2012-11-14-12-PLANSE P.TH.

33
Ticos Floarea TASCA PANGARATI TARCAU Izvoru Alb Buhalnita Ruginesti Potoci Secu Izvoru Muntelui Dodeni Capsa Stejaru Hamzoaia Cazaci Straja Poiana P i   g  a r  a  t  i  P i ng ar ac i o r H  a m z  o a i  a  A ta Pascu  C  r  a  s  n  a    P   o    l   o   c   F   r  a   s   i   n  V  a  l  e  a  B  a  t  r  i  n  a T      a    r     c     a    u     BICAZ Halta Stejaru Statia Tarcau-Neamt Statia Bicaz P    a   n    g   a   r   a   t    i      S  e  c   u    M   i   h   l   i   t I z v o r u l M u n t e l u i  D  N  1   5  DN 12C DJ 155F       c    1    3    9  1  4  0  D  c  D  c  1  3  5  DENUMIRE PROIECT: BENEFICIAR: DENU MIRE PLAN  : PROIECT NR.: ŞEF PROIECT DESENAT VERIFICATOR VERIFICAT DATA:  2012 SCARA: PLANSA NR.: POD PROIECT PROIECTANT GENERAL: FAZA: Proiect Tehnic Reabilitare pod pe DN 15, Km. 287+062, peste raul Bicaz, la Bicaz,  jud. Neamt 01 CERINTE  A4, B2, D2 Nr.ref. / Data PLAN DE INCADRARE IN ZONA 01 1:200000

Transcript of 2012-11-14-12-PLANSE P.TH.

Page 1: 2012-11-14-12-PLANSE P.TH.

7/23/2019 2012-11-14-12-PLANSE P.TH.

http://slidepdf.com/reader/full/2012-11-14-12-planse-pth 1/43

Ticos Floarea

TASCA

PANGARATI

TARCAU

Izvoru Alb

Buhalnita

Ruginesti

Potoci

Secu

Izvoru Muntelui

Dodeni

Capsa

Stejaru

Hamzoaia

Cazaci

Straja

Poiana

i  n g ar  a t  i  

P i ng ar ac i o r 

H  a m z  o a i  a 

 C r a s n a

   P  o   l  o

  c

  F  r a  s  i  n

V a l e a  B a

 t r i n a

T      a    r     c     a    u     

BICAZ

Halta

Stejaru

StatiaTarcau-Neamt

StatiaBicaz

P    a   n    g   

a   r   a   

t    i    

M  i  h  l  i

  t

I z v o r u l  M u n t e l u i 

 D N 1   5  

DN 12C

DJ 155F 

   D   c   1   3   9

 1 4 0

 D c 

D               c            1                3                5                

DENUMIRE PROIECT: 

BENEFICIAR: 

VERIFICATOR

POD PROIECT

PROIECTANT GENERAL: 

FAZA: Proiect Tehnic

Reabilitare pod pe DN 15,

Km. 287+062,

peste raul Bicaz, la Bicaz, jud. Neamt

CERINTE

A4 B2 D2

Nr.ref. / Data

Page 2: 2012-11-14-12-PLANSE P.TH.

7/23/2019 2012-11-14-12-PLANSE P.TH.

http://slidepdf.com/reader/full/2012-11-14-12-planse-pth 2/43

B

STATIE GAZE

P + M

 A 3419.39

(beton)

PECO

S.C. RAFO IMPERIALOIL S.R.L.

P

P + M

 A 4420.61

 A 5423.06 T r o t u ar ( p av a j ) 

.v..v.

.v.

.v..v.

.v..v.

PECO

(pavaj)

 A 6

423.60

.v.

.v.

.v.

.v.

.v.

.v..v.

(pavaj)

(pavaj)

 A 7421.89

T r o t uar ( p av a j) 

KM0+500

 A 8417.35

 A 9

411.94

 A 10411.33 (balast)

CC

CC

CC

(balast)

(balast)

(balast)

(balast)

(balast)

sp r e P I  AT R  A N E  AM T 

D N 15 ( asf al t ) 

s  p r e  C E N T R U  O R  AS 

  D  r  u  m

   (   b a  l a

 s  t  )

  D r u m

 (   b a  l a s

  t  )

  D  r  u  m

   (   b a  l a

  s  t  )

           W          C(beton)

(beton)

.v.

.v.

.v.

