Propuneri WO Sepdatembrie 2014

15
631 Otesti Situatia actuala: in productie (7mc x 92% = 0.5t/zi) Ultima impachetare: ianuarie 2011 Etalonare dupa impachetare: 14.7 mc x 90% = 1.4 t/zi Sonde vecine: 548 Otesti: 16.4 mc x 91% = 1.4 t/zi 636 Otesti: 10 mc x 88% = 1.1 t/zi Debit estimat: 14 mc x 90% = 1.4 t/zi Program propus: despachetare, perforare liner slituit cu nr redus de gloante , reimpachetare

description

dadadad

Transcript of Propuneri WO Sepdatembrie 2014

Page 1: Propuneri WO Sepdatembrie 2014

631 Otesti

Situatia actuala: in productie (7mc x 92% = 0.5t/zi)Ultima impachetare: ianuarie 2011Etalonare dupa impachetare: 14.7 mc x 90% = 1.4 t/zi

Sonde vecine: 548 Otesti: 16.4 mc x 91% = 1.4 t/zi636 Otesti: 10 mc x 88% = 1.1 t/zi

Debit estimat: 14 mc x 90% = 1.4 t/zi

Program propus: despachetare, perforare liner slituit cu nr redus de gloante , reimpachetare

Page 2: Propuneri WO Sepdatembrie 2014

1332 Otesti

Situatia actuala: In Productie ( 8.7 mc x 96% = 0.3 t/zi)Ultima impachetare: februarie 2008Dupa impachetare – 12 mc x 85% = 1.7 t/zi

Sonde vecine: 864 Otesti: 13.8 mc x 92% = 1 t/zi

Program propus: - Despachetare- Reimpachetare

Debit estimat: 14 mc/zi x 90%= 1.3 t/zi

Page 3: Propuneri WO Sepdatembrie 2014

1228 Otesti

Situatia actuala: in productie 6.2 mc x 91% = 0.5 t/ziUltima impachetare: mai 2006Dupa impachetare – 12.6 mc x 85% = 1.8 t/zi

Sonde vecine:832 Otesti: 14.9 mc x 91% = 1.2 t/zi833 Otesti: 10.9 mc x 92% = 0.8 t/zi

Program propus: - Despachetare- Reperforare- Reimpachetare

Debit estimat: 15 mc/zi x 90%= 1.4 t/zi

1452 Otesti

Page 4: Propuneri WO Sepdatembrie 2014

Situatia actuala: in productie – 3.6 mc x 93% = 0.2 t/ziUltima impachetare: noiembrie 2007Dupa impachetare: 6.3 mc x 79 %= 1.2 t/zi

Sonde vecine: 1462 Otesti: 25mc x 95% = 1 t/zi807 Otesti: 22mc x 94% = 1.2 t/zi

Program propus:

- Despachetare- reperforare - reimpachetare

Debit estimat: 9 mc/zi x 86%= 1.2 t/zi

2851 Deleni

Page 5: Propuneri WO Sepdatembrie 2014

Situatia actuala: in productie (7.2 mc x 92% = 0.5 t/zi)Ultima impachetare: noiembrie 2007Dupa impachetare: 8.3 mc x 52 %= 3.2 t/zi

Sonde vecine:1052 Deleni: 3.1 cm x 76% = 0.7t/zi

Program propus:

- Despachetare- Reimpachetare

Debit estimat: 9 mc x 85%= 1.3 t/zi

2883 Deleni

Page 6: Propuneri WO Sepdatembrie 2014

Situatia actuala: in productie (5.6 mc x 91% = 0.4 t/zi)Impachetata: aprilie 2005 ( 16 mc x 92 %= 1.2 t/zi)

Sonde vecine:2884 Deleni: 77 mc x 88% = 0.9t/zi

Program propus:

- Despachetare- reimpachetare

Debit estimat: 12 mc x 88%= 1.3 t/zi

Page 7: Propuneri WO Sepdatembrie 2014

Tratament cleansolve:

822 Otesti

Situatia actuala: in productie (3 mc x 92% = 0.2 t/zi)Ultima impachetare: martie 2012 – 6.2 mc x 81% = 1.1 t/zi

Program propus: - Tratament cu solvent WTH

Debit estimat: 8 mc x 90%= 0.8 t/zi

Page 8: Propuneri WO Sepdatembrie 2014

1374 Otesti

Situatia actuala: In productie: 4.8 mc x 95% = 0.2 /zi t)Ultima impachetare: augus 2011 – 8.2 mc x 96% = 0.3 t/zi

Program propus: - Tratament cu solvent WTH-

Debit estimat: 7 mc x 90%= 0.7 t/zi

Programe WTH

Page 9: Propuneri WO Sepdatembrie 2014

1852 Otesti

Situatia actuala: In productie: 0.5 mc x 50% = 0.2 /zi t)Ultima impachetare: in teren, filter sparte, in februarie 2014 TTA Cleansolv

Program propus: - Program WTH

Debit estimat: 6 mc x 80%= 1.1 t/zi

463 Otesti

Situatia actuala: ARK: Ultima consolidare : iulie 2006 12mc x 89%= 1.2t/zi

Page 10: Propuneri WO Sepdatembrie 2014

Ultima etalonare: 2.7mc x 82%= 0.4t/zi (in 03.2011)

Program propus: - Program WTH

Debit estimat: 6 mc x 82%= 1 t/zi

EWIO

2895 Deleni

Page 11: Propuneri WO Sepdatembrie 2014

Situatia actuala: in injectie ARK: spalari frecvente, la spalare iese multa marnaSonde de reactie: 2896 Deleni: 4.8mc x 80%=0.9t/zi2893 Deleni: 2mc x 60%= 0.8t/zi2892 Deleni: 6.5mc x 82%= 1t/zi2894 Deleni: 2.6mc x 44%= 1.4t/zi

Program propus: - Program WTH

1732 Otesti

Page 12: Propuneri WO Sepdatembrie 2014

Situatia actuala: In productie: 3.2 mc x 85% = 0.4 t/zi)Ultima impachetare: in teren in noiembrie 2010 – 4.2 mc x 71% = 1 t/ziIn iulie 2012 TTA Klastop: 5.1mc x 58%= 2 t/zi

Program propus: - Tratament cu solvent WTH

Debit estimat: 5 mc x 90%= 0.9 t/zi

836 Otesti

Page 13: Propuneri WO Sepdatembrie 2014

Situatia actuala: In productie: 3.7 mc x 93% = 0.2 t/zi)Ultima impachetare: iulie 2011 – 6.7 mc x 90% = 0.6t/zi

Program propus: - Tratament cu solvent WTH

Debit estimat: 8 mc x 90%= 0.8 t/zi

743 Babeni

Situatia acuala: in productie 200 Stmc

Program propus:

Page 14: Propuneri WO Sepdatembrie 2014

- Aditionare : 702-706m He Sup, cu DP 2’’ Connex .

Debit estimat: 2000 Stmc