    GSFC-STD-7000

    April 2005

    Supersedes

    GEVS-SE dated June, 1996

    GENERAL ENVIRONMENTAL VERIFICATION STANDARD (GEVS)

    For GSFC Flight Programs and Projects

    Approved By:

    Original signed by______________________________

    Abigail Harper (Acting)

    Director of Systems Safety and Mission Assurance

    Original signed by

    ______________________________

    Michael Ryschkewitsch

    Director of Applied Engineering and Technology

    Original signed by

    ______________________________

    Arthur Obenschain

    Director of Flight Programs and Projects

    Original signed by

    ______________________________

    Richard Day

    Director of Mission Success

    NASA GODDARD SPACE FLIGHT CENTER

    Greenbelt, Maryland 20771

  • 8/6/2019 GEVS_GSFC-STD-7000 Foarte Tare Carte

    2/151

    ii

    GEVS

    Changes* to

    GENERAL ENVIRONMENTAL VERIFICATION STANDARD

    Change No. Date Nature of Change Initials

    * This document is controlled by the GSFC Office of Mission Success

  • 8/6/2019 GEVS_GSFC-STD-7000 Foarte Tare Carte

    3/151

    iii

    TABLE OF CONTENTS

    Paragraph Page

    SECTION 1 -- GENERAL INFORMATION

    1.1 PURPOSE.............................................................................................................................1-11.2 APPLICABILITY AND LIMITATIONS....................................................................................1-1

    1.3 THE GSFC VERIFICATION APPROACH ............................................................................1-1

    1.4 OTHER ASSURANCE REQUIREMENTS............................................................................1-2

    1.5 RESPONSIBILITY FOR ADMINISTRATION........................................................................1-2

    1.6 GEVS CONFIGURATION CONTROL AND DISTRIBUTION...............................................1-2

    1.7 APPLICABLE DOCUMENTS................................................................................................1-3

    1.7.1 Safety Requirements.............................................................................................................1-3

    1.7.2 NSTS Interface Requirements ..............................................................................................1-3

    1.7.3 ELV Payload User Manuals ..................................................................................................1-3

    1.7.4 Fracture Control and Stress Corrosion .................................................................................1-3

    1.7.5 Spacecraft Tracking and Data Network Simulation ..............................................................1-3

    1.7.6 Deep Space Network (DSN) Simulation ...............................................................................1-3

    1.7.7 NASA Standards ...................................................................................................................1-31.7.8 Military Standards for EMC Testing ......................................................................................1-4

    1.7.9 Military Standards for Non-Destructive Evaluation ...............................................................1-4

    1.8 DEFINITIONS........................................................................................................................ 1-4

    1-9 CRITERIA FOR UNSATISFACTORY PERFORMANCE......................................................1-9

    1.9.1 Failure Occurrence................................................................................................................1-9

    1.9.2 Failures with Retroactive Effect............................................................................................. 1-9

    1.9.3 Failure Reporting................................................................................................................... 1-9

    1.9.4 Wear Out ...............................................................................................................................1-9

    1.10 TEST SAFETY RESPONSIBILITIES....................................................................................1-9

    1.10.1 Operations Hazard Analysis, Responsibilities For................................................................1-9

    1.10.2 Treatment of Hazards .........................................................................................................1-10

    1.10.3 Facility Safety......................................................................................................................1-10

    1.10.4 Safety Responsibilities During Test ....................................................................................1-10

    1.11 TESTING OF SPARE HARDWARE ...................................................................................1-10

    1.12 TEST FACILITIES, CALIBRATION.....................................................................................1-11

    1.13 TEST CONDITION TOLERANCES....................................................................................1-11

    SECTION 2 -- VERIFICATION PROGRAM

    SECTION 2.1 - SYSTEM PERFORMANCE VERIFICATION

    2.1 SYSTEM PERFORMANCE VERIFICATION.....................................................................2.1-1

    2.1.1 Documentation Requirements ...........................................................................................2.1-12.1.1.1 System Performance Verification Plan ..............................................................................2.1-1

    2.1.1.1.1 Environmental Verification Plan .........................................................................................2.1-1

    2.1.1.2 System Performance Verification Matrix............................................................................2.1-2

    2.1.1.2.1 Environmental Test Matrix .................................................................................................2.1-2

    2.1.1.3 Environmental Verification Specification............................................................................2.1-3

    2.1.1.4 Performance Verification Procedures ................................................................................2.1-3

    2.1.1.5 Verification Reports............................................................................................................2.1-3

    2.1.1.6 System Performance Verification Report...........................................................................2.1-4

    2.1.1.7 Instrument Verification Documentation..............................................................................2.1-4

  • 8/6/2019 GEVS_GSFC-STD-7000 Foarte Tare Carte

    4/151

    Paragraph Page

    iv

    SECTION 2.2 - ENVIRONMENTAL VERIFICATION

    2.2 APPLICABILITY .................................................................................................................2.2-1

    2.2.1 Test Sequence and Level of Assembly..............................................................................2.2-1

    2.2.2 Verification Program Tailoring............................................................................................2.2-1

    2.2.2 Test Factors/Durations.......................................................................................................2.2-32.2.3 Qualification if Hardware by Similarity ...............................................................................2.2-3

    2.2.4 Test Factors/Durations.......................................................................................................2.2-4

    2.2.5 Structural Analysis/Design Factors of Safety.....................................................................2.2-4

    SECTION 2.3 - ELECTRICAL FUNCTION & PERFORMANCE

    2.3 ELECTRICAL FUNCTION TEST REQUIREMENTS.........................................................2.3-1

    2.3.1 Electrical Interface Tests....................................................................................................2.3-1

    2.3.2 Comprehensive Performance Tests ..................................................................................2.3-1

    2.3.3 Limited Performance Tests ................................................................................................2.3-1

    2.3.4 Performance Operating Time and Failure-Free Performance Testing ............................. .2.3-2

    2.3.5 Limited-Life Electrical Elements.........................................................................................2.3-2

    SECTION 2.4 - STRUCTURAL AND MECHANICAL

    2.4 STRUCTURAL AND MECHANICAL VERIFICATION REQUIREMENTS.........................2.4-1

    2.4.1 Structural Loads Qualification............................................................................................2.4-1

    2.4.1.1 Coupled Loads Analysis.....................................................................................................2.4-5

    2.4.1.1.1 Analysis-Strength Qualification..........................................................................................2.4-5

    2.4.1.1.2 Analysis-Clearance Verification .........................................................................................2.4-6

    2.4.1.2 Modal Survey .....................................................................................................................2.4-7

    2.4.1.3 Design Strength Qualification ............................................................................................2.4-8

    2.4.1.3.1 Strength Qualification - Beryllium.......................................................................................2.4-9

    2.4.1.4 Structural Reliability (Residual Strength Qualification) ....................................................2.4-10

    2.4.1.4.1 Primary and Secondary Structure....................................................................................2.4-10

    2.4.1.5 Acceptance Requirements...............................................................................................2.4-12

    2.4.2 Vibroacoustic Qualification...............................................................................................2.4-13

    2.4.2.1 Fatigue Life Considerations .............................................................................................2.4-14

    2.4.2.2 Payload Acoustic Test......................................................................................................2.4-14

    2.4.2.3 Payload Random Vibration Tests ....................................................................................2.4-15

    2.4.2.4 Subsystem/Instrument Vibroacoutic Tests.......................................................................2.4-16

    2.4.2.5 Component/Unit Vibroacoustic Tests...............................................................................2.4-16

    2.4.2.6 Acceptance Requirements...............................................................................................2.4-17

    2.4.2.7 Retest of Reflight Hardware.............................................................................................2.4-20

    2.4.2.8 Retest of Reworked Hardware.........................................................................................2.4-20

    2.4.3 Sinusoidal Sweep Vibration Qualification ........................................................................2.4-20

    2.4.3.1 ELV Payload Sine Sweep Vibration Tests.......................................................................2.4-21

    2.4.3.2 ELV Payload Subsystem (including Instruments) and Component Sine Sweep

    Vibration Tests .................................................................................................................2.4-22

    2.4.3.3 Acceptance Requirements...............................................................................................2.4-24

    2.4.4 Mechanical Shock Qualification.......................................................................................2.4-24

  • 8/6/2019 GEVS_GSFC-STD-7000 Foarte Tare Carte

    5/151

    Paragraph Page

    v

    2.4.4.1 Subsystem Mechanical Shock Tests ...............................................................................2.4-24

    2.4.4.2 Payload (Spacecraft) Mechanical Shock Tests ...............................................................2.4-26