(beton) B

           P           R          A          G

           C          O           L           M

          A           T          A           R           E

            R           U           P           T

02

1:1000

   6   0   1   8   5   0

NOTA:

1. Orice neconcordanta constatata intre prevederile prezentei planse si

  situatia din amplasamentul podului, se aduce imediat la cunostinta proiectantului.

2. Orice modificare a prevederilor prezentei planse se face numai cu acordul scris al proiectantului.

DENUMIRE PROIECT: 

BENEFICIAR: 

DENUMIRE PLAN  : 

PROIECT NR.:

ŞEF PROIECT

DESENAT

VERIFICATOR

VERIFICAT

DATA:   2012

SCARA:

PLANSA NR.:

POD PROIECT

PROIECTANT GENERAL: 

FAZA: Proiect Tehnic

Reabilitare pod pe DN 15,

Km. 287+062,

peste raul Bicaz, la Bicaz,

 jud. Neamt

01

CERINTE

 A4, B2, D2

Nr.ref. / Data

Page 3: 2012-11-14-12-PLANSE P.TH.

7/23/2019 2012-11-14-12-PLANSE P.TH.

http://slidepdf.com/reader/full/2012-11-14-12-planse-pth 3/43

      R    a    u      l       B      i    c

    a    z

10.75 40.00 10.50 10.00 7.50

61.58

   2   5

   1 .   5

   0

   7 .   0

   0

   1 .   5

   0

   2   54 10.754

DN15

Km287+062

BIC AZPIATRA NEAMT

28.00

89.58

                                                                                                    D                                                                                                    R                                                                                                    U  

                                                                                                    M

                                                                                                    P                                                                                                    I                                                                                                     E

                                                                                                    T                                                                                                    R                                                                                                    U  

                                                                                                    I                                                                                                    T

DENUMIRE PROIECT: 

DENUMIRE PLAN  : 

PROIECT NR.:

ŞEF PROIECT

DESENAT

VERIFICATOR

VERIFICAT

DATA:   2012

SCARA:

PLANSA NR.:

POD PROIECT

PROIECTANT GENERAL: 

FAZA: Proiect Tehnic

Reabilitare pod pe DN 15,

Km. 287+062,

peste raul Bicaz, la Bicaz,

 jud. Neamt

01

CERINTE A4, B2, D2

Nr.ref. / Data

03

1:100

NOTA:1. Cu rosu sunt semnalizate zonele cu defecte si/sau degradari.

2. Orice modificare a prezentei planse se face numai cu acordul scris al proiectantului.

3. Orice neconcordanta cu prevederile prezentei planse si situatia din amplasamentul podului,

 se va aduce la cunostinta proiectantului.

Page 4: 2012-11-14-12-PLANSE P.TH.

7/23/2019 2012-11-14-12-PLANSE P.TH.

http://slidepdf.com/reader/full/2012-11-14-12-planse-pth 4/43

SECTIUNE ELEVATIE

ETIAJ

5050

10.50

40.505

10.505   5  9.005

  7.90587.60

4.50 50

50 9.75 9.75

50 4.50 50 4.50 50 4.5050 50

4.50

19.50

50 4.50

4.70

10.84

centru oras BICAZ

PIATRA NEAMT

DENUMIRE PROIECT: 

DENUMIRE PLAN  : 

PROIECT NR.:

ŞEF PROIECT

DESENAT

VERIFICATOR

VERIFICAT

DATA:   2012

SCARA:

PLANSA NR.:

POD PROIECT

PROIECTANT GENERAL: 

FAZA: Proiect Tehnic

Reabilitare pod pe DN 15,

Km. 287+062,

peste raul Bicaz, la Bicaz,

 jud. Neamt

01

CERINTE A4, B2, D2

Nr.ref. / Data

04

1:100

NOTA:1. Curosu sunt semnalizatezonelecu defectesi/saudegradari.

2. Oricemodificarea prezenteiplansese facenumaicu acordulscris alproiectantului.3. Oriceneconcordantacuprevederileprezentei plansesisituatia dinamplasamentulpodului,

 seva aducelacunostinta proiectantului.

REPARATII

REPARATII

REPARATII

REPARATII

REPARATII

Page 5: 2012-11-14-12-PLANSE P.TH.

