236
Data: 05.11.2012 Codul culorilor ATR emise de: Transelectrica Enel Dobrogea E.ON Moldova CEZ Enel Muntenia Enel Banat ATR Expirate ATR Noi Denumire investitor Judetul 1 Energia Mileniului III SRL Casimcea Tulcea 2 SC Eolica Dobrogea SRL Constanta 3 SC BTWM Mitoc Mitoc Botosani 4 SC Eolica Vaslui SRL Bunesti Averesti Vaslui 5 SC Compania Eoliana SA Smardan Galati 6 SC Biota Wind Power SRL Tulcea 2 Tulcea 7 SC AVELLANA COM SRL Tulcea 1 Tulcea 8 SC DANUBE GREEN POWER SRL Somova-1 Tulcea 9 SC ELECTRICE RENOVATA VISION SRL Somova-2 Tulcea Electrica Transilvania Nord Electrica Transilvania sud Electrica Muntenia Nord Nr. crt Denumire centrale electrice eoliene Eolica(Cogealac) etapa 2

Transcript of Situatie Avize ATR

Data: 05.11.2012Codul culorilor ATR emise de:

Transelectrica Enel DobrogeaE.ON Moldova

CEZ

Electrica Muntenia Nord

Enel MunteniaEnel BanatATR ExpirateATR Noi

Denumire investitor Judetul

1

Energia Mileniului III SRL Casimcea Tulcea 99

2

SC Eolica Dobrogea SRL Constanta 600

3

SC BTWM Mitoc Mitoc Botosani 40

4SC Eolica Vaslui SRL Bunesti Averesti Vaslui 297

5

SC Compania Eoliana SA Smardan Galati 42

6SC Biota Wind Power SRL Tulcea 2 Tulcea 11.5

7

SC AVELLANA COM SRL Tulcea 1 Tulcea 11.5

8

SC DANUBE GREEN POWER SRL Somova-1 Tulcea 30

9

Somova-2 Tulcea 33

Electrica Transilvania NordElectrica Transilvania sud

Nr. crt

Denumire centrale electrice eoliene

Putere instalata

(MW)

