Tronson Principal 0.75 11.38 0.75 2.864 Str. 1 2.324 19.78 0.69 2.967 Str. 2 2.35 20.035 0.72 3.387 Str. 3 2.39 20.85 0.72 3.377 Str. 4 2.34 20.006 0.69 3.167 Total /m 10.154 92.051 3.57 15.762 19800.3 179499.45 6961.5 30735.9 Decopertare (m 3 /ml) Sapatura Mecanizata(m 3 /ml) Pat Nisip(m 3 /ml) Umplutura Manuala(m 3 /ml) Total general
-
Upload
andramaria -
Category
Documents
-
view
216 -
download
0
description
nota de calcul
Transcript of Tehnici Avansate de Planificare
Tronson
Principal 0.75 11.38 0.75 2.864 7.875Str. 1 2.324 19.78 0.69 2.967 15.93Str. 2 2.35 20.035 0.72 3.387 15.65Str. 3 2.39 20.85 0.72 3.377 8.17Str. 4 2.34 20.006 0.69 3.167 16.15
Total /m 10.154 92.051 3.57 15.762 63.775
19800.3 179499.45 6961.5 30735.9 124361.25
Decopertare(m3/ml)
Sapatura Mecanizata(m3/ml)
Pat Nisip(m3/ml)
Umplutura Manuala(m3/ml)
Umplutura Mecanizata(m3/ml)
Total general
2.5 0.75 10007.95 2.324 2008.03 2.35 150
16.42 2.39 3508 2.34 250
42.9 10.154 1950
83655 19800.3
Compactare(m3/ml)
Asfaltare (m3/ml)
Lungime tronson (m)