7/23/2019 2012-11-14-12-PLANSE P.TH.

http://slidepdf.com/reader/full/2012-11-14-12-planse-pth 5/43

4.40

6.50

   3 .   1

   5

   1 .   0

   0

   4 .   5

   5

60 456045 2.20 2.20

1.82 35

1.00 7.0025

   2   2

10   4   0

60

   3   9

9.50

SECTIUNE TRANSVERSALA

LA CAPAT sc 1:100

   2 .   1

   5

   6   0

1.8235

1.00 25

   2   2

10   4   0   3   9

REPARATII

REPARATII

Page 6: 2012-11-14-12-PLANSE P.TH.

7/23/2019 2012-11-14-12-PLANSE P.TH.

http://slidepdf.com/reader/full/2012-11-14-12-planse-pth 6/43

6.50

25 1.00 1.00 251.85 80 1.85

   3 .   1

   5

   1 .   0

   0

   4 .   5

   5

1.00

1.851.50

60 456045

6.50

1.82

25

9.50

SECTIUNE TRANSVERSALA

LA MIJLOC

sc 1:100

35

7.00

   2 .   1

   5

1.00 7.00

1.851.501.82

25

35

4.40

REPATATII

REPATATII

REPATATII

Page 7: 2012-11-14-12-PLANSE P.TH.

7/23/2019 2012-11-14-12-PLANSE P.TH.

http://slidepdf.com/reader/full/2012-11-14-12-planse-pth 7/43

Page 8: 2012-11-14-12-PLANSE P.TH.

7/23/2019 2012-11-14-12-PLANSE P.TH.

http://slidepdf.com/reader/full/2012-11-14-12-planse-pth 8/43

Page 9: 2012-11-14-12-PLANSE P.TH.

7/23/2019 2012-11-14-12-PLANSE P.TH.

http://slidepdf.com/reader/full/2012-11-14-12-planse-pth 9/43

Page 10: 2012-11-14-12-PLANSE P.TH.

7/23/2019 2012-11-14-12-PLANSE P.TH.

http://slidepdf.com/reader/full/2012-11-14-12-planse-pth 10/43

Page 11: 2012-11-14-12-PLANSE P.TH.

7/23/2019 2012-11-14-12-PLANSE P.TH.

http://slidepdf.com/reader/full/2012-11-14-12-planse-pth 11/43

NOTA:

1. Orice modificare a prezentei planse se face numai cu acordul scris al proiectantului.2. Orice neconcordanta cu prevederile prezentei planse si situatia din amplasamentul podului, se va aduce la cunostinta proiectantului.

  2  :  3

-5,50 m

-1,10 m  • Strat aluvionar superficial

(nisip cu pietris neuniformmediu-marunt si umpluturi)

• Pietris neuniform (cu granulatie

preponderenta intre 70-100m) cu

bolovanis (peste 200mm) si nisip mare

4.40

60

   6   0

CLASA "E" DE INCARCARE - A30, V80C AT EG OR IA D E I MP OR TA NT A C - N OR MA LA - CONF. HGR 766

E XIGE NTA D E V ER IFIC AR E - A4 , B 2, D2 , C ON F. HGR 925 /1995GRA D IN TE NS ITATE SE IS MICA - 7 ,5 C ON F. S R 11100/1-93

Z ON A F Ks =0 ,1 6 s i T c=0 ,7 - CO NF . N P- 05 5- 01

2  :  3  

SFERT DE CON PEREAT

BETON C12/15 - 15 CM GROSIME

SFERT DE CON PEREATBETON C12/15 - 15 CM GROSIME

GABION (1,0 x 1,5 x 4,0) m

GABION (1,0 x 1,0 x 4,0) m

SALTEA DE GABIOANE(0,5 x 4,0 x 4,0) m

GABION (1,0 x 1,5 x 4,0) m

GABION (1,0 x 1,0 x 4,0) m

SALTEA DE GABIOANE(0,5 x 4,0 x 4,0) m

FUNDATIE SFERT DE CON

FUNDATIE SFERT DE CON

SCARA DE ACCES

PARAPET DE SIGURANTA

35 35

10

1:100

DENUMIRE PROIECT: 

DENUMIRE PLAN  : 

PROIECT NR.:

ŞEF PROIECT

DESENAT

VERIFICATOR

VERIFICAT

DATA:   2012

SCARA:

PLANSA NR.:

POD PROIECT

PROIECTANT GENERAL: 

FAZA: Proiect Tehnic

Reabilitare pod pe DN 15,

Km. 287+062,

peste raul Bicaz, la Bicaz,

 jud. Neamt

01

CERINTE A4, B2, D2

Nr.ref. / Data

11.201.50

2% 2%1%

7.80/27.80/220 1.50

1%

20

Parapet de tip foarte greu

Parapet pietonal

2.80 5.60 2.80

   3   1

60

Sectiune transversala

Culee Bicaz

Page 12: 2012-11-14-12-PLANSE P.TH.

