DEVIZUL PE OBIECT NR. DENUMIRE VALOARE PE CATEG. DE LUCRARI CR. FARA T.V.A. MII LEI EURO I - LUCRARI DE CONSTRUCTII SI INSTALATII 1 Terasamente 0 2 Constructii:rezistenta si arhitectura 1405336651.4049 (valoare DCL fara TVA) 3 Izolatii 0 4 Instalatii electrice 3%din 2 42160099.542147 5 Instalatii sanitare 7% din pct 2 98373565.5983431 6 Instalatii de incalzire 13%din pct. 2 182693764.682637 Instalatii de ventilare 2% din pct. 28106733.028098 Instalatii de climatizare 0% 0 P.S.I. 0% 0 Radio T.V. 0% 0 Internet 0% 0 7 stalatii de alimentare cu gaze naturale 70266832.570245 8 Instalatii de telecomunicatii TOTAL I (faraT.V.A.) 1826937646.82637 T.V.A (19%) 347118152.89701 TOTAL I (cu T.V.A.) 2174055799.72338 II - MONTAJ Montaje utilaje si echipamente tehnologic 0 TOTAL II (fara TVA) 0 TVA (19%) 0 TOTAL II (cu TVA) 0 III -PROCURARE Utilaje si echipamente tehnologice 0 Utilaje si echipamente de transport 0 Dotari 0 TOTAL III (fara TVA) 0 TVA (19%) 0 TOTAL III ( cu TVA) 0 TOTAL(TOTAL I+TOTAL II+TOTAL III( fara TVA) 1826937646.82637 TVA (19%) 347118152.89701 TOTAL DEVIZ PE OBIECT (cu TVA) 2174055799.72338

description

.

Transcript of antemasuratoare

Page 1: antemasuratoare

DEVIZUL PE OBIECT

NR.

DENUMIRE

VALOARE PE CATEG. DE LUCRARICR. FARA T.V.A.

MII LEI EUROI - LUCRARI DE CONSTRUCTII SI INSTALATII

1 Terasamente 0

2Constructii:rezistenta si arhitectura

1405336651.4049(valoare DCL fara TVA)

3 Izolatii 04 Instalatii electrice 3%din 2 42160099.5421475 Instalatii sanitare 7% din pct 2 98373565.598343

6

Instalatii de incalzire 13%din pct. 2 182693764.682637 Instalatii de ventilare 2% din pct. 2 28106733.028098