    2.4.4.3 Acceptance Requirements...............................................................................................2.4-27

    2.4.5 Mechanical Function Verification .....................................................................................2.4-27

    2.4.5.1 Life Testing.......................................................................................................................2.4-27

    2.4.5.2 Demonstration..................................................................................................................2.4-302.4.5.3 Torque/Force Margin........................................................................................................2.4-34

    2.4.5.4 Acceptance Requirements...............................................................................................2.4-35

    2.4.6 Pressure Profile Qualification...........................................................................................2.4-36

    2.4.6.1 Demonstration..................................................................................................................2.4-36

    2.4.6.2 Acceptance Requirements...............................................................................................2.4-36

    2.4.7 Mass Properties Verification ............................................................................................2.4-37

    2.4.7.1 Demonstration..................................................................................................................2.4-37

    2.4.7.2 Acceptance Requirements...............................................................................................2.4-38

    SECTION 2.5 - EMC

    2.5 ELECTROMAGNETIC COMPATIBILITY (EMC) REQUIREMENTS.................................2.5-1

    2.5.1 Requirements Summary ....................................................................................................2.5-1

    2.5.1.1 The Range of Requirements..............................................................................................2.5-1

    2.5.1.2 Testing at Lower Levels of Assembly ................................................................................2.5-3

    2.5.1.3 Basis of the Tests...............................................................................................................2.5-3

    2.5.1.4 Safety and Controls............................................................................................................2.5-4

    2.5.2 Emission Requirements .....................................................................................................2.5-4

    2.5.2.1 Conducted Emission Limits................................................................................................2.5-4

    2.5.2.2 Radiated Emission Limits...................................................................................................2.5-5

    2.5.2.3 Acceptance Requirements.................................................................................................2.5-7

    2.5.3 Susceptibility Requirements...............................................................................................2.5-7

    2.5.3.1 Conducted Susceptibility Requirements ............................................................................2.5-7

    2.5.3.2 Radiated Susceptibility Requirements ...............................................................................2.5-9

    2.5.3.3 Acceptance Requirements...............................................................................................2.5-11

    2.5.4 Magnetic Properties .........................................................................................................2.5-12

    2.5.4.1 Initial Perm Test ...............................................................................................................2.5-12

    2.5.4.2 Perm Levels After Exposures to Magnetic Field..............................................................2.5-12

    2.5.4.3 Perm Levels After Exposures to Deperm Test.................................................................2.5-12

    2.5.4.4 Induced Magnetic Field Measurements...........................................................................2.5-12

    2.5.4.5 Stray Magnetic Field Measurements ...............................................................................2.5-12

    2.5.4.6 Subsystem Requirements................................................................................................2.5-12

    2.5.4.7 Acceptance Requirements...............................................................................................2.5-122.5.4.8 Notes on Magnetics Terminology and Units Used in GEVS............................................2.5-13

    SECTION 2.6 - THERMAL

    2.6 VACUUM, THERMAL, AND HUMIDITY VERIFICATION REQUIREMENTS....................2.6-1

    2.6.1 Summary of Requirements ................................................................................................2.6-1

    2.6.2 Thermal-Vacuum Qualification...........................................................................................2.6-1

    2.6.2.1 Applicability ........................................................................................................................2.6-4

  • 8/6/2019 GEVS_GSFC-STD-7000 Foarte Tare Carte

    6/151

    Paragraph Page

    vi

    2.6.2.2 Special Considerations ......................................................................................................2.6-4

    2.6.2.3 Level of Testing..................................................................................................................2.6-6

    2.6.2.4 Test Parameters.................................................................................................................2.6-6

    2.6.2.5 Test Setup........................................................................................................................2.6-10

    2.6.2.6 Demonstration..................................................................................................................2.6-10

    2.6.2.7 Special Tests....................................................................................................................2.6-11

    2.6.2.8 Failure-Free-Performance................................................................................................2.6-12

    2.6.3 Thermal Balance Qualifications .......................................................................................2.6-12

    2.6.3.1 Alternative Methods .........................................................................................................2.6-13

    2.6.3.2 Use of a Thermal Analytical Model ..................................................................................2.6-13

    2.6.3.3 Method of Thermal Simulation.........................................................................................2.6-13

    2.6.3.4 Internal Power ..................................................................................................................2.6-16

    2.6.3.5 Special Considerations ....................................................................................................2.6-16

    2.6.3.6 Demonstration..................................................................................................................2.6-16

    2.6.3.7 Acceptance Requirements...............................................................................................2.6-16

    2.6.4 Temperature-Humidity Verification ..................................................................................2.6-17

    2.6.4.1 Temperature-Humidity Verification: Manned Spaces ......................................................2.6-17

    2.6.4.1.1 Applicability ......................................................................................................................2.6-172.6.4.1.2 Demonstration..................................................................................................................2.6-17

    2.6.4.2 Temperature-Humidity Verification: Descent and Landing ..............................................2.6-17

    2.6.4.2.1 Special Considerations ....................................................................................................2.6-17

    2.6.4.2.2 Demonstration..................................................................................................................2.6-17

    2.6.4.2.3 Acceptance Requirements...............................................................................................2.6-17

    2.6.4.3 Temperature-Humidity: Transportation and Storage .......................................................2.6-18

    2.6.4.3.1 Applicability ......................................................................................................................2.6-18

    2.6.4.3.2 Demonstration..................................................................................................................2.6-18

    2.6.4.3.3 Acceptance Requirements...............................................................................................2.6-18

    2.6.5 Leakage (Integrity Verification) ........................................................................................2.6-18

    2.6.5.1 Levels of Assembly ..........................................................................................................2.6-18

    2.6.5.2 Demonstration..................................................................................................................2.6-18

    2.6.5.3 Acceptance Requirements...............................................................................................2.6-19

    SECTION 2.7 - CONTAMINATION CONTROL

    2.7 CONTAMINATION CONTROL PROGRAM....................................................................... 2.7-1

    2.7.1 Applicability ........................................................................................................................2.7-1

    2.7.2 Summary of Verification Process.......................................................................................2.7-1

    2.7.3 Contamination Sensitivity...................................................................................................2.7-1

    2.7.4 Contamination Allowance...................................................................................................2.7-2

    2.7.5 Contamination Budget........................................................................................................2.7-2

    2.7.6 Contamination Control Plan ...............................................................................................2.7-2

    2.7.7 Other Considerations .........................................................................................................2.7-2

    SECTION 2.8 - END-TO-END TESTING

    2.8 END-TO-END COMPATIBILITY TESTS AND SIMULATIONS .........................................2.8-1

    2.8.1 Compatibility Tests.............................................................................................................2.8-1

    2.8.2 Mission Simulations ...........................................................................................................2.8-1

  • 8/6/2019 GEVS_GSFC-STD-7000 Foarte Tare Carte

    7/151

    Page

    vii

    Appendix A

    General Information ...................................................................................................A-1 - A-14

    Tables

    Table

    2.2-1 Flight System Hardware Levels of Assembly.....................................................................2.2-3

    2.2-2 Test Factors/Durations.......................................................................................................2.2-5

    2.2-3 Flight Hardware Design/Analysis Factors of Safety Applied to Limit Loads..................... .2.2-6

    2.4-1 Structural and Mechanical Verification Test Requirements...............................................2.4-2

    2.4-2 Minimum Probability-Level Requirements for Flight Limit (maximum expected) Level .....2.4-3

    2.4-3 Generalized Random Vibration Test Levels, Components.(STS or ELV) .......................2.4-18

    2.4-4 Component Minimum Workmanship Random Vibration Test Levels ..............................2.4-19

    2.5-1 EMC Requirements per Level of Assembly .......................................................................2.5-2

    2.5-2 Frequency Range and Modulation Associated With Orbiter Transmitters ......................2.5-11

    2.6-1 Vacuum, Thermal, and Humidity Requirements ................................................................2.6-2

    A-1 Acoustic Fill-Factor, 3 meter Payload Fairing .......................................................................A-2

    FIGURES

    Figure

    2.1-1 Environmental Test Matrix .................................................................................................2.1-5

    2.1-2a Verification Test Report......................................................................................................2.1-6

    2.1-2b Verification Test Report (continued) ..................................................................................2.1-7

    2.4-1 Shock Response Level (SRS) for Assessing Component Test Requirements ............2.4-26

    2.5-1 Narrowband Conducted Emission Limits on Payload Power Leads................................2.5-15

    2.5-1a Common Mode Conducted Emission Limits on Primary Power Lines ............................2.5-15

