AKSA MANAGEMENT
Etapa VI de Reabilitare Drumuri Nationale –Contract de Servicii Lot A - Reabilitare
DN79 Arad – Oradea, km 4+250 – km 107-725 – Contract 6R1
Nr. iesire 6R1 - 07 /18.07.2012
Catre: CNADNR
In atentia: Dl. Mircea POP – Director General
Dna Silvia Ciobanovschi – Sef Proiect UIP NR IFI 2
Dna Mihaela Mocanu – Sef Proiect UIP NR IFI 3
Catre: DRDP Cluj
In atentia: Dl. Gorcea Teodor – Director Adjunct Conducere
Dl. Pantelimon Ion – Director Regional Conducere
Catre: DRDP Timisoara
In atentia: Dl. Ioan Ambrus - Director
Catre: ASTALDI SpA Italia
In atentia: Dl. CARLI ENZO – Project Manager
Proiect: Etapa VI de Reabilitare Drumuri Nationale – Contract de Servicii Lot A - Reabilitare DN79 Arad – Oradea, km 4+250 – km 107-725 – Contract 6R1
Subiect: Mobilizare personal Consultanta
Stimate doamne, Stimati domni,
Urmare adresei Beneficiarului nr. 92/46183/16.07.2012, privind notificarea inceperii serviciilor de consultanta pentru proiectul mentionat mai sus, din data de 16.07.2012, va informam ca personalul Consultantului a fost mobilizat in santier din data de 17.07.2012.
Personalul cheie al Consultantului este detaliat mai jos:Nume PozitieAxinia Florin Sef echipa Nicolescu Cezar Inginer asigurarea calitatiiIonescu Sorin Expert Contracte 1
Page 1 of 2
AKSA MANAGEMENT
Etapa VI de Reabilitare Drumuri Nationale –Contract de Servicii Lot A - Reabilitare
DN79 Arad – Oradea, km 4+250 – km 107-725 – Contract 6R1
Datele de contact ale biroului principal al Consultantului sunt dupa cum urmeaza:
Adresa: Str. Nufarului, nr. 128, OradeaTel: 0359 467830Fax: 0359 467831
Pentru orice alte informatii, va stam la dispozitie.Cu respect,
Florin Axinia Sef echipa