Instalatii de climatizare 0% 0P.S.I. 0% 0

Radio T.V. 0% 0Internet 0% 0

7 Instalatii de alimentare cu gaze naturale 5% 70266832.5702458 Instalatii de telecomunicatii

TOTAL I (faraT.V.A.) 1826937646.82637T.V.A (19%) 347118152.89701

TOTAL I (cu T.V.A.) 2174055799.72338II - MONTAJ

Montaje utilaje si echipamente tehnologice 0TOTAL II (fara TVA) 0

TVA (19%) 0TOTAL II (cu TVA) 0III -PROCURARE

Utilaje si echipamente tehnologice 0Utilaje si echipamente de transport 0

Dotari 0TOTAL III (fara TVA) 0

TVA (19%) 0TOTAL III ( cu TVA) 0

TOTAL(TOTAL I+TOTAL II+TOTAL III( fara TVA) 1826937646.82637TVA (19%) 347118152.89701

TOTAL DEVIZ PE OBIECT (cu TVA) 2174055799.72338

Page 2: antemasuratoare

ANTEMASURATOARE

NR. CR. SIMBOL DENUMIRE ARTICOL SI CALCULUL CANTITATII EXPLICIT U. M. CANTITATE

0 1 2 3 4

1 CA01B1Turnare beton marca B 100 in fundatii continue

mc 4.3Vt=16,79+7,7+8,74+8,01+14,01=55,25

2 CA02C1Turnare beton in cuzineti

mc 11.15Vt=6,37+3,64+4,16+3,46+7,92=25,73

3 CA02I1Turnare B200 in plansee,grinzi,placi

mc 56.6Vt=4,62+7,35+26,43+27,43=70,45

4 CA02L1Turnare beton marca B200 in buiandrugi cu v= 0,5 mc

mc 3.6(0,8x0,25x0,10)16+(0,9x0,25x0,10)14+1,80x0,30x0,10=0,69

5 CB01A1Cofraje pt. cuzineti din panouri refolosibile

mp 288S=140,14 mp

6 CB04A1Cofraje pentru beton armat in placi

mp 248S=196,38+208,84=405,22 mp

7 CB04B1Cofraje pt. beton armat in stilpisori

mp 115S=(4x0,25x2,8)x24=67,2 mp

8 CB41A1Sustineri din schele pt. cofrajele planseelor

mp 248Conform articol 8: S=405,22 mp

9 CC01A1Montarea armaturilor din otel beton in fundatii

Kg 1015Conform articol 2: 25,73x70=1801,1

10 CC02C1Montarea armaturilor din otel beton in placi

Kg 6275Conform articol 2: (27,43+26,43)x100=5386

11 CD04L1Zidarie de caramida plina (37,5)

mc 98Vzid=73,31-3,04-9,05=61,22

12 CD04J1Zidarie de caramida plina (25 cm)

mc 42.5Vzid=67,54-4,05-7,99=55,5

13 CD04H1Zidarie de caramida plina (12,5 cm)

mc 5.4Vzid=6,65-1,79=4,87

ANTEMASURATOARE

NR. CR. SIMBOL DENUMIRE ARTICOL SI CALCULUL CANTITATII EXPLICIT U. M. CANTITATE

0 1 2 3 4

14 CE02A1Invelitoare din tigle solzi

mp 195

Page 3: antemasuratoare

14 CE02A1 S=252,63+84,28=336,91 mp 195

15 CE13A1Jgheaburi din tabla zincata de 0.5 mm grosime

m 22(11,55+1,2)x2+(23,75+1,2)x2=75,4

16 CE14A1Burlane din tabla zincata rotunde cu diametru 15,4cm

m 46(1+2,8)x4=15,2

17 CE17B1Sarpanta din lemn la acoperise simple cu 4 ape

mp 195S=24,95x12,75=318,113

18 CE19A1Pazii la streasina din scanduri din lemn

m 41L=(11,55+1,2)x2+(23,75+1,2)x2=75,4

19 CE19C1Streasina simpla din lemn

m 41Conform articol 21: L=75,4

20 CF01B1Tencuieli interioare driscuite la pereti

mp 813S=686,44

21 CF03B1Tencuieli interioare driscuite la tavane

mp 277S=204,79

22 CF06K1Tencuieli exterioare obisnuite

mp 1042S=163,76

23 CF10A1Glet aplicat pe tencuieli interioare driscuite

mp 970.3S=686,44-168+204,79=723,23

24 CG01D1Strat suport pentru pardoseli

mp 381S=204,79+189,19-62,3=331,68

25 CG02D1Pardoseli din parchet pe suport existent

mp 114S=(3,18x2,75+4,25x2,35)2+3,35x4,75x4+2,75x3,22x2=118,83

26 CG11A1Pardoseli din placi de gresie ceramica

mp 267S=2,05x1,5x2+2,05x1,15x2+1,025x2,35x2+(4x2,55+4x0,925+1,125x4)x2+3x2,05+1,6x2,3=62,3

27 CG12A1Scafe sau plinte din gresie ceramica

m 34S=(2,05+1,5)4+(2,05+1,15)4+(1,025+2,35)4+(2+2,55)8+(2+0,925)8+(1,125+2)8+(2,05+1,5)4+(1,6+1,15)4=150,5

ANTEMASURATOARE

NR. CR. SIMBOL DENUMIRE ARTICOL SI CALCULUL CANTITATII EXPLICIT U. M. CANTITATE

0 1 2 3 4

28 CK01A1Ferestre din lemn S<1mp

mp 5.14S=(0,6x0,8)4+(0,8x1,3)4+(0,4x0,6)8=8,0

29 CK01B1Ferestre din lemn S 1:2,5 mp

mp 15.9S=(2,1x1,3)x4+(1,2x1,3)6=20,28

Page 4: antemasuratoare

30 CK03A1Usi din lemn exterioare sau interioare

mp 74.91S=(0,9x2,10)x16+(0,8x2,10)x16=57,12

31 CK09A1Pervaze pentru ferestre

m 22.7L=0,6x4+0,8x4+0,4x8+2,1x4+1,2x6=24,4

32 CL20B1Balustrazi metalice pentru scari interioare

Kg 0Conform articol 33 : 9,25x10=92,5

33 CM01F1Geamuri pe tamplarie de lemn

mp 51.1S=2x(8+20,28)=28,28x2=56,56

34 CN01B1Zugraveli interioare si exterioare executate simplu

mp 2132Conform art.25 si 26: S=163,76+723,23=886,99

35 CN09A1Vopsitorii pe tamplarie de lemn

mp 95.95Conform art. 34;35;36 S=28,28x3+57,12x2,5=227,64

36 CO02B1Trotuar din placi de beton asezate pe strat de nisip

mp 38.6S=[11,55x2+(23,75+0,7x2)x2]x0,7=51,38

37 CI06A1Placaj de faianta de M100-T cu adaos de var

mp 101.7S=(19,88-1,68)x4+(25,48-1,68)x4=72,8+95,2=168

38 CZ0104B1Preparare beton B100

mc 15.57V=85,09x1,008=85,77

39 CZ0106B1Preparare beton B200

mc 60.68V=(70,45+0,69+99,4)x1,008=171,9

ANTEMASURATOARE

NR. CR. SIMBOL DENUMIRE ARTICOL SI CALCULUL CANTITATII EXPLICIT U. M. CANTITATE

0 1 2 3 4

40 CZ0201D1Preparare mortar M10-Z

mc 30conform art. 13;14;15;16: V=0,705+0,877+13,043+14,387=29,012

41 CZ0206D1Preparare mortar M10-T

mc 0Conform art. 23 : V=686,44x0,018=12,359

41 CZ0207D1Preparare mortar M-25-T

mc 19.62V=5,734+3,766=9,5

43 CZ0209D1Preparare mortar M100-T

mc 32.3conform art. 27 : V=331,68x0,031=10,28

44 CZ0301K1Fasonare armaturi in fundatii

Kg 1015

Page 5: antemasuratoare

44 CZ0301K1 Conform art. 11: 1801,1x1,000=1801,1 Kg 1015

45 CZ0302U1Fasonare armaturi in placi

Kg 6275Conform articol 12 : 5386x1,000=5386

46 TSA01B1Indepartare strat vegetal

mc 32V=(26,4x14,2)x0,20=74,976

47 TSA02B1Sapatura manuala de pamant in fundatii

mc 7.5Conform proiect tehnologie : V=44,1

48 TSC02C1Sapatura mecanizata cu excavatorul de 0,21-0,39 mc

100mc 1.13Conform proiect tehnologie : V=913,14/100 =9,1314

49 TSD01B1Imprastierea cu lopata a pamantului in strat uniform

mc 24

50 TSD06A1Compactarea cu placa vibratoare a umpluturilor

100mc 0.24Conform art. 59 : V=154,36/100=1,544

51 TSD16B1Strat de repartitie din balast cu granulatie de 0,0-7mm

mc 12V=(26,49+13,878x2+15,47+9,328+11,261)x2=180,61

52 IZF01A1Amorsarea supraf oriz. si vert. pt . aplicarea hidroizolatiei

mp 178.95S=80,52+26,843=107,363

53 IZF05A1Hidroizolatie la subsoluri executata la cald

mp 178.95S=Soriz+Svert=80,52+26,843=107,363

54 IZF10H1Strat termoizolant din saltele asezate in poduri

mp 126.37Conform art. 20 : S=318,113

Conform proiect tehnologie: V3=154,36

Page 6: antemasuratoare

DEVIZ PE CATEGORII DE LUCRARIa) U. M. Preturi unitare Valoare deviz

NR. b)Cantitate a)Material transport greutateCR. SIMBOL c)Denumire b)Manopera material manopera utilaj total C.F totala