7/23/2019 2012-11-14-12-PLANSE P.TH.

http://slidepdf.com/reader/full/2012-11-14-12-planse-pth 12/43

11

1:100

NOTA:

1. Orice modificare a prezentei planse se face numai cu acordul scris al proiectantului.2. Orice neconcordanta cu prevederile prezentei planse si situatia din amplasamentul podului, se va aduce la cunostinta proiectantului.

-5,50 m

-1,10 m  • Strat aluvionar superficial

(nisip cu pietris neuniform

mediu-marunt si umpluturi)

• Pietris neuniform (cu granulatie

preponderenta intre 70-100m) cu

bolovanis (peste 200mm) si nisip mare

4.40

65 60 6560

CLASA "E" DE INCARCARE - A30, V80

CATEGORIA DE IMPORTANTA C - NORMALA - CONF. HGR 766

EXI GENTA DE VER IFI CARE - A4, B2, D2, CONF. HGR 925/1995

GRAD INTENSITATE SEISMICA - 7 ,5 CONF. SR 11100 /1 -93

ZONA F Ks=0,16 si Tc=0,7 - CONF. NP-055-01

2  :  3  

 ARIPA EXISTENTA SFERT DE CON PEREAT

BETON C12/15 - 15 CM GROSIME

GABION (1,0 x 1,5 x 4,0) m

GABION (1,0 x 1,0 x 4,0) m

SALTEA DE GABIOANE(0,5 x 4,0 x 4,0) m

GABION (1,0 x 1,5 x 4,0) m

GABION (1,0 x 1,0 x 4,0) m

SALTEA DE GABIOANE(0,5 x 4,0 x 4,0) m

FUNDATIE SFERT DE CON

SCARA DE ACCES

PARAPET DE SIGURANTA

PEREU DIN BETON C12/15 15 CM GROSIME

DENUMIRE PROIECT: 

DENUMIRE PLAN  : 

PROIECT NR.:

ŞEF PROIECT

DESENAT

VERIFICATOR

VERIFICAT

DATA:   2012

SCARA:

PLANSA NR.:

POD PROIECT

PROIECTANT GENERAL: 

FAZA: Proiect Tehnic

Reabilitare pod pe DN 15,

Km. 287+062,

peste raul Bicaz, la Bicaz,

 jud. Neamt

01

CERINTE

 A4, B2, D2

Nr.ref. / Data

35 354.40

60

11.201.50

2% 2%1%

7.80/27.80/220 1.50

1%

20

Parapet de tip foarte greu

Parapet pietonal

2.80 5.60 2.80

   3   1

60

Sectiune transversala

Culee Piatra-Neamt

Page 13: 2012-11-14-12-PLANSE P.TH.

7/23/2019 2012-11-14-12-PLANSE P.TH.

http://slidepdf.com/reader/full/2012-11-14-12-planse-pth 13/43

NOTA:

1. Orice modificare a prezentei planse se face numai cu acordul scris al proiectantului.

2. Orice neconcordanta cu prevederile prezentei planse si situatia din amplasamentul podului, se va aduce la cunostinta proiectantului.

11.201.50

2% 2%1%

CLASA "E" DE INCARCARE - A30, V80

CATE GORIA DE IMPORTA NTA C - NORMALA - CONF. HGR 766

EXI GENTA DE VE RIFI CARE - A4, B2, D2, CONF. HGR 925/1995

GRAD INTENSITATE SEISMICA - 7 ,5 CONF. SR 11100 /1 -93

ZONA F Ks=0,16 si Tc=0,7 - CONF. NP-055-01

2  :  3  

 ARIPA EXISTENTA SFERT DE CON PEREAT

BETON C12/15 - 15 CM GROSIME

SCARA DE ACCES

PARAPET DE SIGURANTA

FUNDATIESFERT DE CON

1:100

DENUMIRE PROIECT: 

DENUMIRE PLAN  : 

PROIECT NR.:

ŞEF PROIECT

DESENAT

VERIFICATOR

VERIFICAT

DATA:   2012

SCARA:

PLANSA NR.:

POD PROIECT

PROIECTANT GENERAL: 

FAZA: Proiect Tehnic

Reabilitare pod pe DN 15,

Km. 287+062,

peste raul Bicaz, la Bicaz,

 jud. Neamt

01

CERINTE

 A4, B2, D2

Nr.ref. / Data

7.80/27.80/2

FUNDATIECASIU SI SCARA DE ACCES

12

20 1.50

1%

20

Parapet de tip foarte greu

Parapet pietonal

2.80 5.60 2.80

   3   1

Sectiune transversalapod dalat

Page 14: 2012-11-14-12-PLANSE P.TH.

7/23/2019 2012-11-14-12-PLANSE P.TH.

http://slidepdf.com/reader/full/2012-11-14-12-planse-pth 14/43

Page 15: 2012-11-14-12-PLANSE P.TH.

7/23/2019 2012-11-14-12-PLANSE P.TH.

http://slidepdf.com/reader/full/2012-11-14-12-planse-pth 15/43

Page 16: 2012-11-14-12-PLANSE P.TH.

7/23/2019 2012-11-14-12-PLANSE P.TH.

http://slidepdf.com/reader/full/2012-11-14-12-planse-pth 16/43

Page 17: 2012-11-14-12-PLANSE P.TH.

7/23/2019 2012-11-14-12-PLANSE P.TH.

http://slidepdf.com/reader/full/2012-11-14-12-planse-pth 17/43

Page 18: 2012-11-14-12-PLANSE P.TH.

7/23/2019 2012-11-14-12-PLANSE P.TH.

http://slidepdf.com/reader/full/2012-11-14-12-planse-pth 18/43

5 25 5

45

   4   5

   1   7

   2

   2   0

   2   0

30

CB

CB

B

70 3.00 704,40

30

   2

   2   0

   2   0

30

30

 A

 A

SECTIUNE A - A

SECTIUNE B - B

SECTIUNE C - C

SECTIUNE D - D

B

1

3

2

6

1

7.80

   4   0

1 1

 A

 A

B

B

B

1

3

2

NOTA:

1. Orice modificare a prezentei planse se face numai cu acordul scris al proiectantului.2. Orice neconcordanta cu prevederile prezentei planse si situatia din amplasamentul podului, se va aduce la cunostinta proiectantului.

1 PC 52 102Ø25 LMED=0,60

45 - 75

5

3 PC 52 10Ø12 L=7,90

   1   0

   1   0

7.70

2 PC 52 28Ø10 L=0,90

   1   5 25

30

   1   0

   1   0

   1   7

25

Caracteristicile betonuluiClasa de beton C20/25

Tip otel OB37, PC52

Clasa de expunere XC4

Grad de impermeabilitate P4

Grad de gelivitate G100

Tip de ciment CEM IDozaj minim de ciment 300 kg/m³

Raport apa ciment a/c 0,5000

MATERIALE:

BETON - C20/25

OTEL - PC52

DENUMIRE PROIECT: 

DENUMIRE PLAN  : 

PROIECT NR.:

ŞEF PROIECT

DESENAT

VERIFICATOR

VERIFICAT

DATA:   2012

SCARA:

PLANSA NR.:

POD PROIECT

PROIECTANT GENERAL: 

FAZA: Proiect Tehnic

Reabilitare pod pe DN 15,

Km. 287+062,

peste raul Bicaz, la Bicaz,

 jud. Neamt

01

CERINTE

 A4, B2, D2

Nr.ref. / Data

PLAN COFRAJ - ARMARE

 ANTRETOAZA DE CAPAT

17

1:50

2' PC 52 34Ø10 L=1,20

   1

   542

21    1

   0

   1   0

   1   1

1723

Page 19: 2012-11-14-12-PLANSE P.TH.

7/23/2019 2012-11-14-12-PLANSE P.TH.

http://slidepdf.com/reader/full/2012-11-14-12-planse-pth 19/43

Page 20: 2012-11-14-12-PLANSE P.TH.

7/23/2019 2012-11-14-12-PLANSE P.TH.

http://slidepdf.com/reader/full/2012-11-14-12-planse-pth 20/43

Page 21: 2012-11-14-12-PLANSE P.TH.

7/23/2019 2012-11-14-12-PLANSE P.TH.

http://slidepdf.com/reader/full/2012-11-14-12-planse-pth 21/43

Page 22: 2012-11-14-12-PLANSE P.TH.

