Obiectul: REZISTENTA LISTA cu cantitati de lucrari pe categorii de lucrari CAPITOLUL DE LUCRARI UM CANTITATE PRETUL UNITAR SECTIUNEA TEHNICA SECTIUNEA FINANCIARA FORMULARUL C4 OBIECTIV SALA SPORT Categoria de lucrari: SUPRASTRUCTURA - Lei - NR. CRT Total (3 X 4) PROIECTANT SOLVI 0 2 3 4 1 5 1 CL29A% TONE 32.270 129.02 STRUCTURA METALICA(PROFILE LAMINATE LA CALD) 412.28 0.00 0.00 541.29 4163.32 13304.20 0.00 0.00 17467.52 2 CL29A%. TONE 3.580 129.02 STRUCTURA METALICA(PROFILE LAMINATE LA RECE) 412.28 0.00 0.00 541.29 461.88 1475.95 0.00 0.00 1937.83 3 CP04A1. BUC 635.000 0.00 MONTAJ CONECTORI (TIP NELSON) 1.02 0.00 0.00 1.02 0.00 644.58 0.00 0.00 644.58 4 CB01XA MP 80.000 5.98 COFRAJ PLANSEU 12.54 0.00 0.00 18.52 478.09 1003.50 0.00 0.00 1481.59 5 CC01D1. KG 800.000 0.11 FASONARE SI MONTAJ ARMATURA BST500C PLANSEU 0.54 0.11 0.00 0.76 90.72 429.25 90.72 0.00 610.69 6 CA03XE MC 10.000 1.27 TURNARE BETON C16/20 PLANSEU 28.49 1.43 0.00 31.19 12.70 284.95 14.29 0.00 311.94 BETON B250 (BC 20) MC 10.08 8000006 7 CMJ15A07B MP 13.000 5.98 COFRAJ SCARA 12.54 0.00 0.00 18.52 77.69 163.06 0.00 0.00 240.75 8 CC01D1. KG 200.000 0.11 FASONARE SI MONTAJ ARMATURA BST 500C SCARA 0.54 0.11 0.00 0.76 22.68 107.32 22.68 0.00 152.68 Pagina: 1

Transcript of LISTA cu cantitati de lucrari pe categorii de lucrari ... · PDF fileObiectul: REZISTENTA...

Page 1: LISTA cu cantitati de lucrari pe categorii de lucrari ... · PDF fileObiectul: REZISTENTA LISTA cu cantitati de lucrari pe categorii de lucrari CAPITOLUL DE LUCRARI UM CANTITATE PRETUL

Obiectul: REZISTENTALISTA cu cantitati de lucrari pe categorii de lucrari

CAPITOLUL DE LUCRARI UM CANTITATE PRETUL UNITAR

SECTIUNEA TEHNICA SECTIUNEA FINANCIARA

FORMULARUL C4

OBIECTIVSALA SPORT

Categoria de lucrari: SUPRASTRUCTURA

- Lei -

NR. CRT

Total(3 X 4)

PROIECTANTSOLVI

0 2 3 41 5

1 CL29A% TONE 32.270 129.02STRUCTURA METALICA(PROFILE LAMINATE LA CALD) 412.28

0.000.00

541.29

4163.3213304.20

0.000.00

17467.52

2 CL29A%. TONE 3.580 129.02STRUCTURA METALICA(PROFILE LAMINATE LA RECE) 412.28

0.000.00

541.29

461.881475.95

0.000.00

1937.83

3 CP04A1. BUC 635.000 0.00MONTAJ CONECTORI (TIP NELSON) 1.02

0.000.001.02

0.00644.58

0.000.00

644.58

4 CB01XA MP 80.000 5.98COFRAJ PLANSEU 12.54

0.000.00

18.52

478.091003.50

0.000.00

1481.59

5 CC01D1. KG 800.000 0.11FASONARE SI MONTAJ ARMATURA BST500C PLANSEU 0.54

0.110.000.76

90.72429.2590.720.00

610.69

6 CA03XE MC 10.000 1.27TURNARE BETON C16/20 PLANSEU 28.49

1.430.00

31.19

12.70284.9514.290.00

311.94

BETON B250 (BC 20)

MC 10.088000006

7 CMJ15A07B MP 13.000 5.98COFRAJ SCARA 12.54

0.000.00

18.52

77.69163.06

0.000.00

240.75

8 CC01D1. KG 200.000 0.11FASONARE SI MONTAJ ARMATURA BST 500C SCARA 0.54

0.110.000.76

22.68107.3222.680.00

152.68

Pagina: 1

Page 2: LISTA cu cantitati de lucrari pe categorii de lucrari ... · PDF fileObiectul: REZISTENTA LISTA cu cantitati de lucrari pe categorii de lucrari CAPITOLUL DE LUCRARI UM CANTITATE PRETUL

Obiectul: REZISTENTALISTA cu cantitati de lucrari pe categorii de lucrari

CAPITOLUL DE LUCRARI UM CANTITATE PRETUL UNITAR

SECTIUNEA TEHNICA SECTIUNEA FINANCIARA

FORMULARUL C4

OBIECTIVSALA SPORT

Categoria de lucrari: SUPRASTRUCTURA

- Lei -

NR. CRT

Total(3 X 4)

PROIECTANTSOLVI

0 2 3 41 5

9 CA03XE MC 2.300 1.27TURNARE BETON C16/20 -PLANSEU 28.50

1.430.00

31.20

2.9365.543.290.00

71.76

BETON B250 (BC 20)

MC 2.328000006

10 CE07A% MP 560.000 1.74TABLA CUTATA CU PROFIL INALT 153/0.88 7.25

1.070.00

10.05

971.614060.41596.94

0.005628.96

11 TRA01A10 TONE 1.000 0.00TRANSPORTUL RUTIER AL ARMATURILOR 0.00

0.0030.6230.62

0.000.000.00

30.6230.62

12 TRA05A10 TONE 30.000 0.00TRANSPORT RUTIER AL BETONULUI 0.00

0.0036.2936.29

0.000.000.00

1088.641088.64

13 TRA01A10 TONE 36.000 0.00TRANSPORTUL RUTIER AL STRUCTURII METALICE 0.00

0.0030.6230.62

0.000.000.00

1102.251102.25

TOTAL GENERAL 30769.79