d)Greutate c)Utilajd)Transport C.F. 2bx3a 2bx3b 2bx3c 4+5+6 2bx3d 2bx2d

0 1 2 3 4 5 6 7 8 9

1 CA01B1

mc 0.1

0.43 118.25 6.235 124.915 0 04.3 27.5

Turnare beton marca B 100 in fundatii continue 1.450 0

2 CA02C1

mc 0.1

1.115 441.54 24.307 466.962 0 011.15 39.6

Turnare beton in cuzineti 2.180 0

3 CA02I1

mc 0.3

16.98 2665.86 82.07 2764.91 0 056.6 47.1

Turnare B200 in plansee,grinzi,placi 1.450 0

4 CA02L1

mc 0.2

0.72 227.88 5.22 233.82 0 03.6 63.3

Turnare beton marca B200 in buiandrugi cu v= 0,5 mc 1.450 0

5 CB01A1

mp 6.05

1742.4 3168 8.64 4919.04 37.44 0.864288 11

Cofraje pt. cuzineti din panouri refolosibile 0.030.003 0.13

0 1 2 3 4 5 6 7 8 9

6 CB04A1

mp 5.68

1408.64 2165.04 2.48 3576.16 22.32 0.496248 8.73

Cofraje pentru beton armat in placi 0.010.002 0.09

7 CB04B1

mp 7.86

903.9 1357 2.3 2263.2 13.8 0.23

Page 7: antemasuratoare

7 CB04B1115 11.8

903.9 1357 2.3 2263.2 13.8 0.23Cofraje pt. beton armat in stilpisori 0.020.002 0.12

8 CB41A1

mp 1.7

421.6 2142.72 2.48 2566.8 9.92 0.248248 8.64

Sustineri din schele pt. cofrajele planseelor 0.010.001 0.04

9 CC01A1

Kg 0.13

131.95 345.1 0 477.05 0 01015 0.34

Montarea armaturilor din otel beton in fundatii 00 0

10 CC02C1

Kg 0.18

1129.5 2133.5 0 3263 0 06275 0.34

Montarea armaturilor din otel beton in placi 00 0

11 CD04L1

mc 362

35476 10878 237.16 46591.16 4596.2 127.79298 111

Zidarie de caramida plina (37,5) 2.421.304 46.9

12 CD04J1

mc 393

16702.5 5057.5 103.275 21863.28 1997.5 55.462542.5 119

Zidarie de caramida plina (25 cm) 2.431.305 47

0 1 2 3 4 5 6 7 8 9

13 CD04H1

mc 396

2138.4 642.6 13.176 2794.176 253.8 7.05245.4 119

Page 8: antemasuratoare

13 CD04H1 Zidarie de caramida plina (12,5 cm) 2.44 2138.4 642.6 13.176 2794.176 253.8 7.0524

1.306 47

14 CE02A1

mp 69.67

13585.65 1661.4 489.45 15736.5 72.15 1.365195 8.52

Invelitoare din tigle solzi 2.510.007 0.37

15 CE13A1

m 31.8

699.6 111.98 0.66 812.24 2.42 0.06622 5.09

Jgheaburi din tabla zincata de 0.5 mm grosime 0.030.003 0.11

16 CE14A1

m 34.1

1568.6 342.7 1.38 1912.68 5.52 0.09246 7.45

Burlane din tabla zincata rotunde cu diametru 15,4cm 0.030.002 0.12

17 CE17B1

mp 48.77

9510.15 2769 442.65 12721.8 76.05 3.12195 14.2

Sarpanta din lemn la acoperise simple cu 4 ape 2.270.016 0.39

18 CE19A1

m 4.28

175.48 77.08 8.61 261.17 0 041 1.88

Pazii la streasina din scanduri din lemn 0.210 0

0 1 2 3 4 5 6 7 8 9

19 CE19C1

m 13.186

540.626 610.9 3.28 1154.806 2.05 0.04141 14.9

Streasina simpla din lemn 0.080.001 0.05

20 CF01B1

mp 0.95

772.35 6853.59 203.25 7829.19 0 2.439

Page 9: antemasuratoare

20 CF01B1813 8.43

772.35 6853.59 203.25 7829.19 0 2.439Tencuieli interioare driscuite la pereti 0.250.003 0

