Download - deviz analitic

Transcript
Page 1: deviz analitic

Sistem informatic proiectat de SofteH Plus srl. Tel:323.78.37 Data listarii:04/07/2023 Pag.1

Executant 0012 SC. Moldconstruct

Investitie 112 Reabilitare drum comunal

Obiect 1231 Infrastructura Deviz 0000 Zid de sprijin Deviz analiticPozitie Cod resursa U/M Cantitate Sp.mat Pret materiale Val. materiale Corectii Sp.man Pret manopera Val. manopera Denumire resursa Sp.uti Pret utilaj Val. utilaj Observatii Pret transport Val. transport Liste anexa Nr.ore/UM TOTAL A

Greutate/UM Greutate totala

1 TSC03F1 82 SUTE MC 5.90000 0.00 0.00

0.00 0.00

SAPAT.MEC.CU EXC.DE 0,41-0,7 MC IN PAM.CU UMIDITAT 306.96 1,811.04

E NATURAL DESC.AUTO.TEREN CAT 2 0.00 0.00

0.00 1,811.04

0.00 0.00

2 TRA01A05 82 TONE 1,062.50000 0.00 0.00

0.00 0.00

TRANSPORTUL RUTIER AL MATERIALELOR,SEMIFABRICATELO 0.00 0.00

R CU AUTOBASCULANTA PE DIST.= 5 KM. $ 11.05 11,740.63

0.00 11,740.63

0.00 0.00

3 TSA05C1 82 M CUB 41.60000 0.00 0.00

15.62 649.88

SAP.MAN.IN SPATII LIMIT.PESTE 1M CU TALUZ INCL.IN 0.00 0.00

PAM.CU UMID.NAT.ADINC.0,0-2M,T.TARE 0.00 0.00

2.14 649.88

0.00 0.00

4 TRB01C14 82 TONE 74.90000 0.00 0.00

5.65 423.19

TRANSPORTUL MATERIALELOR CU ROABA PE PNEURI INC AR 0.00 0.00

UNCARE DESC RASTURNARE GRUP1-3 DISTANTA 40M $ 0.00 0.00

0.77 423.19

0.00 0.00

5 CA01B1 82 M CUB 10.40000 0.18 1.87

20.71 215.43

TURNARE BETON SIMPLU IN FUNDATII(CONTINUE,IZOLATE) 1.34 13.92

SI SOCLURI CU VOLUM >3MC,SI IN ZIDURI DE SPRIJIN 0.00 0.00

2.73 231.22

0.10 1.04

6 CZ0101A1 82 M CUB 10.80000 74.91 809.07

0.68 7.35

PREPARARE BETON B25 CU BALAST,GRANULATIA<31MM,CU C 8.13 87.77

IMENT F25,IN INSTALATII CENTRALIZATE $ 0.00 0.00

0.09 904.20

2.54 27.48

7 CC02A1 82 KG 16,640.00000 0.12 1,933.07

0.41 6,760.50

MONTARE ARMAT LA CONSTR H<35M DIN BARE D<8MM IN PE 0.00 0.00

RETI DIAFRAGME CU DIST DIN PLASTIC 0.00 0.00

0.05 8,693.57

Page 2: deviz analitic

Sistem informatic proiectat de SofteH Plus srl. Tel:323.78.37 Data listarii:04/07/2023 Pag.2

Pozitie Cod resursa U/M Cantitate Sp.mat Pret materiale Val. materiale Corectii Sp.man Pret manopera Val. manopera Denumire resursa Sp.uti Pret utilaj Val. utilaj Observatii Pret transport Val. transport Liste anexa Nr.ore/UM TOTAL A

Greutate/UM Greutate totala

0.00 0.22

Page 3: deviz analitic

Sistem informatic proiectat de SofteH Plus srl. Tel:323.78.37 Data listarii:04/07/2023 Pag.3

Pozitie Cod resursa U/M Cantitate Sp.mat Pret materiale Val. materiale Corectii Sp.man Pret manopera Val. manopera Denumire resursa Sp.uti Pret utilaj Val. utilaj Observatii Pret transport Val. transport Liste anexa Nr.ore/UM TOTAL A

Greutate/UM Greutate totala

8 CB12A1 82 MP 166.54000 5.53 921.04

7.59 1,263.91

COFRAJE PT BETON IN PERETI DIAFRAGME DIN PANOURI L 0.00 0.00

A CTII H<20M CU PLANSEE MONOLIT PLACAJ 8 MM 0.00 0.00

0.88 2,184.95

0.00 0.40

9 CA02D1 82 M CUB 128.40000 0.18 23.11

23.83 3,059.77

TURNARE BETON ARMAT IN FUNDATII CONTINUE,RADIERE S 2.01 257.84

I PERETI SUB COTA ZERO A CONSTR.CU GROS.> 30CM 0.00 0.00

3.02 3,340.73

0.10 12.84

10 CZ0108A1 82 M CUB 132.25000 260.88 34,500.91

0.68 90.04

PREPARARE BETON B300 AGREG.GRELE < 7MM CIMENT P40 8.13 1,074.78

PT.MONOLITIZARI,PIESE SPECIALE,IN INST.CENTRALIZ.$ 0.00 0.00

0.09 35,665.73

2.43 321.59

11 TSD01C1 82 M CUB 124.00000 0.00 0.00

3.16 391.95

IMPRASTIEREA CU LOPATA A PAMINT.AFINAT,STRAT UNIFO 0.00 0.00

RM 10-30CM.GROS CU SFARIM.BULG.TEREN TARE 0.00 0.00

0.43 391.95

0.00 0.00

12 TSD04D1 82 M CUB 124.00000 0.18 22.32

4.94 613.02

COMPACTAREA CU MAI.DE MINA A UMPLUT.EXECUT.PE STRA 0.00 0.00

T.CU UDAREA FIEC.STRAT DE 20CM GROS.T.COEZIV 0.00 0.00

0.67 635.34

0.10 12.40

13 TRA01A10 82 TONE 223.20000 0.00 0.00

0.00 0.00

TRANSPORTUL RUTIER AL MATERIALELOR,SEMIFABRICATELO 0.00 0.00

R CU AUTOBASCULANTA PE DIST.= 10 KM. $ 17.55 3,917.16

0.00 3,917.16

0.00 0.00

14 TRA06A10 82 TONE 343.35000 0.00 0.00

0.00 0.00

TRANSPORTUL RUTIER AL BETONULUI-MORTARULUI CU AUTO 0.00 0.00

BETONIERA DE 5,5MC DIST. =10KM $ 21.45 7,364.86

0.00 7,364.86

0.00 0.00Greutate totala 375.963455 Total materiale 38,211.40

Total ore 1658 Total manopera 13,475.04Total utilaj 3,245.35

Total transport 23,022.65Total A 77,954.45

Page 4: deviz analitic

Sistem informatic proiectat de SofteH Plus srl. Tel:323.78.37 Data listarii:04/07/2023 Pag.4

Pozitie Cod resursa U/M Cantitate Sp.mat Pret materiale Val. materiale Corectii Sp.man Pret manopera Val. manopera Denumire resursa Sp.uti Pret utilaj Val. utilaj Observatii Pret transport Val. transport Liste anexa Nr.ore/UM TOTAL A

Greutate/UM Greutate totala

OFERTANT