7/23/2019 2012-11-14-12-PLANSE P.TH.

http://slidepdf.com/reader/full/2012-11-14-12-planse-pth 22/43

Page 23: 2012-11-14-12-PLANSE P.TH.

7/23/2019 2012-11-14-12-PLANSE P.TH.

http://slidepdf.com/reader/full/2012-11-14-12-planse-pth 23/43

Page 24: 2012-11-14-12-PLANSE P.TH.

7/23/2019 2012-11-14-12-PLANSE P.TH.

http://slidepdf.com/reader/full/2012-11-14-12-planse-pth 24/43

Page 25: 2012-11-14-12-PLANSE P.TH.

7/23/2019 2012-11-14-12-PLANSE P.TH.

http://slidepdf.com/reader/full/2012-11-14-12-planse-pth 25/43

Page 26: 2012-11-14-12-PLANSE P.TH.

7/23/2019 2012-11-14-12-PLANSE P.TH.

http://slidepdf.com/reader/full/2012-11-14-12-planse-pth 26/43

Page 27: 2012-11-14-12-PLANSE P.TH.

7/23/2019 2012-11-14-12-PLANSE P.TH.

http://slidepdf.com/reader/full/2012-11-14-12-planse-pth 27/43

Page 28: 2012-11-14-12-PLANSE P.TH.

7/23/2019 2012-11-14-12-PLANSE P.TH.

http://slidepdf.com/reader/full/2012-11-14-12-planse-pth 28/43

1 2

3

2

1

3.80

 3. 8 0

   1   3

1

2

3

PC52 26Ø12 L=8,151

   2   0

1       0       

10

   1   0

   1   0

4.90

PC52 40Ø12 L=5,102

   2   0

   2   0

40

 1 0  1  0  

OB37 9Ø8 L=1.003

M Ø n L

PC52

Ø8 Ø12

1

2

3

Lungimi pe diamatre m

Greutati pe metru kg/m

Greutati pe diametre kg/Ø

12 26 8,15 211,90

12 40 5,10

8 9 1,00 9,00

9,00

0,395 0,888

4,00 370,00

EXTRAS DE ARMARE PENTRU 1 PLACA DE RACORDARE

Pentru 2 placi de racordare :OB37 - 4,00 x 2 = 8,00 kg

PC52 - 370 x 2 = 740,00 kg

204,00

415,90

OB37

3.90

   5 .   0

   0

   3   0

   2   2

22-3020 20 2020 202020 20

   2

   0

   2   0

   2   0

   2   0

   S   E   C

   T   I   U   N   E

   C   -

   C

SECTIUNE B - B

SECTIUNE A - A

 A A

 A

B B B B

C

C

C

 A

PLAN COFR AJ-ARMARE

 DAL A DE RACORDARE

Observatie:

1. Orice modificare a prezentei planse se face numai cu acordul scris al proiectantului.

2. Orice neconcordanta cu prevederile prezentei planse si situatia din amplasamentul podului,

 se va aduce la cunostinta proiectantului.

CLASA DE BETON: C18/22.5

TIP OTEL: OB37, PC52

MATERIALE:

Caracteristicile betonuluiClasa de beton C18/22.5

Tip otel OB37, PC52

Clasa de expunere XF3

Grad de impermeabilitate P8

Grad de gelivitate G100Tip de ciment CEM I

Dozaj minim de ciment 300 kg/m³

Raport apa ciment a/c 0,5000

DENUMIRE PROIECT: 

DENUMIRE PLAN  : 

PROIECT NR.:

ŞEF PROIECT

DESENAT

VERIFICATOR

VERIFICAT

DATA:   2012

SCARA:

PLANSA NR.:

POD PROIECT

PROIECTANT GENERAL: 

FAZA: Proiect Tehnic

Reabilitare pod pe DN 15,

Km. 287+062,

peste raul Bicaz, la Bicaz,

 jud. Neamt

01

CERINTE A4, B2, D2

Nr.ref. / Data

27

1:50

Page 29: 2012-11-14-12-PLANSE P.TH.