21 CF03B1

mp 1.1

304.7 2880.8 99.72 3285.22 13.85 0.831277 10.4

Tencuieli interioare driscuite la tavane 0.360.003 0.05

22 CF06K1

mp 1.1

1146.2 16151 1813.08 19110.28 52.1 3.1261042 15.5

Tencuieli exterioare obisnuite 1.740.003 0.05

23 CF10A1

mp 0.28

271.684 1795.055 29.109 2095.848 9.703 1.9406970.3 1.85

Glet aplicat pe tencuieli interioare driscuite 0.030.002 0.01

24 CG01D1

mp 0

0 1687.83 262.89 1950.72 0 0381 4.43

Strat suport pentru pardoseli 0.690 0

25 CG02D1

mp 8.86

1010.04 1140 20.52 2170.56 2.28 0.114114 10

Pardoseli din parchet pe suport existent 0.180.001 0.02

0 1 2 3 4 5 6 7 8 9

26 CG11A1

mp 85.45

22815.15 3310.8 216.27 26342.22 114.81 3.738267 12.4

Pardoseli din placi de gresie ceramica 0.810.014 0.43

Page 10: antemasuratoare

27 CG12A1

m 24.36

828.24 145.52 6.12 979.88 1.7 0.03434 4.28

Scafe sau plinte din gresie ceramica 0.180.001 0.05

28 CK01A1

mp 123.35

634.019 143.406 0 777.425 0 0.010285.14 27.9

Ferestre din lemn S<1mp 00.002 0

29 CK01B1

mp 154.72

2460.048 206.7 0 2666.748 0.954 0.015915.9 13

Ferestre din lemn S 1:2,5 mp 00.001 0.06

0 1 2 3 4 5 6 7 8 9

30 CK03A1

mp 185.79

13917.53 1116.159 15.7311 15049.42 1.4982 074.91 14.9

Usi din lemn exterioare sau interioare 0.210 0.02

31 CK09A1

m 9.8

222.46 63.333 5.448 291.241 0 022.7 2.79

Pervaze pentru ferestre 0.240 0

32 CL20B1

Kg 11.5

0 0 0 0 0 00 1.31

Balustrazi metalice pentru scari interioare 00 0

33 CM01F1

mp 17.06

871.766 199.29 0 1071.056 0 051.1 3.9

Geamuri pe tamplarie de lemn 0

Page 11: antemasuratoare

33 CM01F1

0 0

871.766 199.29 0 1071.056 0 0

34 CN01B1

mp 19.41

41382.12 2004.08 0 43386.2 42.64 02132 0.94

Zugraveli interioare si exterioare executate simplu 00 0.02

0 1 2 3 4 5 6 7 8 9

35 CN09A1

mp 10.82

1038.179 789.6685 0 1827.848 0 095.95 8.23

Vopsitorii pe tamplarie de lemn 00 0

36 CO02B1

mp 10.44

402.984 341.224 0.772 744.98 2.316 6.484838.6 8.84

Trotuar din placi de beton asezate pe strat de nisip 0.020.168 0.06

37 CI06A1

mp 84.32

8575.344 3071.34 73.224 11719.91 35.595 1.3221101.7 30.2

Placaj de faianta de M100-T cu adaos de var 0.720.013 0.35

38 CZ0104B1

mc 123

1915.11 241.335 148.8492 2305.294 103.0734 3.1607115.57 15.5

Preparare beton B100 9.560.203 6.62

39 CZ0106B1

mc 193

11711.24 1104.376 661.412 13477.03 691.752 21.23860.68 18.2

Preparare beton B200 10.90.35 11.4

40 CZ0201D1

mc 121

3630 348 275.7 4253.7 198.9 5.430 11.6

Page 12: antemasuratoare

40 CZ0201D1 Preparare mortar M10-Z 9.19 3630 348 275.7 4253.7 198.9 5.4

0.18 6.63

0 1 2 3 4 5 6 7 8 9

41 CZ0206D1

mc 169

0 0 0 0 0 00 13.6

Preparare mortar M10-T 9.60.301 11.7

42 CZ0207D1

mc 169

3315.78 270.756 193.6494 3780.185 225.63 6.0037219.62 13.8

Preparare mortar M-25-T 9.870.306 11.5

43 CZ0209D1

mc 202.00

6524.6 507.11 371.45 7403.16 413.44 9.722332.3 15.70

Preparare mortar M100-T 11.500.301 12.80

44 CZ0301K1

Kg 5.1

5176.5 314.65 10.15 5501.3 50.75 1.0151015 0.31

Fasonare armaturi in fundatii 0.010.001 0.05

45 CZ0302U1

Kg 5.12

32128 1757 62.75 33947.75 313.75 6.2756275 0.28

Fasonare armaturi in placi 0.010.001 0.05

46 TSA01B1

mc 0

0 0 11776 11776 0 032 0

Indepartare strat vegetal 3680 0

Page 13: antemasuratoare

0 1 2 3 4 5 6 7 8 9

47 TSA02B1

mc 0

0 75.75 0 75.75 0 07.5 10.1

Sapatura manuala de pamant in fundatii 00 0

48 TSC02C1

100mc 0

0 0 415.84 415.84 0 01.13 0

Sapatura mecanizata cu excavatorul de 0,21-0,39 mc 3680 0

49 TSD01B1

mc 0.00

0 62.4 0 62.4 0 024 2.60

Imprastierea cu lopata a pamantului in strat uniform 0.000 0.00

50 TSD06A1

100mc 0

0 8.976 41.28 50.256 0 00.24 37.4

Compactarea cu placa vibratoare a umpluturilor 1720 0

51 TSD16B1

mc 43.9

526.8 146.4 21.12 694.32 0 012 12.2

Strat de repartitie din balast cu granulatie de 0,0-7mm 1.760 0

52 IZF01A1

mp 1.29

230.8455 69.7905 1.7895 302.4255 0 0178.95 0.39

Amorsarea supraf oriz. si vert. pt . aplicarea hidroizolatiei 0.010 0

53 IZF05A1

mp 7.25

1297.387 157.476 8.9475 1463.811 7.158 0.53685178.95 0.88

Hidroizolatie la subsoluri executata la cald 0.050.003 0.04

54 IZF10H1

mp 0

0 144.0618 10.1096 154.1714 0 0

Page 14: antemasuratoare

54 IZF10H1126.37 1.14

0 144.0618 10.1096 154.1714 0 0Strat termoizolant din saltele asezate in poduri 0.08

0 0

TOTAL CHELTUIELI DIRECTE249295.3 84063.93 18226.55 351521.8 9435.07 342.2362

A B C D E F

Page 15: antemasuratoare
Page 16: antemasuratoare

DEVIZ GENERAL

Nr. Crt.Denumirea capitolelor de cheltuieli Valoare totala

Partea ICap. 1 Cheltuieli pentru obtinera si amenajarea terenului

1--1 Obtinerea terenului 0.001--2 Amenajarea terenului 0.001--3 Amenajari pentru protectia mediului 0.00

Cap. 2 Cheltuieli pentru asigurarea unitatilor necesare obiectivului 0.00Cap. 3 Cheltuieli pentru proiectare si asitenta tehnica

3--1 Studii de teren 0.003--2 Obtinerea de avize si acorduri si autorizatii (1,6%) 34,784,892.803--3 Proiectare si cosultanta (5+2+1+1)% 195,665,021.983--4 Organizarea procedurilor de achizitie publica 0.003--5 Consultanta 0.003--6 Asistenta tehnica (0,5%) 10,870,279.00

Cap. 4 Cheltuieli pentru investitii de baza4--1 constructii si instalatii (total DO cu TVA) 2,174,055,799.724--2 Montaj utilaj tehnologic 0.004--3 Utilaje si echipamente tehnologice si functionale cu montaj 0.004--4 Utilaje si echipament tehnologic si functional fara montaj 0.004--5 Dotari 0.00

Cap. 5 Alte cheltuieli5--1 Organizare de santier (3,6%) din pct 4,1 78,266,008.795--2 Comision, taxe, etc. (0,5%) din pct. 4.1 10,870,279.005--3 Cheltuieli diverse si neprevazute (3,5%) din pct. 4.1 76,091,952.99

Cap. 6 Alte cheltuieli6--1 Pregatirea personalului de exploatare 0.006--2 Probe tehnice 0.00

TOTAL 0.00DIN CARE C + M 0.00Partea II

0.00Partea IIIFond de rulment necesar pentru primul ciclu de productie 0.00TOTAL GENERAL 2,580,604,234DIN CARE C + M 2,328,413,762

Valoare ramasa actualizata a mijloacelor fixe existente in cadrul obiectivului de investitie