    2.5-2 Broadband Conducted Emission Limits on Payload Power Leads..................................2.5-16

    2.5-3 Limit Envelope of Cargo-Generated Transients (Line to Line) on DC Power Busses

    for Normal Electrical System............................................................................................2.5-16

    2.5-4 Orbiter DC Power Line Impedance ..................................................................................2.5-17

  • 8/6/2019 GEVS_GSFC-STD-7000 Foarte Tare Carte

    8/151

    Figure Page

    viii

    2.5-5 Network Schematic for Simulating Impedance of Orbiter Power System........................2.5-17

    2.5-6 Limits of Payload-Produced Spikes on Orbiter AC Power Leads....................................2.5-18

    2.5-7 Deleted

    2.5-8 Limits of Radiated AC Magnetic Field at 1 Meter from Orbiter Payload ..........................2.5-18

    2.5-9 Unintentional Radiated Narrowband Limits for Electric Field Emission Produced by

    Payloads and Payload Subsystems.................................................................................2.5-19

    2.5-9a Allowable Unintentional Radiated Narrowband Emissions Limits in Orbiter

    Cargo Bay ........................................................................................................................2.5-19

    2.5-10 Unintentional Radiated Broadband Limits for Electric Field Emissions Produced by

    Payloads and Payload Subsystems.................................................................................2.5-20

    2.5-11 Allowable Intentional Field Strength in Orbiter Cargo Bay...............................................2.5-20

    2.5-12a Transient Voltage on the AFT Payload B and C DC Buses Produced by Operation

    of the Hydraulic Circulation Pump....................................................................................2.5-21

    2.5-12b Transient Voltage on the Primary Payload Bus, Auxiliary Payload A, Auxiliary

    Payload B, and the Cabin Payload Bus at the Cargo Element Interface Produced

    by Operation of the Hydraulic Circulation Pump..............................................................2.5-21

    2.5-13 Envelope of Spikes on the Orbiter AC Power Bus...........................................................2.5-22

    2.5-14a Maximum Field Intensities on Payload Envelope Produced by Orbiter Transmitters......2.5-22

    2.5-14b S-Band FM Transmitter, Upper HEMI Antenna, Maximum Field Intensities ...................2.5-23

    2.5-14c S-Band Payload Interrogator, Maximum Field Intensities................................................2.5-24

    2.5-14d S-Band Network Transponder, Upper Quad Antennas, Maximum Field Intensities .......2.5-25

    2.5-14e S-Band Network Transponder, Upper Quad Antennas, Beam Configuration .................2.5-26

    2.5-15 Orbiter-Produced Radiated Narrowband Emissions in Payload Bay...............................2.5-27

    2.5-16 Orbiter-Produced Radiated Broadband Emissions in Payload Bay.................................2.5-27

    2.6-1 Section 2.6 Thermal Requirements ...................................................................................2.6-3

    2.6-2 Qualification (Protoflight or Prototype) and Flight Acceptance Thermal-Vacuum

    Temperatures.....................................................................................................................2.6-5

    2.6-3 Temperature-Humidity Profile for Descent and Landing Demonstration.........................2.6-12

  • 8/6/2019 GEVS_GSFC-STD-7000 Foarte Tare Carte

    9/151

    Figure Page

    ix

    A-1 Cylindrical Payload in Fairing Acoustic Fill-Factor................................................................A-1

    A-2 Acoustic Fill-Factor for Various Size Payloads in a 3 Meter Diameter Payload Fairing.......A-3

    A-3 Determination of Qualification and Acceptance Random Vibration Test Levels ..................A-4

    A-4 Shock Environment Produced by Linear Pyrotechnic Devices.............................................A-7

    A-5 Shock Environment Produced by Separation Nuts and Explosive Bolts ..............................A-8

    A-6 Shock Environment Produced by Pin-Pullers and Pin-Pushers ...........................................A-9

    A-7 Shock Environment Produced by Bolt-Cutters, Pin-Cutters, and Cable-Cutters............... A-10

    A-8 Attenuation of Constant Velocity Line ................................................................................ A-11

    A-9 Peak Pyrotechnic Shock Response vs Distance ............................................................... A-12

    A-10 Shock Attenuation Example............................................................................................... A-13

    A-11 Reduction of Pyrotechnic Shock Response due to Intervening Structure......................... A-14

  • 8/6/2019 GEVS_GSFC-STD-7000 Foarte Tare Carte

    10/151

    SECTION l

    GENERAL INFORMATION

  • 8/6/2019 GEVS_GSFC-STD-7000 Foarte Tare Carte

    11/151

    GENERAL INFORMATION ________________________________________GENERAL INFORMATION

    1-1

    1.1 PURPOSE

    This standard provides requirements and guidelines for environmental verification programs

    for GSFC payloads, subsystems and components and describes methods for implementing

    those requirements. It contains a baseline for demonstrating by test or analysis the

    satisfactory performance of hardware in the expected mission environments, and thatminimum workmanship standards have been met. It elaborates on those requirements,

    gives guideline test levels, provides guidance in the choice of test options, and describes

    acceptable test and analytical methods for implementing the requirements.

    This standard shall be used by GSFC projects and contractors. This standard shall be

    tailored to create a project specific verification plan and verification specification as

    discussed in section 2.1. GSFC projects must select from the options to fulfill the specific

    payload (spacecraft) requirements in accordance with the launch vehicle to be used, Space

    Transportation System (STS), Atlas, Delta, Pegasus, Titan, etc., or to cover other mission-

    specific considerations. Most of the verification program is generally the same for STS and

    the expendable launch vehicles (ELV) payloads (spacecraft); the differences are noted in

    the text and the tables.

    1.2 APPLICABILITY AND LIMITATIONS

    This standard applies to GSFC hardware and associated software that is to be launched on

    either the STS or on an ELV. Hardware launched by balloons and sounding rockets is not

    included. The specification applies to the following:

    a. All space flight hardware, including interface hardware, that is developed as part of a

    payload managed by GSFC, whether developed by (1) GSFC or any of its

    contractors, (2) another NASA center, or (3) an independent agency; and

    b. All space flight hardware, including interface hardware that is developed by GSFC or

    any of its contractors and that is provided to another NASA installation or independent

    agency as part of a payload that is not managed by GSFC.

    The provisions herein are generally limited to the verification of STS or ELV payloads and to

    those activities (with emphasis on the environmental verification program) that are closely

    associated with such verification, such as workmanship and functional testing. If the

    payload is to be serviced or recovered by the STS, then all STS verification and safety

    requirements apply.

    The standard is written in accordance with the current GSFC practice of using a single

    protoflight payload for both qualification testing and space flight (see definition of hardware,1.8). The protoflight verification program, therefore, is given as the nominal test program.

    1.3 THE GSFC VERIFICATION APPROACH

    Goddard Space Flight Center endorses the full systems verification approach in which the

    entire payload is tested or verified under conditions that simulate the flight operations and

    flight environment as realistically as possible. The standard is written in accordance with

    that view. However, it is recognized that there may be unavoidable exceptions, or conditions

  • 8/6/2019 GEVS_GSFC-STD-7000 Foarte Tare Carte

    12/151

    GENERAL INFORMATION ________________________________________GENERAL INFORMATION

    1-2

    which make it preferable to perform the verification activities at lower levels of assembly.

    For example, testing at lower levels of assembly may be necessary to produce sufficient

    environmentally induced stresses to uncover design and workmanship flaws. These test

    requirements should be tailored for each specific space program. For some projects,

    tailoring might relax the requirements in this standard; however, for other projects the

    requirements may be made more stringent to demonstrate more robustness or greater

    confidence in the system performance.

    Since testing at the component (or unit) level, or lower level of assembly for large

    components, often becomes a primary part of the verification program, all components

    should be operating and monitored during all environmental tests if practicable.

    Environmental verification of hardware is only a portion of the total assurance effort at GSFC

    that establishes confidence that a payload will function correctly and fly a successful

    mission. The environmental test program provides confidence that the design will perform

    when subjected to environments more severe than expected during the mission, and

    provides environmental stress screening to uncover workmanship defects.

    The total verification process also includes the development of models representing the

    hardware, tests to verify the adequacy of the models, analyses, alignments, calibrations,functional/performance tests to verify proper operation, and finally end-to-end tests and

    simulations to show that the total system will perform as specified.

    Other tests not included herein may be performed as required by the project. The level,

    procedure, and decision criteria for performing any such additional tests shall be included in

    the system verification plan and system verification specification (section 2.1).