7/23/2019 2012-11-14-12-PLANSE P.TH.

http://slidepdf.com/reader/full/2012-11-14-12-planse-pth 29/43

   5   0

1

B

B

SECTIUNE A - A

2

50

3

2

1

15 20 20 2020 15202020

7.80

   5   0

1 OB37 40Ø10 L=1,75

   4   0

4 0 

40

   4   0

3.85

   1   0

   1   0

2 PC52 12Ø16 L=8,35

SECTIUNE B - B

M Ø n L

OB 37

Ø 10

1

2

Lungimi pe diamatre m

Greutati pe metru kg/m

Greutati pe diametre kg/Ø

10 40 1,75

16 12 8,35

1,208

44,00

EXTRAS DE ARMARE PENTRU 1 GRINDA DE REZEMARE

PC 52

Ø 16

70,00 100,20

0,617

121,50

70,00

100,20

 A

 A

Observatie:

1. Orice modificare a prezentei planse se face numai cu acordul scris al proiectantului.

2. Orice neconcordanta cu prevederile prezentei planse si situatia din amplasamentul podului,

 se va aduce la cunostinta proiectantului. PLAN COFRAJ-ARMAREGRINDA DE REZEMARE

CLASA DE BETON: C18/22.5

TIP OTEL: OB37, PC52

MATERIALE:

Caracteristicile betonuluiClasa de beton C18/22.5

Tip otel OB37, PC52

Clasa de expunere XF3

Grad de impermeabilitate P8

Grad de gelivitate G100Tip de ciment CEM I

Dozaj minim de ciment 300 kg/m³

Raport apa ciment a/c 0,5000

DENUMIRE PROIECT: 

DENUMIRE PLAN  : 

PROIECT NR.:

ŞEF PROIECT

DESENAT

VERIFICATOR

VERIFICAT

DATA:   2012

SCARA:

PLANSA NR.:

POD PROIECT

PROIECTANT GENERAL: 

FAZA: Proiect Tehnic

Reabilitare pod pe DN 15,

Km. 287+062,

peste raul Bicaz, la Bicaz,

 jud. Neamt

01

CERINTE

 A4, B2, D2

Nr.ref. / Data

28

1:50

4,30

45

Page 30: 2012-11-14-12-PLANSE P.TH.

7/23/2019 2012-11-14-12-PLANSE P.TH.

http://slidepdf.com/reader/full/2012-11-14-12-planse-pth 30/43

SECTIUNE TRANSVERSALA

Sc. 1:50

DETALIU "A"

Sc. 1:25

4.40

65 65

35 354.40

11.201.50

2% 2%1%

7.80/27.80/220 1.50

1%

20

2.80 5.60 2.80

   3   1

DETALIU "A"

1.50

1%

20

 Placa de suprabetonare

Sapa suport mortar M100 - 2 cm grosime

 Hidroizolatie - 1 cm grosime

 Sapa protectie (beton C20/25) armata cu pasa

 tip Buzau (8x100x100) - 5 cm grosime

BAP - 6 cm grosime

2%6%

Cordon CELOCHIT

Gura de scurgere tip T1G1

Colier de prindere

 gura de scurgere

 Mortar de poza Tub PVC Ø110 mm

Cordon CELOCHIT

Cordon CELOCHIT

 Asfalt turnat - 2 cm

Parapet pietonal

 Parapet de siguranta de tip foarte greu

 Beton de umplutura C8/10

1.04

Page 31: 2012-11-14-12-PLANSE P.TH.

7/23/2019 2012-11-14-12-PLANSE P.TH.

http://slidepdf.com/reader/full/2012-11-14-12-planse-pth 31/43

7.50

 A

 A

16

12

16

12

1

2

3

4

5

6

15 18 9 820

NOTA:

1. Orice modificare a prevederilor prezentei planse se face numai

25

24

23

22

21

B2% 2%

1 2 3 4 5 6 151% 1%

B19 18 19

3127

10 131114

10 3 127

1013 1114

16

18

10

LEGENDA: 

1 - Strat de uzura din beton asfaltic cu agregate marunte in grosimede 6 cm (BA 16);

2 - Strat din anrobate bituminoase in grosime de 15-30 cm (AB1);3 - Sapa de protectie sin beton de ciment C20/25, armata cu plasa tip Buzau (10x10x8);4 - Hidroizolatie lipita la cald 1 cm grosime;5 - Sapa suport din mortar de ciment M100 2 cm grosime;6 - Dala de racordare existenta;7 - Strat de asfalt turnat in grosime de 2 cm;8 - Grinda de rezemare dala de racordare existenta;9 - Prism de piatra sparta existent;10 Cordon celochit (3x3) cm

25 25

Page 32: 2012-11-14-12-PLANSE P.TH.