Page 17: antemasuratoare

DEVIZ TOTAL

ACTUALIZARI PRETURI747885950.7252191780.4

54679662.928305208.8

D'=A'+B'+C' 10547573941026708.48

ALTE CHELTUIELI DIRECTE28305208.810267084.8

11348630.11860614294.41914

13177020.52595270808.21036

TOTAL CHELTUIELI DIRECTEL=A'+G+E' 786458244.3M=B'+H+I+J+K 342602533.6734N=C' 54679662.9O=L+M+N 1183740440.8734

CHELTUIELI INDIRECTE142048852.90480879547357.6266925

1405336651.4049267013963.766931

1672350615.17183

MATERIAL A' =Ax3000MANOPERA B' =Bx3000UTILAJ C' =Cx3000TRANSPORT C.F. E' =Ex3000

GREUTATE F' =Fx3000

TRANSPORTURI C.F. E'TRANSPORTURI AUTO (G=F*30000)MANOPERA MAISTRU (H=4,5%*B')C.A.S. (I=(B'+H)*23%) SOMAJ (J=(B'+H)*5%)FOND DE RISC SI ACCIDENTE (K=(B'+H)*2%

Chirii, salarii, TESA (P=12%*O)Profit (R=(P+O)*6%)Total Cheltuieli (S=P+R+O)T.V.A. (T=19%*S)

Total General (U=S+T)

Page 18: antemasuratoare

CENTRALIZATOR DE MATERIALE

NR. CR. DENUMIRE MATERIAL U.M CANTITATEA

1 CIMENT Kg 200410.9872 NISIP mc 2142.323423 PIETRIS mc 23.36184 BALAST mc 329.115355 ARMATURA Kg 7267.97656 MAT. LEMNOS mc 168.6303927 VAR mc 2.531158 CARAMIDA bucati 52770.069 GRESIE/FAIANTA mp 240.569

10 BITUM Kg 227.5013511 PARCHET mp 112.888512 GEAM mp 57.6912

263753.635662

Page 19: antemasuratoare

DEVIZ PE CATEGORII DE MATERIALENR.

Simbol Denumire articol U.M. Cantitate

Ciment Nisip PietrisCR. Kg mc mc

NC CT NC CT NC CT1 CA01B1 Turnare beton marca B 100 in fundatii continue mc 4.3 0 0 0

