factor;
Forward link power control factor
Internal Use Only▲
<ZTE Confidential>
Explanation (2)
interference factor of other cellsForward link interference includes two parts: interference of local cell and of other cells.Because CDMA’s forward link channel is orthogonalized by Walsh code, in ideal situation, interference from local cell is 0, but multi-path results in incomplete orthogonalization of other channels, which increases interference, and it becomes the main interference gradually when mobile station is getting closer to Base station.The interference from other cells becomes the main interference gradually when mobile station is getting closer to the edge of cell, it is also the interference we calculated in forward link budget.
Internal Use Only▲
<ZTE Confidential>
A sample of EVDO forward link budget
Internal Use Only▲
<ZTE Confidential>
EVDO link budget explanation—Terminology
Demodulation threshold—Required Îor/No for each antennaDual antennas terminalÎor and No are both power spectrum density, custom usage for DO, it can be converted to Eb/Nt.
Rx Diversity GainUnder the same condition of download bitrates, target PER, the antenna’s demodulation threshold Îor/No required by dual antenna terminal is lower than that of signal antenna terminal.According to ZTE shield room’s test result, the gain is approximately 5~6dB
Package Error Rate—PERMulti-user Diversity Gain
The gain of forward throughput of sectors with multiple active users to those with single active user is correlate with forward dispatch algorithm.According to outdoor testing result, the gain is 2dB
Internal Use Only▲
<ZTE Confidential>
Single & dual antennaSingle antennaforwardTerminal types
38.4kbps~2.4Mbps, 9 classes
9.6kbps~153.6kbps, 5 classesforwardClass of forward
bitrates
Forward
Forward & reverse
Forward& reverse
Link
yesnoMulti-uses diversity gain
differentDemodulation threshold
0dB3dB(voice)0dB(data)
Body loss
EVDO1XItems
EVDO link budget explanation—difference from 1X