    1.4 OTHER ASSURANCE REQUIREMENTS

    In addition to the verification program, the assurance effort include parts and materials

    selection and control, reliability assessment, quality assurance, software assurance, design

    reviews, and system safety.

    1.5 RESPONSIBILITY FOR ADMINISTRATION

    The responsibility and authority for decisions in applying the requirements of this standard

    rest with the project manager. The general/environmental requirements are intended for use

    by the flight project managers, assisted by the systems assurance managers, and systems

    engineering in developing project-unique performance verification requirements, plans, and

    specifications that are consistent with current NASA program/project planning.

    The requirements thus derived and deviations from the requirements of this document are

    subject to review and approval by the GSFC Office of Mission Success.

    1.6 GEVS CONFIGURATION CONTROL AND DISTRIBUTION

    This document is controlled and maintained by the GSFC Office of Mission Success, and is

    available through the Goddard Document Management System (GDMS).

  • 8/6/2019 GEVS_GSFC-STD-7000 Foarte Tare Carte

    13/151

    GENERAL INFORMATION ________________________________________GENERAL INFORMATION

    1-3

    1.7 APPLICABLE DOCUMENTS

    The following documents may be needed in formulating the environmental test program.

    The user must ensure that the latest versions are procured and that the most recent

    changes and additions are included.

    1.7.1 Safety Requirements - NSTS 1700.7, Safety Policy and Requirements for Payloads usingthe NSTS, states that "the safety of any hazardous payload safety-critical equipment shall

    be satisfactorily verified." Because testing is one of the acceptable methods for verifying

    safety compliance, the environmental test program may be influenced by safety

    considerations.

    1.7.2 NSTS Interface Requirements - Portions of ICD 2-19001, Shuttle Orbiter/Cargo Standard

    Interfaces (Attachment 1 to NSTS 07700, Vol. XIV) have been incorporated herein primarily

    to make up part of the electromagnetic compatibility (EMC) provisions. ICD 2-19001 should

    also be consulted as indicated for implementing some of the other sections. Similarly, many

    of the provisions of NSTS 14046, Payload Interface Verification Requirements have been

    incorporated in this specification. STS users should, however, refer to that document to

    ensure full compliance.

    1.7.3 ELV Payload User Manuals - The most recent version of the launch vehicle user manual

    and requirements are applicable in accordance with the launch vehicle to be used by the

    project and should be acquired from the service provider.

    1.7.4 Fracture Control and Stress Corrosion - NSTS 1700.7, above, states the policy on fracture

    control for the STS. MSFC-STD-3029, provides guidelines for the selection of metallic

    materials. NASA-STD-5003 Fracture Control Requirements for Payloads using the Space

    Shuttle (1.7.7.h), and MSFC-STD-1249, Standard NDE Guidelines and Requirements for

    Fracture Control Programs (1.7.9.c) provide additional requirements.

    1.7.5 Spacecraft Tracking and Data Network Simulation - STDN No. 101.6, Portable Simulation

    System and Simulations Operation Center Guide for TDRSS & GSTDN, describes the

    Spacecraft Tracking and Data Network (STDN) and the Tracking and Data Relay Satellite(TDRS)/Ground STDN network simulation programs, and the Simulations Operations Center

    (SOC). It also discusses end-to-end simulation techniques. STDN No. 408, TDRS and

    GSTDN Compatibility Test Van Functional Description and Capabilities, describes the

    equipment and the compatibility test system.

    1.7.6 Deep Space Network (DSN) Simulation - The Deep Space Network/Flight Project Interface

    Design Handbook, 8l0-5, Jet Propulsion Laboratory, California Institute of Technology, Vol. I,

    Module TSS-10, describes existing payload (spacecraft) telemetry and command simulation

    capability. Vol. II describes proposed DSN capability.

    1.7.7 NASA Standards The following standards provide supporting information:

    a. NASA-STD 7002, Payload Test Requirements

    b. NASA-STD-7001, Payload Vibroacoustic Test Criteria

    c. NASA-STD-7003, Pyroshock Test Criteria

    d. NASA-HDBK-7004, Force Limited Vibration Testing

    e. NASA-HDBK-7005, Dynamic Environmental Criteria

  • 8/6/2019 GEVS_GSFC-STD-7000 Foarte Tare Carte

    14/151

    GENERAL INFORMATION ________________________________________GENERAL INFORMATION

    1-4

    f. NASA-STD-5001, Structural Design and Test Factors of Safety for Space Flight

    Hardware

    g. NASA-STD-5002, Load Analyses of Spacecraft and Payloads

    h. NASA-STD-5003, Fracture Control Requirements for Payloads using the SpaceShuttle

    i. NASA-STD-5007, General Fracture Control Requirements for Manned Spaceflight

    Systems

    l.7.8 Military Standards for EMC Testing - Pertinent sections of the following standards are

    needed to conduct the EMC tests:

    a. MIL-STD-461C, Electromagnetic Interference Characteristics Requirements for

    Equipment.

    b. MIL-STD-462, Electromagnetic Interference Characteristics, Measurement of, as

    amended by Notice l.

    c. MIL-STD-463A, Definitions and Systems of Units, Electromagnetic Interference and

    Electromagnetic Compatibility Technology.

    1.7.9 Military Standards for Non-Destructive Evaluation

    a. MIL-HDBK-6870, Inspection Program Requirements, Non-Destructive Testing for

    Aircraft and Missile Materials and Parts.

    b. NAS-410, Certification and Qualification of Nondestructive Test Personnel.

    c. MSFC-STD-1249, Standard NDE Guidelines and Requirements for Fracture ControlPrograms.

    d. MIL-HDBK-728, Nondestructive Testing.

    1.8 DEFINITIONS

    The following definitions apply within the context of this specification:

    Acceptance Tests: The verification process that demonstrates that hardware is acceptable

    for flight. It also serves as a quality control screen to detect deficiencies and, normally, to

    provide the basis for delivery of an item under terms of a contract.

    Assembly: See Level of Assembly.

    Component: See Level of Assembly.

    Configuration: The functional and physical characteristics of the payload and all its integral

    parts, assemblies and systems that are capable of fulfilling the fit, form and functional

    requirements defined by performance specifications and engineering drawings.

  • 8/6/2019 GEVS_GSFC-STD-7000 Foarte Tare Carte

    15/151

    GENERAL INFORMATION ________________________________________GENERAL INFORMATION

    1-5

    Contamination: The presence of materials of molecular or particulate nature which degrade

    the performance of hardware.

    Design Qualification Tests: Tests intended to demonstrate that the test item will function

    within performance specifications under simulated conditions more severe than those

    expected from ground handling, launch, and orbital operations. Their purpose is to uncover

    deficiencies in design and method of manufacture. They are not intended to exceed designsafety margins or to introduce unrealistic modes of failure. The design qualification tests

    may be to either prototype or protoflight test levels.

    Design Specification: Generic designation for a specification that describes functional and

    physical requirements for an article, usually at the component level or higher levels of

    assembly. In its initial form, the design specification is a statement of functional

    requirements with only general coverage of physical and test requirements. The design

    specification evolves through the project life cycle to reflect progressive refinements in

    performance, design, configuration, and test requirements. In many projects the end-item

    specifications serve all the purposes of design specifications for the contract end-items.

    Design specifications provide the basis for technical and engineering management control.

    Electromagnetic Compatibility (EMC): The condition that prevails when various electronicdevices are performing their functions according to design in a common electromagnetic

    environment.

    Electromagnetic Interference (EMI): Electromagnetic energy which interrupts, obstructs, or

    otherwise degrades or limits the effective performance of electrical equipment.

    Electromagnetic Susceptibility: Undesired response by a component, subsystem, or system

    to conducted or radiated electromagnetic emissions.

    End-to-End Tests: Tests performed on the integrated ground and flight system, including all

    elements of the payload, its control, stimulation, communications, and data processing to

    demonstrate that the entire system is operating in a manner to fulfill all mission requirements

    and objectives.

    Failure: A departure from specification that is discovered in the functioning or operation of

    the hardware or software. See nonconformance.

    Flight Acceptance: See Acceptance Tests.

    Fracture Control Program: A systematic project activity to ensure that a payload intended

    for flight has sufficient structural integrity as to present no critical or catastrophic hazard.

    Also to ensure quality of performance in the structural area for any payload (spacecraft)

    project. Central to the program is fracture control analysis, which includes the concepts of

    fail-safe and safe-life, defined as follows:

    a. Fail-safe: Ensures that a structural element, because of structural redundancy, will

    not cause collapse of the remaining structure or have any detrimental effects on

    mission performance.

    b. Safe-life: Ensures that the largest flaw that could remain undetected after non-

    destructive examination would not grow to failure during the mission.