2 CA02C1 Turnare beton in cuzineti mc 11.15 0 0 0

3 CA02I1 Turnare B200 in plansee,grinzi,placi mc 56.6 0 0 0

4 CA02L1 Turnare beton marca B200 in buiandrugi cu v= 0,5 mc mc 3.6 0 0 0

5 CB01A1 Cofraje pt. cuzineti din panouri refolosibile mp 288 0 0 0

6 CB04A1 Cofraje pentru beton armat in placi mp 248 0 0 0

7 CB04B1 Cofraje pt. beton armat in stilpisori mp 115 0 0 0

8 CB41A1 Sustineri din schele pt. cofrajele planseelor mp 248 0 0 0

9 CC01A1 Montarea armaturilor din otel beton in fundatii Kg 1015 0 0 0

10 CC02C1 Montarea armaturilor din otel beton in placi Kg 6275 0 0 0

11 CD04L1 Zidarie de caramida plina (37,5) mc 98 0 0 0

12 CD04J1 Zidarie de caramida plina (25 cm) mc 42.5 0 0 0

13 CD04H1 Zidarie de caramida plina (12,5 cm) mc 5.4 0 0 0

14 CE02A1 Invelitoare din tigle solzi mp 195 0 0 0

15 CE13A1 Jgheaburi din tabla zincata de 0.5 mm grosime m 22 0 0 0

16 CE14A1 Burlane din tabla zincata rotunde cu diametru 15,4cm m 46 0 0 0

17 CE17B1 Sarpanta din lemn la acoperise simple cu 4 ape mp 195 0 0 0

18 CE19A1 Pazii la streasina din scanduri din lemn m 41 0 0 0

19 CE19C1 Streasina simpla din lemn m 41 0 0 0

20 CF01B1 Tencuieli interioare driscuite la pereti mp 813 0.8 650.4 0.007 5.691 0

21 CF03B1 Tencuieli interioare driscuite la tavane mp 277 1.4 387.8 0.007 1.939 0

22 CF06K1 Tencuieli exterioare obisnuite mp 1042 1.4 1458.8 1.407 1466.094 0

23 CF10A1 Glet aplicat pe tencuieli interioare driscuite mp 970.3 0 0 0

24 CG01D1 Strat suport pentru pardoseli mp 381 391 148971 1.28 487.68 0

25 CG02D1 Pardoseli din parchet pe suport existent mp 114 0 0 0

26 CG11A1 Pardoseli din placi de gresie ceramica mp 267 13.83 3692.61 0.037 9.879 0

27 CG12A1 Scafe sau plinte din gresie ceramica m 34 1.413 48.042 0.003 0.102 0NR.

Simbol Denumire articol U.M. Cantitate

Ciment Nisip PietrisCR. Kg mc mc

NC CT NC CT NC CT28 CK01A1 Ferestre din lemn S<1mp mp 5.14 0 0 0

Page 20: antemasuratoare

29 CK01B1 Ferestre din lemn S 1:2,5 mp mp 15.9 0 0 0

30 CK03A1 Usi din lemn exterioare sau interioare mp 74.91 0 0 0

31 CK09A1 Pervaze pentru ferestre m 22.7 0 0 0

32 CL20B1 Balustrazi metalice pentru scari interioare Kg 0 0 0 0

33 CM01F1 Geamuri pe tamplarie de lemn mp 51.1 0 0 0

34 CN01B1 Zugraveli interioare si exterioare executate simplu mp 2132 0 0 0

35 CN09A1 Vopsitorii pe tamplarie de lemn mp 95.95 0 0 0

36 CO02B1 Trotuar din placi de beton asezate pe strat de nisip mp 38.6 0 0.107 4.1302 0

37 CI06A1 Placaj de faianta de M100-T cu adaos de var mp 101.7 10.65 1083.11 0.027 2.7459 0

38 CZ0104B1 Preparare beton B100 mc 15.57 203 3160.71 0.148 2.30436 0

39 CZ0106B1 Preparare beton B200 mc 60.68 350 21238 0.967 58.67756 0.385 23.3618

40 CZ0201D1 Preparare mortar M10-Z mc 30 118 3540 1.26 37.8 0

41 CZ0206D1 Preparare mortar M10-T mc 0 1.47 0 1.23 0 0

42 CZ0207D1 Preparare mortar M-25-T mc 19.62 181 3551.22 1.22 23.9364 0

43 CZ0209D1 Preparare mortar M100-T mc 32.3 391 12629.3 1.28 41.344 0

44 CZ0301K1 Fasonare armaturi in fundatii Kg 1015 0 0 0

45 CZ0302U1 Fasonare armaturi in placi Kg 6275 0 0 0

46 TSA01B1 Indepartare strat vegetal mc 32 0 0 0

47 TSA02B1 Sapatura manuala de pamant in fundatii mc 7.5 0 0 0

48 TSC02C1 Sapatura mecanizata cu excavatorul de 0,21-0,39 mc 100mc 1.13 0 0 0

49 TSD01B1 Imprastierea cu lopata a pamantului in strat uniform mc 24 0 0 0

50 TSD06A1 Compactarea cu placa vibratoare a umpluturilor 100mc 0.24 0 0 0

51 TSD16B1 Strat de repartitie din balast cu granulatie de 0,0-7mm mc 12 0 0 0

52 IZF01A1 Amorsarea supraf oriz. si vert. pt . aplicarea hidroizolatiei mp 178.95 0 0 0

53 IZF05A1 Hidroizolatie la subsoluri executata la cald mp 178.95 0 0 0

54 IZF10H1 Strat termoizolant din saltele asezate in poduri mp 126.37 0 0 0

CANTITATE TOTALA DE MATERIAL 200411 2142.3234 23.3618

NR.

Simbol Denumire articol U.M. Cantitate

Balastt Armatura LemnCR. mc Kg mc

NC CT NC CT NC CT1 CA01B1 Turnare beton marca B 100 in fundatii continue izolate mc 55.25 0 0 0