7/23/2019 2012-11-14-12-PLANSE P.TH.

http://slidepdf.com/reader/full/2012-11-14-12-planse-pth 32/43

Page 33: 2012-11-14-12-PLANSE P.TH.

7/23/2019 2012-11-14-12-PLANSE P.TH.

http://slidepdf.com/reader/full/2012-11-14-12-planse-pth 33/43

Page 34: 2012-11-14-12-PLANSE P.TH.

7/23/2019 2012-11-14-12-PLANSE P.TH.

http://slidepdf.com/reader/full/2012-11-14-12-planse-pth 34/43

Page 35: 2012-11-14-12-PLANSE P.TH.

7/23/2019 2012-11-14-12-PLANSE P.TH.

http://slidepdf.com/reader/full/2012-11-14-12-planse-pth 35/43

Page 36: 2012-11-14-12-PLANSE P.TH.

7/23/2019 2012-11-14-12-PLANSE P.TH.

http://slidepdf.com/reader/full/2012-11-14-12-planse-pth 36/43

Page 37: 2012-11-14-12-PLANSE P.TH.

7/23/2019 2012-11-14-12-PLANSE P.TH.

http://slidepdf.com/reader/full/2012-11-14-12-planse-pth 37/43

Page 38: 2012-11-14-12-PLANSE P.TH.

7/23/2019 2012-11-14-12-PLANSE P.TH.

http://slidepdf.com/reader/full/2012-11-14-12-planse-pth 38/43

Page 39: 2012-11-14-12-PLANSE P.TH.

7/23/2019 2012-11-14-12-PLANSE P.TH.

http://slidepdf.com/reader/full/2012-11-14-12-planse-pth 39/43

Page 40: 2012-11-14-12-PLANSE P.TH.

7/23/2019 2012-11-14-12-PLANSE P.TH.

http://slidepdf.com/reader/full/2012-11-14-12-planse-pth 40/43

Page 41: 2012-11-14-12-PLANSE P.TH.

7/23/2019 2012-11-14-12-PLANSE P.TH.

http://slidepdf.com/reader/full/2012-11-14-12-planse-pth 41/43

Page 42: 2012-11-14-12-PLANSE P.TH.

7/23/2019 2012-11-14-12-PLANSE P.TH.

http://slidepdf.com/reader/full/2012-11-14-12-planse-pth 42/43

NOTA:

1. Orice neconcordanta constatata intre prevederile prezentei planse si situatia din amplasamentul podului, se aduce imediat la cunostinta proiectantului.

2. Orice modificare a prevederilor prezentei planse se face numai cu acordul scris al proiectantului.

PROFIL TRANSVERSAL TIP PE

RAMPE DE ACCES

LEGENDA: 

1 - 4 cm (BA 16);2 - 5 cm (BADPC 25);3 - 8 cm (AB2);4 - Strat de agregate naturale stabilizate cu 6% ciment - 23 cm;5 - Strat de fundatie din balast - 25 cm;7 - Parapet de protectie de tip semigreu;

8 - Fundatie parapet pietonal din beton de ciment C12/15, h=60 cm, l=40 cm, L=40 cm;9 - Pamant natural.10 - Pavele 6 cm11 - Pat de nisip 5 cm12 - Strat din balast 10 cm13 - Bordura14 - Fundatie Bordura15 - Bordura

DENUMIRE PROIECT: 

DENUMIRE PLAN  : 

PROIECT NR.:

ŞEF PROIECT

DESENAT

VERIFICATOR

VERIFICAT

DATA:   2012

SCARA:

PLANSA NR.:

POD PROIECT

PROIECTANT GENERAL: 

FAZA: Proiect Tehnic

Reabilitare pod pe DN 15,

Km. 287+062,

peste raul Bicaz, la Bicaz,

 jud. Neamt

01

CERINTE

 A4, B2, D2

Nr.ref. / Data

41

1:50

2.50%1.00 %

Trotuar Parte carosabila1.50 3.90

2.50%1.00 %

Trotuar 1.503.90

1 2 3 45

8

7

9

101112

1314

1514

7

Page 43: 2012-11-14-12-PLANSE P.TH.

7/23/2019 2012-11-14-12-PLANSE P.TH.

http://slidepdf.com/reader/full/2012-11-14-12-planse-pth 43/43