    Functional Tests: The operation of a unit in accordance with a defined operational

    procedure to determine whether performance is within the specified requirements.

  • 8/6/2019 GEVS_GSFC-STD-7000 Foarte Tare Carte

    16/151

    GENERAL INFORMATION ________________________________________GENERAL INFORMATION

    1-6

    Hardware: As used in this document, there are two major categories of hardware as follows:

    a. Prototype Hardware: Hardware of a new design; it is subject to a design qualification

    test program; it is not intended for flight.

    b. Flight Hardware: Hardware to be used operationally in space. It includes the followingsubsets:

    (1) Protoflight Hardware: Flight hardware of a new design; it is subject to a

    qualification test program that combines elements of prototype and flight

    acceptance verification; that is, the application of design qualification test levels

    and flight acceptance test durations.

    (2) Follow-On Hardware: Flight hardware built in accordance with a design that

    has been qualified either as prototype or as protoflight hardware; follow-on

    hardware is subject to a flight acceptance test program.

    (3) Spare Hardware: Hardware the design of which has been proven in a design

    qualification test program; it is subject to a flight acceptance test program andis used to replace flight hardware that is no longer acceptable for flight.

    (4) Reflight Hardware: Flight hardware that has been used operationally in space

    and is to be reused in the same way; the verification program to which it is

    subject depends on its past performance, current status, and the upcoming

    mission.

    Level of Assembly: The environmental test requirements of GEVS generally start at the

    component or unit level assembly and continue hardware/software build through the system

    level (referred to in GEVS as the payload or spacecraft level). The assurance program

    includes the part level. Verification testing may also include testing at the assembly and

    subassembly levels of assembly; for test record keeping these levels are combined into a

    "subassembly" level. The verification program continues through launch, and on-orbitperformance. The following levels of assembly are used for describing test and analysis

    configurations:

    Assembly: A functional subdivision of a component consisting of parts or

    subassemblies that perform functions necessary for the operation of the component

    as a whole. Examples are a power amplifier and gyroscope.

    Component: A functional subdivision of a subsystem and generally a self-contained

    combination of items performing a function necessary for the subsystem's operation.

    Examples are electronic box, transmitter, gyro package, actuator, motor, battery. For

    the purposes of this document, "component" and "unit" are used interchangeably.

    Instrument: A spacecraft subsystem consisting of sensors and associated hardware

    for making measurements or observations in space. For the purposes of this

    document, an instrument is considered a subsystem (of the spacecraft).

    Module: A major subdivision of the payload that is viewed as a physical and

    functional entity for the purposes of analysis, manufacturing, testing, and

    recordkeeping. Examples include spacecraft bus, science payload, and upper stage

    vehicle.

  • 8/6/2019 GEVS_GSFC-STD-7000 Foarte Tare Carte

    17/151

    GENERAL INFORMATION ________________________________________GENERAL INFORMATION

    1-7

    Part: A hardware element that is not normally subject to further subdivision or

    disassembly without destruction of design use. Examples include resistor, integrated

    circuit, relay, connector, bolt, and gaskets.

    Payload: An integrated assemblage of modules, subsystems, etc., designed to

    perform a specified mission in space. For the purposes of this document, "payload"

    and "spacecraft" are used interchangeably. Other terms used to designate this level ofassembly are Laboratory, Observatory, Satellite and System Segment.

    Spacecraft: See Payload. Other terms used to designate this level of assembly are

    Laboratory, Observatory, and satellite.

    Section: A structurally integrated set of components and integrating hardware that

    form a subdivision of a subsystem, module, etc. A section forms a testable level of

    assembly, such as components/units mounted into a structural mounting tray or

    panel-like assembly, or components that are stacked.

    Subassembly: A subdivision of an assembly. Examples are wire harness and loaded

    printed circuit boards.

    Subsystem: A functional subdivision of a payload consisting of two or more

    components. Examples are structural, attitude control, electrical power, and

    communication subsystems. Also included as subsystems of the payload are the

    science instruments or experiments.

    Unit: A functional subdivision of a subsystem, or instrument, and generally a self-

    contained combination of items performing a function necessary for the subsystem's

    operation. Examples are electronic box, transmitter, gyro package, actuator, motor,

    battery. For the purposes of this document, "component" and "unit" are used

    interchangeably.

    Limit Level: The maximum expected flight level (consistent with the minimum probabilitylevels of Table 2.4-2).

    Margin: The amount by which hardware capability exceeds requirements.

    Module: See Level of Assembly.

    Nonconformance: A condition of any hardware, software, material, or service in which one

    or more characteristics do not conform to specified requirements.

    Offgassing: The emanation of volatile matter of any kind from materials into a manned

    pressurized volume.

    Outgassing: The emanation of volatile materials under vacuum conditions resulting in a

    mass loss and/or material condensation on nearby surfaces.

    Part: See Level of Assembly.

    Payload: See Level of Assembly.

    Performance Verification: Determination by test, analysis, or a combination of the two that

    the payload element can operate as intended in a particular mission; this includes being

  • 8/6/2019 GEVS_GSFC-STD-7000 Foarte Tare Carte

    18/151

    GENERAL INFORMATION ________________________________________GENERAL INFORMATION

    1-8

    satisfied that the design of the payload or element has been qualified and that the particular

    item has been accepted as true to the design and ready for flight operations.

    Protoflight Testing: See Hardware.

    Prototype Testing: See Hardware.

    Qualification: See Design Qualification Tests.

    Redundancy (of design): The use of more than one independent means of accomplishing a

    given function.

    Section: See Level of Assembly.

    Spacecraft: See Level of Assembly.

    Subassembly: See Level of Assembly.

    Subsystem: See Level of Assembly.

    Temperature Cycle: A transition from some initial temperature condition to temperature

    stabilization at one extreme and then to temperature stabilization at the opposite extreme

    and returning to the initial temperature condition.

    Temperature Stabilization: The condition that exists when the rate of change of

    temperatures has decreased to the point where the test item may be expected to remain

    within the specified test tolerance for the necessary duration or where further change is

    considered acceptable.

    Thermal Balance Test: A test conducted to verify the adequacy of the thermal model, the

    adequacy of the thermal design, and the capability of the thermal control system to maintain

    thermal conditions within established mission limits.

    Thermal-Vacuum Test: A test conducted to demonstrate the capability of the test item to

    operate satisfactorily in vacuum at temperatures based on those expected for the mission.

    The test, including the gradient shifts induced by cycling between temperature extremes,

    can also uncover latent defects in design, parts, and workmanship.

    Unit: See Level of Assembly.

    Vibroacoustics: An environment induced by high-intensity acoustic noise associated with

    various segments of the flight profile; it manifests itself throughout the payload in the form of

    directly transmitted acoustic excitation and as structure-borne random vibration.

    Workmanship Tests: Tests performed during the environmental verification program toverify adequate workmanship in the construction of a test item. It is often necessary to

    impose stressses beyond those predicted for the mission in order to uncover defects. Thus

    random vibration tests are conducted specifically to detect bad solder joints, loose or

    missing fasteners, improperly mounted parts, etc. Cycling between temperature extremes

    during thermal-vacuum testing and the presence of electromagnetic interference during

    EMC testing can also reveal the lack of proper construction and adequate workmanship.

  • 8/6/2019 GEVS_GSFC-STD-7000 Foarte Tare Carte

    19/151

    GENERAL INFORMATION ________________________________________GENERAL INFORMATION

    1-9

    1.9 CRITERIA FOR UNSATISFACTORY PERFORMANCE

    Deterioration or any change in performance of any test item that does or could in any

    manner prevent the item from meeting its functional, operational, or design requirements

    throughout its mission shall be reason to consider the test item as having failed. Other

    factors concerning failure are considered in the following paragraphs.

    1.9.1 Failure Occurrence

    When a failure (non-conformance or trend indicating that an out of spec condition will result)

    occurs, a determination shall be made as to the feasibility and value of continuing the test to

    its specified conclusion. If corrective action is taken, the test shall be repeated to the extent

    necessary to demonstrate that the test item's performance is satisfactory.

    1.9.2 Failures with Retroactive Effects

    If corrective action taken as a result of failure, e.g. redesign of a component, affects the

    validity of previously completed tests, prior tests shall be repeated to the extent necessary to

    demonstrate satisfactory performance.

    1.9.3 Failure Reporting

    Every failure shall be recorded and reported in accordance with the failure reporting

    provisions of the project.