2 CA02C1 Turnare beton in cuzineti mc 25.73 0 0 0

3 CA02I1 Turnare B200 in plansee,grinzi,placi mc 70.45 0 0 0

4 CA02L1 Turnare beton marca B200 in buiandrugi cu v= 0,5 mc mc 0.69 0 0 0

Page 21: antemasuratoare

5 CB01A1 Cofraje pt. cuzineti din panouri refolosibile mp 140.14 0 0 0.004 0.56056

6 CB04A1 Cofraje pentru beton armat in placi mp 405.22 0 0 0.0009 0.364698

7 CB04B1 Cofraje pt. beton armat in stilpisori mp 67.2 0 0 0

8 CB41A1 Sustineri din schele pt. cofrajele planseelor mp 405.22 0 0 0

9 CC01A1 Montarea armaturilor din otel beton in fundatii Kg 1801.1 0 0 0

10 CC02C1 Montarea armaturilor din otel beton in placi Kg 5386 0 0 0

11 CD04L1 Zidarie de caramida plina (37,5) mc 61.22 0 0 0.0015 0.09183

12 CD04J1 Zidarie de caramida plina (25 cm) mc 55.5 0 0 0.002 0.111

13 CD04H1 Zidarie de caramida plina (12,5 cm) mc 4.87 0 0 0.003 0.01461

14 CE02A1 Invelitoare din tigle solzi mp 336.91 0 0 0

15 CE13A1 Jgheaburi din tabla zincata de 0.5 mm grosime m 75.4 0 0 0

16 CE14A1 Burlane din tabla zincata rotunde cu diametru 15,4cm m 15.2 0 0 0

17 CE17B1 Sarpanta din lemn la acoperise simple cu 4 ape mp 318.113 0 0 0.038 12.088294

18 CE19A1 Pazii la streasina din scanduri din lemn m 75.4 0 0 0.05 3.77

19 CE19C1 Streasina simpla din lemn m 75.4 0 0 2.011 151.6294

20 CF01B1 Tencuieli interioare driscuite la pereti mp 686.44 0 0 0

21 CF03B1 Tencuieli interioare driscuite la tavane mp 204.79 0 0 0

22 CF06K1 Tencuieli exterioare obisnuite mp 163.76 0 0 0

23 CF10A1 Glet aplicat pe tencuieli interioare driscuite mp 723.23 0 0 0

24 CG01D1 Strat suport pentru pardoseli mp 331.68 0 0 0

25 CG02D1 Pardoseli din parchet pe suport existent mp 118.83 0 0 0

26 CG11A1 Pardoseli din placi de gresie ceramica mp 62.3 0 0 0

27 CG12A1 Scafe sau plinte din gresie ceramica m 150.5 0 0 0

Simbol Denumire articolU.M. Cantitate

Balastt Armatura Lemn

mc Kg mc

NC CT NC CT NC CT

28 CK01A1 Ferestre din lemn S<1mp mp 8 0 0 0

29 CK01B1 Ferestre din lemn S 1:2,5 mp mp 20.28 0 0 0

30 CK03A1 Usi din lemn exterioare sau interioare mp 57.12 0 0 0

31 CK09A1 Pervaze pentru ferestre m 24.4 0 0 0

32 CL20B1 Balustrazi metalice pentru scari interioare Kg 92.5 0 0 0

33 CM01F1 Geamuri pe tamplarie de lemn mp 56.56 0 0 0

34 CN01B1 Zugraveli interioare si exterioare executate simplu mp 886.99 0 0 0

Page 22: antemasuratoare

35 CN09A1 Vopsitorii pe tamplarie de lemn mp 227.64 0 0 0

36 CO02B1 Trotuar din placi de beton asezate pe strat de nisip mp 51.38 0 0 0

37 CI06A1 Placaj de faianta de M100-T cu adaos de var mp 168 0 0 0

38 CZ0104B1 Preparare beton B100 mc 85.77 1.205 103.353 0 039 CZ0106B1 Preparare beton B200 mc 171.9 0 0 0

40 CZ0201D1 Preparare mortar M10-Z mc 29.012 0 0 0

41 CZ0206D1 Preparare mortar M10-T mc 12.359 0 0 0

42 CZ0207D1 Preparare mortar M-25-T mc 9.5 0 0 0

43 CZ0209D1 Preparare mortar M100-T mc 10.28 0 0 0

44 CZ0301K1 Fasonare armaturi in fundatii Kg 1801.1 0 1.015 1828.1165 0

45 CZ0302U1 Fasonare armaturi in placi Kg 5386 0 1.01 5439.86 0

46 TSA01B1 Indepartare strat vegetal mc 74.976 0 0 0

47 TSA02B1 Sapatura manuala de pamant in fundatii mc 44.1 0 0 0

48 TSC02C1 Sapatura mecanizata cu excavatorul de 0,21-0,39 mc 100mc 9.1314 0 0 0

49 TSD01B1 Imprastierea cu lopata a pamantului in strat uniform mc 154.36 0 0 0

50 TSD06A1 Compactarea cu placa vibratoare a umpluturilor 100mc 1.544 0 0 0

51 TSD16B1 Strat de repartitie din balast cu granulatie de 0,0-7mm mc 180.61 1.25 225.763 0 0

52 IZF01A1 Amorsarea supraf oriz. si vert. pt . aplicarea hidroizolatiei mp 107.363 0 0 0

53 IZF05A1 Hidroizolatie la subsoluri executata la cald mp 107.363 0 0 0

54 IZF10H1 Strat termoizolant din saltele asezate in poduri mp 318.113 0 0 0

CANTITATE TOTALA DE MATERIAL 329.115 7267.9765 168.63039

NR.

Simbol Denumire articol U.M. Cantitate

Var Caramida Gresie si faiantaCR. mc buc mc

NC CT NC CT NC CT1 CA01B1 Turnare beton marca B 100 in fundatii continue mc 55.25 0 0 0

2 CA02C1 Turnare beton in cuzineti mc 25.73 0 0 0

3 CA02I1 Turnare B200 in plansee,grinzi,placi mc 70.45 0 0 0

4 CA02L1 Turnare beton marca B200 in buiandrugi cu v= 0,5 mc mc 0.69 0 0 0

5 CB01A1 Cofraje pt. cuzineti din panouri refolosibile mp 140.14 0 0 0

6 CB04A1 Cofraje pentru beton armat in placi mp 405.22 0 0 0

7 CB04B1 Cofraje pt. beton armat in stilpisori mp 67.2 0 0 0

8 CB41A1 Sustineri din schele pt. cofrajele planseelor mp 405.22 0 0 0

9 CC01A1 Montarea armaturilor din otel beton in fundatii Kg 1801.1 0 0 0

10 CC02C1 Montarea armaturilor din otel beton in placi Kg 5386 0 0 0

Page 23: antemasuratoare

11 CD04L1 Zidarie de caramida plina (37,5) mc 61.22 0 434 26569.48 0

12 CD04J1 Zidarie de caramida plina (25 cm) mc 55.5 0 434 24087 0

13 CD04H1 Zidarie de caramida plina (12,5 cm) mc 4.87 0 434 2113.58 0

14 CE02A1 Invelitoare din tigle solzi mp 336.91 0 0 0

15 CE13A1 Jgheaburi din tabla zincata de 0.5 mm grosime m 75.4 0 0 0

16 CE14A1 Burlane din tabla zincata rotunde cu diametru 15,4cm m 15.2 0 0 017 CE17B1 Sarpanta din lemn la acoperise simple cu 4 ape mp 318.113 0 0 0

18 CE19A1 Pazii la streasina din scanduri din lemn m 75.4 0 0 0

19 CE19C1 Streasina simpla din lemn m 75.4 0 0 0

20 CF01B1 Tencuieli interioare driscuite la pereti mp 686.44 0.0015 1.02966 0 0

21 CF03B1 Tencuieli interioare driscuite la tavane mp 204.79 0.0012 0.24575 0 0

22 CF06K1 Tencuieli exterioare obisnuite mp 163.76 0.0012 0.19651 0 0

23 CF10A1 Glet aplicat pe tencuieli interioare driscuite mp 723.23 0.001 0.72323 0 0

24 CG01D1 Strat suport pentru pardoseli mp 331.68 0 0 0

25 CG02D1 Pardoseli din parchet pe suport existent mp 118.83 0 0 0

26 CG11A1 Pardoseli din placi de gresie ceramica mp 62.3 0 0 1.03 64.169

27 CG12A1 Scafe sau plinte din gresie ceramica m 150.5 0 0 0

NR.

Simbol Denumire articol U.M. Cantitate

Var Caramida Gresie si faiantaCR. mc buc mc

NC CT NC CT NC CT28 CK01A1 Ferestre din lemn S<1mp mp 8 0 0 0

29 CK01B1 Ferestre din lemn S 1:2,5 mp mp 20.28 0 0 0

30 CK03A1 Usi din lemn exterioare sau interioare mp 57.12 0 0 0

31 CK09A1 Pervaze pentru ferestre m 24.4 0 0 0

32 CL20B1 Balustrazi metalice pentru scari interioare Kg 92.5 0 0 0

33 CM01F1 Geamuri pe tamplarie de lemn mp 56.56 0 0 0

34 CN01B1 Zugraveli interioare si exterioare executate simplu mp 886.99 0 0 0

35 CN09A1 Vopsitorii pe tamplarie de lemn mp 227.64 0 0 0

36 CO02B1 Trotuar din placi de beton asezate pe strat de nisip mp 51.38 0 0 0

37 CI06A1 Placaj de faianta de M100-T cu adaos de var mp 168 0.002 0.336 0 1.05 176.4

38 CZ0104B1 Preparare beton B100 mc 85.77 0 0 0

39 CZ0106B1 Preparare beton B200 mc 171.9 0 0 0

40 CZ0201D1 Preparare mortar M10-Z mc 29.012 0 0 0

41 CZ0206D1 Preparare mortar M10-T mc 12.359 0 0 0

Page 24: antemasuratoare

42 CZ0207D1 Preparare mortar M-25-T mc 9.5 0 0 0

43 CZ0209D1 Preparare mortar M100-T mc 10.28 0 0 0

44 CZ0301K1 Fasonare armaturi in fundatii Kg 1801.1 0 0 0

45 CZ0302U1 Fasonare armaturi in placi Kg 5386 0 0 0

46 TSA01B1 Indepartare strat vegetal mc 74.976 0 0 0

47 TSA02B1 Sapatura manuala de pamant in fundatii mc 44.1 0 0 0

48 TSC02C1 Sapatura mecanizata cu excavatorul de 0,21-0,39 mc 100mc 9.1314 0 0 0

49 TSD01B1 Imprastierea cu lopata a pamantului in strat uniform mc 154.36 0 0 0

50 TSD06A1 Compactarea cu placa vibratoare a umpluturilor 100mc 1.544 0 0 0

51 TSD16B1 Strat de repartitie din balast cu granulatie de 0,0-7mm mc 180.61 0 0 0

52 IZF01A1 Amorsarea supraf oriz. si vert. pt . aplicarea hidroizolatiei mp 107.363 0 0 0

53 IZF05A1 Hidroizolatie la subsoluri executata la cald mp 107.363 0 0 0

54 IZF10H1 Strat termoizolant din saltele asezate in poduri mp 318.113 0 0 0

CANTITATE TOTALA DE MATERIAL 2.53115 52770.06 240.569

NR.

Simbol Denumire articol U.M. Cantitate

Bitum Parchet GeamCR. Kg mp mp

NC CT NC CT NC CT1 CA01B1 Turnare beton marca B 100 in fundatii continue izolate mc 55.25 0 0 0

2 CA02C1 Turnare beton in cuzineti mc 25.73 0 0 0

3 CA02I1 Turnare B200 in plansee,grinzi,placi mc 70.45 0 0 0

5 CA02L1 Turnare beton marca B200 in buiandrugi cu v= 0,5 mc mc 0.69 0 0 0

6 CB01A1 Cofraje pt. cuzineti din panouri refolosibile mp 140.14 0 0 0

7 CB04A1 Cofraje pentru beton armat in placi mp 405.22 0 0 0

8 CB04B1 Cofraje pt. beton armat in stilpisori mp 67.2 0 0 0

9 CB41A1 Sustineri din schele pt. cofrajele planseelor mp 405.22 0 0 0

10 CC01A1 Montarea armaturilor din otel beton in fundatii Kg 1801.1 0 0 0

11 CC02C1 Montarea armaturilor din otel beton in placi Kg 5386 0 0 0

12 CD04L1 Zidarie de caramida plina (37,5) mc 61.22 0 0 0

13 CD04J1 Zidarie de caramida plina (25 cm) mc 55.5 0 0 0

14 CD04H1 Zidarie de caramida plina (12,5 cm) mc 4.87 0 0 0

15 CE02A1 Invelitoare din tigle solzi mp 336.91 0 0 0

16 CE13A1 Jgheaburi din tabla zincata de 0.5 mm grosime m 75.4 0 0 0

17 CE14A1 Burlane din tabla zincata rotunde cu diametru 15,4cm m 15.2 0 0 0

18 CE17B1 Sarpanta din lemn la acoperise simple cu 2 ape mp 318.113 0 0 0

Page 25: antemasuratoare

19 CE19A1 Pazii la streasina din scanduri din lemn m 75.4 0 0 0

20 CE19C1 Streasina simpla din lemn m 75.4 0 0 0

21 CF01B1 Tencuieli interioare driscuite la pereti mp 686.44 0 0 0

22 CF03B1 Tencuieli interioare driscuite la tavane mp 204.79 0 0 0

23 CF06K1 Tencuieli exterioare obisnuite mp 163.76 0 0 0

24 CF10A1 Glet aplicat pe tencuieli interioare driscuite mp 723.23 0 0 0

25 CG01D1 Strat suport pentru pardoseli mp 331.68 0 0 0

26 CG02D1 Pardoseli din parchet pe suport existent mp 118.83 0 0.95 112.8885 0

27 CG11A1 Pardoseli din placi de gresie ceramica mp 62.3 0 0 0

28 CG12A1 Scafe sau plinte din gresie ceramica m 150.5 0 0 0

NR.

Simbol Denumire articol U.M. Cantitate

Bitum Parchet GeamCR. Kg mp mp

NC CT NC CT NC CT29 CK01A1 Ferestre din lemn S<1mp mp 8 0 0 0

30 CK01B1 Ferestre din lemn S 1:2,5 mp mp 20.28 0 0 0

31 CK03A1 Usi din lemn exterioare sau interioare mp 57.12 0 0 0

32 CK09A1 Pervaze pentru ferestre m 24.4 0 0 0

33 CL20B1 Balustrazi metalice pentru scari interioare Kg 92.5 0 0 0

34 CM01F1 Geamuri pe tamplarie de lemn mp 56.56 0 0 1.02 57.6912

35 CN01B1 Zugraveli interioare si exterioare executate simplu mp 886.99 0 0 0

36 CN09A1 Vopsitorii pe tamplarie de lemn mp 227.64 0 0 0

37 CO02B1 Trotuar din placi de beton asezate pe strat de nisip mp 51.38 0.98 50.3524 0 0

38 CI06A1 Placaj de faianta de M100-T cu adaos de var mp 168 0 0 0

39 CZ0104B1 Preparare beton B100 mc 85.77 0 0 0

40 CZ0106B1 Preparare beton B200 mc 171.9 0 0 0

41 CZ0201D1 Preparare mortar M10-Z mc 29.012 0 0 0

42 CZ0206D1 Preparare mortar M10-T mc 12.359 0 0 0

43 CZ0207D1 Preparare mortar M-25-T mc 9.5 0 0 0

44 CZ0209D1 Preparare mortar M100-T mc 10.28 0 0 0

45 CZ0301K1 Fasonare armaturi in fundatii Kg 1801.1 0 0 0

46 CZ0302U1 Fasonare armaturi in placi Kg 5386 0 0 0

47 TSA01B1 Indepartare strat vegetal mc 74.976 0 0 0

48 TSA02B1 Sapatura manuala de pamant in fundatii mc 44.1 0 0 0

Page 26: antemasuratoare

49 TSC02C1 Sapatura mecanizata cu excavatorul de 0,21-0,39 mc 100mc 9.1314 0 0 0

50 TSD01B1 Imprastierea cu lopata a pamantului in strat uniform mc 154.36 0 0 0

51 TSD06A1 Compactarea cu placa vibratoare a umpluturilor 100mc 1.544 0 0 0

52 TSD16B1 Strat de repartitie din balast cu granulatie de 0,0-7mm mc 180.61 0 0 0

53 IZF01A1 Amorsarea supraf oriz. si vert. pt . aplicarea hidroizolatiei mp 107.363 0.15 16.1045 0 0

54 IZF05A1 Hidroizolatie la subsoluri executata la cald mp 107.363 1.5 161.045 0 0

64 IZF10H1 Strat termoizolant din saltele asezate in poduri mp 318.113 0 0 0

CANTITATE TOTALA DE MATERIAL 227.501 112.8885 57.6912