    1.9.4 Wear Out

    If during a test sequence a test item is operated in excess of design life and wears out or

    becomes unsuitable for further testing from causes other than deficiencies, a spare may be

    substituted. If, however, the substitution affects the significance of test results, the test

    during which the item was replaced and any previously completed tests that are affected

    shall be repeated to the extent necessary to demonstrate satisfactory performance.

    1.10 TEST SAFETY RESPONSIBILITIES

    The following paragraphs define the responsibilities shared by the space project and facility

    management for planning and enforcing industrial safety measures taken during testing for

    the protection of personnel, the payload, and the test facility.

    1.10.1 Operations Hazard Analysis, Responsibilities For

    It shall be the joint responsibility of the test facility manager and the project manager to

    ensure that environmental tests and associated operations present no unacceptable hazard

    to the test item, facilities, or personnel. A test operations hazard analysis (OHA) shall be

    performed by the facility and project personnel to consider and evaluate all hazardspresented by the interaction of the payload and the facility for each environmental test. All

    hazards discovered in the OHA shall be tracked to an agreed-upon resolution. The safety

    measures to be taken as a result of the OHA, as well as the safety measures between tests,

    shall be specified as requirements in the verification plan and verification specification. (sec.

    2.1.1)

  • 8/6/2019 GEVS_GSFC-STD-7000 Foarte Tare Carte

    20/151

    GENERAL INFORMATION ________________________________________GENERAL INFORMATION

    1-10

    1.10.2 Treatment of Hazards

    As hazards are discovered, a considered attempt shall be made to eliminate them. This

    may be accomplished by redesign, controlling energy sources, revising the test, or by some

    other method. If the hazard cannot be eliminated, automatic safety controls shall be applied,

    for example: pressure relief devices, electrical circuit protection devices, or mechanical

    interlocks. If that is not possible or is too costly, warning devices shall be considered. Ifnone of the foregoing methods are practicable, control procedures must be developed and

    applied. In practice, a combination of all four methods may be the best solution to the

    hazards posed by a complex system. Before any test begins, the project manager and test

    facility management shall agree on the hazard control method(s) that are to be used.

    1.10.3 Facility Safety

    The test facility manager shall verify that the test facility and normal operations present no

    unacceptable hazard to the test item, test and support equipment, or personnel. He shall

    ensure that facility personnel abide by all applicable regulations, observe all appropriate

    industrial safety measures, and follow all requirements for protective equipment. He shall

    ensure that all facility personnel are trained and qualified for their positions. Training shouldinclude the handling of emergencies by the simulation of emergency conditions. Analyses,

    tests, and inspections shall be performed to verify that the safety requirements are satisfied.

    The approach outlined in 1.11.2 shall be used to eliminate or control hazards.

    1.10.4 Safety Responsibilities During Tests

    The test facility manager shall appoint a safety officer to work closely with a safety officer

    designated by the space project. The facility designee shall ensure that the facility meets

    applicable Occupational Safety & Health Act (OSHA) and other requirements, that

    appropriate industrial safety measures are observed, and that protective equipment is

    provided for all personnel involved. The facility designee will ensure that facility personnel

    use the equipment provided and that the test operation does not present a hazard to thefacility. The project designee shall ensure that project personnel use the equipment

    provided and that the test operation does not present a hazard to the space hardware,

    equipment, or personnel.

    1.11 TESTING OF SPARE HARDWARE

    A supply of selected spares is often maintained in case of the failure of flight hardware. As a

    minimum, spares must undergo a verification program equal to that required for follow-on

    hardware. Therefore, special consideration must be given to spares as follows:

    a. Extent of Testing - The extent and type of testing shall be determined as part of theflight hardware test program. A spare unit may be used for qualification of the

    hardware by subjecting it to protoflight testing, and testing the flight hardware to

    acceptance levels.

    b. Spares From Failed Elements - If a flight element is replaced for reasons of failure

    and is then repaired and redesignated as a spare, appropriate retesting shall be

    conducted.

  • 8/6/2019 GEVS_GSFC-STD-7000 Foarte Tare Carte

    21/151

    GENERAL INFORMATION ________________________________________GENERAL INFORMATION

    1-11

    c. Caution on the Use of Spares - When the need for a spare arises, immediate

    analysis and review of the failed hardware must be made. If failure occurs in a

    hardware item of which there are others of identical design, the fault may be generic

    and may affect all hardware of that design.

    d. "One-Shot" Items - Some items may be degraded or expended during the integration

    and test period and replaced by spares. The spare that is used shall have met therequired quality control standards or auxiliary tests for such items and shall be of

    qualified design. Examples are pyrotechnic devices, yo-yo despin weights, and

    elements that absorb impact energy by plastic yielding. When the replacement entails

    procedures that could jeopardize mission success, the replacement procedure should

    be successfully demonstrated with the hardware in the same configuration that it will

    be in when final replacement is to be accomplished.

    1.12 TEST FACILITIES, CALIBRATION

    The facilities and fixtures used in conducting tests shall be capable of producing and

    maintaining the test conditions prescribed with the test specimen installed and operating or

    not operating, as required. In any major test, facility performance should be verified prior tothe test either by a review of its performance during a test that occurred a short time earlier

    or by conducting a test with a substitute test item. All equipment used for tests shall be in

    current calibration and so noted by tags and stickers.

    1.13 TEST CONDITION TOLERANCES

    In the absence of a rationale for other test condition tolerances, the following shall be used;

    the values include measurement uncertainties:

    Acoustics Overall Level:

    1 dB

    l/3 Octave Band Tolerance: Frequency (Hz) Tolerance (dB)

    f 40 +3, -6

    40< F < 3150 3

    f 3150 +3, -6

    Antenna Pattern Determination 2 dB

    Electromagnetic Compatibility

    Voltage Magnitude: 5% of the peak value

    Current Magnitude: 5% of the peak value

    RF Amplitudes: 2 dB

    Frequency: 2%

    Distance: 5% of specified distance or

    5 cm, whichever is greater

  • 8/6/2019 GEVS_GSFC-STD-7000 Foarte Tare Carte

    22/151

    GENERAL INFORMATION ________________________________________GENERAL INFORMATION

    1-12

    Humidity 5% RH

    Loads Steady-State (Acceleration): 5%

    Static: 5%

    Magnetic Properties

    Mapping Distance Measurement: 1 cm

    Displacement of assembly center of gravity (cg)

    from rotation axis: 5 cm

    Vertical displacement of single probe centerline

    from cg of assembly: 5 cm

    Mapping turntable angular displacement: 3 degrees

    Magnetic Field Strength: 1 nT

    Repeatability of magnetic measurements (short term): 5% or 2 nT,

    whichever is greater

    Demagnetizing and Magnetizing Field Level: 5% of nominal

    Mass Properties Weight: 0.2%

    Center of Gravity: 0.15cm ( 0.06 in.)

    Moments of Inertia: 1.5%

    Mechanical Shock Response Spectrum: +25%, -10%

    Time History: 10%

    Pressure Greater than 1.3 X 104 Pa

    (Greater than 100 mm Hg): 5%

    1.3 X l04 to 1.3 X l02 Pa

    (l00 mm Hg to 1 mm Hg): 10%

    1.3 X l02 to 1.3 X 101 Pa

    (1 mm Hg to 1 micron):

    25%

    Less than 1.3 X 101 Pa

    (less than 1 micron): 80%

    Temperature 2C

  • 8/6/2019 GEVS_GSFC-STD-7000 Foarte Tare Carte

    23/151

    GENERAL INFORMATION ________________________________________GENERAL INFORMATION

    1-13

    Vibration Sinusoidal: Amplitude 10%

    Frequency 2%

    Random: RMS level 10%

    Accel. Spectral Density 3 dB

  • 8/6/2019 GEVS_GSFC-STD-7000 Foarte Tare Carte

    24/151

    SECTION 2

    VERIFICATION PROGRAM

  • 8/6/2019 GEVS_GSFC-STD-7000 Foarte Tare Carte

    25/151

    SECTION 2.1

    SYSTEM PERFORMANCE VERIFICATION

  • 8/6/2019 GEVS_GSFC-STD-7000 Foarte Tare Carte

    26/151

    SYSTEM PERFORMANCE VERIFICATION SYSTEM PERFORMANCE VERIFICATION

    2.1- 1

    2.l SYSTEM PERFORMANCE VERIFICATION

    This section applies to all payloads (spacecraft), subsystems (including

    instruments), and components. The basic provisions apply to all flight hardware,

    and associated software, that will fly in the STS cargo bay and to spacecraft that willbe launched by expendable launch vehicles (ELVs).

    The GEVS, as its name implies, provides basic requirements and guidelines for an

    environmental verification program. This represents only a portion of the overall

    system verification and must be integrated into the total system program which

    verifies that the system will meet the mission requirements. A system performance

    verification program documenting the overall verification plan, implementation, and

    results is required which will provide traceability from mission specification

    requirements to launch and initial on-orbit capability. This will also provide the

    baseline for tracking on-orbit performance versus pre-launch capability.

    2.1.1 Documentation Requirements

    The following documents are required and shall be delivered and approved in

    accordance with the Contracts Schedule.

    2.1.1.1 System Performance Verification Plan

    A system performance verification plan shall be prepared defining the tasks and

    methods required to determine the ability of the system (or instrument) to meet each

    program-level performance requirement (structural, thermal, optical, electrical,

    guidance/control, RF/telemetry, science, mission operational, etc.) and to measure

    specification compliance. Limitations in the ability to verify any performance

    requirement shall be addressed, including the addition of supplemental tests and/oranalyses that will be performed and a risk assessment of the inability to verify the

    requirement.

    The plan shall address how compliance with each specification requirement will be

    verified. If verification relies on the results of measurements and/or analyses

    performed at lower (or other) levels of assembly, this dependence shall be

    described.

    For each analysis activity, the plan shall include objectives, a description of the

    mathematical model, assumptions on which the models will be based, required

    output, criteria for assessing the acceptability of the results, the interaction with

    related test activity, if any, and requirements for reports. Analysis results shall takeinto account tolerance build-ups in the parameters being used.

    2.1.1.1.1 Environmental Verification Plan

    An environmental verification plan shall be prepared, either as part of the System

    Verification Plan or as a separate document, that prescribes the tests and analyses

    that will collectively demonstrate that the hardware and software comply with the

    environmental verification requirements

  • 8/6/2019 GEVS_GSFC-STD-7000 Foarte Tare Carte

    27/151

    SYSTEM PERFORMANCE VERIFICATION SYSTEM PERFORMANCE VERIFICATION

    2.1- 2

    The environmental verification plan shall provide the overall approach to

    accomplishing the environmental verification program. For each test, it shall include

    the level of assembly, the configuration of the item, objectives, facilities,

    instrumentation, safety considerations, contamination control, test phases and

    profiles, necessary functional operations, personnel responsibilities, and

    requirement for procedures and reports. It shall also define a rationale for retestdetermination that does not invalidate previous verification activities. When

    appropriate, the interaction of the test and analysis activity shall be described.

    Limitations in the environmental verification program which preclude the verification

    by test of any system requirement shall be documented. Examples of limitations in

    the ability to demonstrate requirements include:

    Inability to deploy hardware in a 1-g environment.

    Facility limitations which do not allow testing at system level of assembly.

    Inability to perform certain tests because of contamination control

    requirements.

    Inability to perform powered-on testing because of voltage breakdown

    concerns.

    Alternative tests and analyses shall be evaluated and implemented as appropriate,

    and an assessment of program risk shall be included in the System Performance

    Verification Plan.

    2.1.1.2 System Performance Verification Matrix

    A System Performance Verification Matrix shall be prepared, and maintained, to

    show each specification requirement, the reference source (to the specificparagraph or line item), the method of compliance, applicable procedure references,

    results, report reference numbers, etc. This matrix shall be included in the system

    review data packages showing the current verification status as applicable

    2.1.1.2.1 Environmental Test Matrix

    As an adjunct to the environmental verification plan, an environmental test matrix

    shall be prepared that summarizes all tests that will be performed on each

    component, each subsystem, and the payload. The purpose is to provide a ready

    reference to the contents of the test program in order to prevent the deletion of a

    portion thereof without an alternative means of accomplishing the objectives; it has

    the additional purpose of ensuring that all flight hardware has been subjected toenvironmental exposures that are sufficient to demonstrate acceptable

    workmanship. In addition, the matrix shall provide traceability of the qualification

    heritage of hardware. All flight hardware, spares and prototypes (when appropriate)

    shall be included in the matrix. Details of each test shall be provided (e.g., number

    of thermal cycles, temperature extremes, vibration levels). It shall also relate the

    design environments to the test environments and to the anticipated mission

    environments. The matrix shall be prepared in conjunction with the initial

    environmental verification plan and shall be updated as changes occur.

  • 8/6/2019 GEVS_GSFC-STD-7000 Foarte Tare Carte

    28/151

    SYSTEM PERFORMANCE VERIFICATION SYSTEM PERFORMANCE VERIFICATION

    2.1- 3

    A sample test matrix is given in Figure 2.1-1. The electrical performance tests that

    are required to be performed before, during, and following the environmental

    verification test program are not shown in this sample matrix. Other performance

    tests, measurements, demonstrations, alignments, etc. (electrical, mechanical,

    optical, etc.), that must be performed to verify hardware/software requirements are

    also not included in this Environmental Test Matrix. However they shall be included

    in the System Performance Verification Plan.

    The test matrix does not have to conform to this format; any format that clearly

    displays the pertinent information is acceptable.

    A complementary matrix shall be kept showing the tests that have been performed

    on each component, subsystem, or payload (or applicable level of assembly). This

    should include tests performed on prototypes or engineering units used in the

    qualification program, and should indicate test results (pass/fail or malfunctions).

    2.1.1.3 Environmental Verification Specification

    An environmental verification specification shall be prepared that defines the specificenvironmental parameters that each hardware element is subjected to either by test

    or analysis in order to demonstrate its ability to meet the mission performance

    requirements. Such things as payload peculiarities and interaction with the launch

    vehicle (STS or ELV) shall be taken into account.

    2.1.1.4 Performance Verification Procedures

    For each verification test activity conducted at the component, subsystem, and

    payload levels (or other appropriate levels) of assembly, a verification procedure

    shall be prepared that describes the configuration of the test article, how each test

    activity contained in the verification plan and specification will be implemented.

    Test procedures shall contain details such as instrumentation monitoring, facility

    control sequences, test article functions, test parameters, pass/fail criteria, quality

    control checkpoints, data collection and reporting requirements. The procedures

    also shall address safety and contamination control provisions.

    2.1.1.5 Verification Reports

    After each component, subsystem, payload, etc., verification activity has been

    completed, a report shall be submitted in accordance with the Contract Schedule.

    For each environmental test activity, the report shall contain, as a minimum, the

    information in the sample test report contained in Figure 2.1-2a and 2.1-2b. Foreach analysis activity, the report shall describe the degree to which the objectives

    were accomplished, how well the mathematical model was validated by related test

    data, and other such significant results. In addition, as-run verification procedures

    and all test and analysis data shall be retained for review.

  • 8/6/2019 GEVS_GSFC-STD-7000 Foarte Tare Carte

    29/151

    SYSTEM PERFORMANCE VERIFICATION SYSTEM PERFORMANCE VERIFICATION

    2.1- 4

    2.1.1.6 System Performance Verification Report

    At the conclusion of the verification program, a final System Performance

    Verification Report shall be delivered comparing the hardware/software

    specifications with the final verified values (whether measured or computed). It is

    recommended that this report be subdivided by subsytem/instrument.

    The System Performance Verification Report shall be maintained "real-time"

    throughout the program summarizing the successful completion of verification

    activities, and showing that the applicable system performance specifications have

    been acceptably complied with prior to integration of hardware/software into the next

    higher level of assembly.

    The initial report shall be provided for the PDR. Current versions shall then be

    provided for review at major systems reviews.

    The final pre-launch System Verification Report shall be available for approval for

    the FRR (Flight Readiness Review).

    Following initial on-orbit checkout, the System Verification Report shall becompleted, and delivered in accordance with the contract schedule.

    2.1.1.7 Instrument Verification Documentation

    The documentation requirements of sections 2.1.1.1 through 2.1.1.6 also apply to

    instruments. Following integration of the instruments onto the spacecraft, the

    spacecraft System Verification Report will include the instrument information.

  • 8/6/2019 GEVS_GSFC-STD-7000 Foarte Tare Carte

    30/151

    SYSTEM PERFORMANCE VERIFICATION SYSTEM PERFORMANCE VERIFICATION

    2.1- 5

  • 8/6/2019 GEVS_GSFC-STD-7000 Foarte Tare Carte

    31/151

    SYSTEM PERFORMANCE VERIFICATION SYSTEM PERFORMANCE VERIFICATION

    2.1- 6

    Figure 2.1-2a Verification Test Report

  • 8/6/2019 GEVS_GSFC-STD-7000 Foarte Tare Carte

    32/151

    SYSTEM PERFORMANCE VERIFICATION SYSTEM PERFORMANCE VERIFICATION

    2.1- 7

    VERIFICATION TEST REPORT (Continued) Page_____of_____

    Date (add time

    for thermal and

    temperature tests)

    Note beginning and end of actual activity,

    deviations from the planned procedure, and

    discrepancies in test times or performance.

    (State if there were no deviations or discrepancies.)

    Malfunction Report

    Number and Date

    (if applicable)

    (use additional paper as required)

    The activities covered by these reports include tests and measurements performed for the purpose of verifying theflightworthiness of hardware at the component, subsystem, and payload levels of assembly. These reports shall also beprovided for such other activities as the project may designate.

    These reports shall be completed and transmitted to the GSFC Technical Officer or Contracting Officer (as appropriate)within 30 days after completion of an activity. Legible, reproducible, handwritten completed forms are acceptable.

    Material felt necessary to clarify this report may be attached. However, in general, test logs and data should be retainedby those responsible for the test item unless they are specifically requested.

    The forms shall be signed by the quality assurance representative and the person responsible for the test or hisdesignated representative; the signatures represent concurrence that the data is as accurate as possible given theconstraints of time imposed by quick-response reporting.

    This report does not replace the need for maintaining complete logs, records, etc.; it is intended to document theimplementation of the verification program and to provide a minimum amount of information as to the performance of thetest item.

    Figure 2.1-2b Verification Test Report (cont.)

  • 8/6/2019 GEVS_GSFC-STD-7000 Foarte Tare Carte

    33/151

    SECTION 2.2

    ENVIRONMENTAL VERIFICATION

  • 8/6/2019 GEVS_GSFC-STD-7000 Foarte Tare Carte

    34/151

    ENVIRONMENTAL VERIFICATION ENVIRONMENTAL VERIFICATION

    2.2- 1

    2.2 APPLICABILITY

    Sections 2.3 through 2.8 give the basic environmental verification program for verifyingpayloads, subsystems, and components as follows:

    2.3 Electrical Function & Performance

    2.4 Structural and Mechanical

    2.5 EMC

    2.6 Thermal

    2.7 Contamination Control

    2.8 End-to-End Testing (payloads/spacecraft)

    The verification program applies to payloads that will fly in the STS cargo bay and to

    spacecraft that will be launched by expendable launch vehicles (ELVs). Provisions that are

    specific to STS or ELV payloads are noted in the text and tables. For the purposes of this

    document, a spacecraft is considered a payload, and an instrument is considered to be asubsystem when determining the environmental verification requirements.

    The basic provisions are written assuming protoflight hardware. They are, in general, also

    applicable to prototype hardware. Acceptance requirements are also given for the flight

    acceptance of previously qualified hardware. This applies to follow-on hardware (multiple

    copies of the same item) developed for the program, or hardware (from another program)

    qualified by similarity.

    2.2.1 Test Sequence and Level of Assembly

    The verification activities herein are grouped by discipline; they are not in a recommended

    sequence of performance. No specific environmental test sequence is required, but the test

    program should be arranged in a way to best disclose problems and failures associated with

    the characteristics of the hardware and the mission objectives.

    In cases where the magnetic properties of the hardware need to be controlled, the dc

    magnetics testing should be performed after vibration testing. This provides an opportunity

    to correct for any magnetization of the flight hardware caused by fields associated with the

    vibration test equipment.

    Table 2.2-1 provides a hierarchy of levels of assembly for the flight hardware, with

    examples. These level designators are based on those used in the Space Systems

    Engineering Database developed by The Aerospace Corporation for the Air Force, and

    agreed to by NASA Headquarters, GSFC, and JPL.. The GEVS environmental test

    requirements generally start at the unit level and end at the system segment level.However, screening and life-tests often occur at lower levels, and overall system verification

    continues beyond the system segment level.

    2.2.2 Verification Program Tailoring

    The environmental test requirements are written assuming a low-risk program. The

    environmental program should be tailored to reflect the hardware classification, mission

    objectives, hardware characteristics such as physical size and complexity, and the level of

    risk accepted by the project. For example, the "failure-free-performance" requirement may

  • 8/6/2019 GEVS_GSFC-STD-7000 Foarte Tare Carte

    35/151

    ENVIRONMENTAL VERIFICATION ENVIRONMENTAL VERIFICATION

    2.2- 2

    be varied, with GSFC approval, from the baseline to reflect mission duration and risk

    acceptance. This document also assumes that the payload/spacecraft is of modular design

    and can be tested at the unit/component, subsystem/instrument, and system/spacecraft

    levels of assembly. Often this is not the case. The project must develop a verification

    program that satisfies the intent of the required verification program while taking into

    consideration the specific characteristics of the mission and the hardware. For example:

    A spacecraft subsystem, or instrument, may be a functional subdivision of the

    spacecraft, but it may be distributed throughout the spacecraft rather than being a

    physical entity. In this case, the environmental tests, and associated functional tests,

    must be performed at physical levels of assembly (component, section, module,

    system or instrument [refer to Appendix A - hardware level of assembly]) that are

    appropriate for the specific hardware. Performance tests and calibrations may still be

    performed on the functional subsystem or instrument.

    The physical size of the system may necessitate testing at other levels of assembly.

    Facility limitations may not allow certain environmental tests to be performed at the

    system level. In this case, testing should be performed at the highest practicable

    level. Also, for very large systems or subsystems/instruments, tests at additional

    levels of assembly may be added in order to adequately verify the hardware design,workmanship and/or performance.

    For small payloads, the subsystem level environmental tests may be skipped in favor

    of testing at the component and system/spacecraft levels. Similarly, for very small

    instruments the GSFC project may elect to not test all components in favor of testing

    at the instrument level. These decisions must be made carefully, especially regarding

    bypassing lower level testing for instruments, because of the increased risk to the

    program (schedule, cost, etc.) of finding problems late in the planned schedule.

    In some cases, because of the hardware configuration it may be reasonable to test

    more than one component at a time. The components may be stacked in their flight

    configuration, and may therefore be tested as a "section". Part of the decision

    process must consider the physical size and mass of the hardware. The test

    configuration must allow for adequate dynamic or thermal stress inputs to the

    hardware to uncover design errors and workmanship flaws.

    Some test requirements stated as subsystem/instrument requirements may be

    satisfied at a higher level of assembly if approved by the GSFC project. For example,

    externally induced mechanical shock test requirements may be satisfied at the system

    level by firing the environment-producing pyro. A simulation of this environment is

    difficult, especially for large subsystems or instruments.

    Aspects of the design and/or mission may negate certain test conditions to be

    imposed. For example, if the on-orbit temperature variations are small, less than 5C,

    then consideration should be given to waiving the thermal-vacuum cycling at thesystem, or instrument, level of assembly in favor of increasing the hot and cold dwell

    times.

    The same process must be applied when developing the test plan for an instrument. While

    testing is required at the instrument component and all-up instrument levels of assembly,

    additional test levels may be called for because of hardware complexity or physical size.

  • 8/6/2019 GEVS_GSFC-STD-7000 Foarte Tare Carte

    36/151

    ENVIRONMENTAL VERIFICATION ENVIRONMENTAL VERIFICATION

    2.2- 3

    Table 2.2-1

    Flight System Hardware

    Levels of Assembly

    .

    2.2.3 Qualification of Hardware by Similarity

    There are cases in which hardware qualified for one flight program is to be built and used on

    another program. Hardware that has been previously qualified may be considered qualifiedfor use on a new program by showing that the hardware is sufficiently similar to the originalhardware and that the previous qualification program has adequately enveloped the newmission environments. The details for performing this comparison should be defined by theproject but as a minimum the following areas should be reviewed and documented:

    (1) Design and test requirements must be shown to envelope the original requirements.This should include a review of the test configuration and of all waivers and deviationsthat may have occurred during testing of the original hardware.

  • 8/6/2019 GEVS_GSFC-STD-7000 Foarte Tare Carte

    37/151

    ENVIRONMENTAL VERIFICATION ENVIRONMENTAL VERIFICATION

    2.2- 4

    (2) Manufacturing information shall be reviewed to determine if changes have been madethat would invalidate the previous hardware qualification. This review should coverparts, materials, packaging techniques as well as changes to the assembly process orprocedures.

    (3) Test experience with the previous flight build shall be reviewed to verify that nosignificant modifications were made to the hardware during testing to successfullycomplete the test program. Any significant change s