Eolica(Cogealac) etapa 2

SC ELECTRICE RENOVATA VISION SRL

10

Somova-3 Tulcea 33

11

Somova-4 Tulcea 33

12

SC DANUBE GREEN ENERGY SRL Somova-5 Tulcea 33

13

SC Compania Eoliana SA Frecatei Tulcea 87

14

SC Beidaud Energie Eoliana SRL Beidaud Tulcea 54

15

BAIA Energie Eoliana Baia Tulcea 63

16

SC Targusor Wind Farm SA Constanta 82.8

17

South Wind SRL South Wind Constanta 117

18

South Wind Viroaga SRL South Wind Viroaga Constanta 117

19

South Wind Cerchezu SRL South Wind Cerchezu Constanta 117

SC ELECTRICE RENOVATA VISION SOMOVA SRL

SC ELECTRICE RENOVATA VISION SOMOVA ENERGIE SRL

Nicolae Balcescu - Targusor

20

South Wind Dumbraveni SRL South Wind Dumbraveni Constanta 51

21

Samowind SRL Beidaud Tulcea 300

22

Mitoc Botosani 100

23

Energy Sky SRL Frecatei Tulcea 141

24

Gamesa Energy Romania SRL Baraganu Constanta 98

25

Gamesa Energy Romania SRL Independenta Constanta 88

26Top Wind SRL Top Wind Constanta 84

27Wind Flor Topalu SRL Wind Flor Topalu Constanta 81

28Arca Green Energy SRL AGE Crucea Constanta 84

29SEA Wind Renergys SRL Ciocarlia Constanta 50

30Wind SOL Power Energy SRL Ciprian Porumbescu 1 Suceava 27

31SC Wind Energy Management SRL Ilisesti Suceava 39

32SC Wind Energy Expertise SRL Horodniceni-1 Suceava 51

33SC Wind Energy Power Service IS SRL Capu Campului Suceava 21

34SC Wind Energy Distribution SRL Berchisesti Suceava 24

35SC WIND ENERGY CONCEPT SRL Ciprian Porumbescu 2 Suceava 51

International Wind Energy Botosani SRL

36Horodniceni-2 Suceava 72

37SC Wind Energy Omnia SRL Dragoiesti-2 Suceava 15

38SC Wind Energy Construction SRL Moara Suceava 45

39SC Wind Energy Smart SRL Stroiesti Suceava 60

40SC WIND ENERGY PROJECT SRL Dragoiesti-1 Suceava 24

41SC Delta Green Energy SRL Daeni-1 Tulcea 54

42SC Delta Park SRL Daeni-2 Tulcea 51

43 SC Wind Power Experts Group SRLLupeni-1 Hunedoara 99

44 SC Wind Power Experts Group SRLLupeni-2 Hunedoara 99

45SC The Way of Energy SRL Beidaud Constanta 105

46SC AMPLUS ENERGO SRL Scanteiesti Galati 249

47SC TECON SRL Stalpu Buzau 399

48SC IALOMITA POWER SRL Facaeni Ialomita 300

49SC TERRA ROMANIA SPV ONE SRL Viisoara Botosani 471

50SC Eoliene Albastre SRL Tulcea Tulcea 9

51SC Wind Wings SRL Valea Nucarilor 1 Tulcea 5

52SC Eurosoft Comunication SRL Valea Nucarilor 2 Tulcea 5

53SC Wind Garoafa Development SRL Garoafa 1 Vrancea 79.8

54SC Marasesti Wind SRL Maraseti Vrancea 84

55SC Wind Energy Strategy SRL Ciocile Braila 120

56SC Wind Energy Supply SRL Rosiori Braila 84

57SC Wind Energy Advance Tech SRL Largu Braila 84

58SC Wind Energy Green Project SRL Rusetu-1 Buzau 45

SC WIND ENERGY POWER BUSINESS CL SRL

59SC Wind Energy Green Project SRL Rusetu-2 Buzau 33

60SC Van Consult Energy SRL Ulmu Braila 114

61SC Energy Hermannstadt SRL Crucea-Baltagesti Constanta 90

62Gamesa Energy Romania SRL Baraganu-3 Constanta 36

63Gamesa Energy Romania SRL Osmancea Constanta 112.5

64Gamesa Energy Romania SRL Topraisar Constanta 103.5

65SC Wind Energy Equipment SRL Dudesti Braila 84

66SC ELECTRICOM SA Giurgeni Ialomita 33

67SC RENEWABLE Slobozia Nord SRL Giurgeni Nord-2 Ialomita 90

68SC RENEWABLE Slobozia Vest SRL Giurgeni Vest Ialomita 51

69SC RENEWABLE Slobozia Est SRL Giurgeni Est Ialomita 102

70SC RENEWABLE Slobozia Nord SRL Giurgeni Nord-1 Ialomita 57

71SC Eolian-Med SRL Valea Dacilor Constanta 51

72BOGARIS ENERGY ROM Facaeni, Vladeni Ialomita 52

73HARSOVA 40 S.R.L. Harsova Constanta 40

74Eoliene SRL Dulcesti Constanta 5

75EAST DATA S.R.L. Tataru Constanta 8

76 FEFRAN REAL ESTATES SRL Deleni Constanta 45

77 EVN WIND POWER&CONSTRUCTION Satu Nou Constanta 9

78

EVN WIND POWER&CONSTRUCTION Mircea Voda Constanta 9

79

COMPLEX DELTA SRL CASIMCEA Tulcea 27

80

START GEOVIL Targusor Constanta 18

81

ENERGO INVEST Platonesti Ialomita 40

82

EOL INDUSTRIES SRL Baia Tulcea 33

83 EOLIAN PECINEAGA SRL

Pecineaga Constanta 77.5

84 OMV PETROM WIND POWER SRL

Dorobantu Constanta 54

85 GENERAL CONCRETE CERNAVODA SR

Rasova Constanta 10

86 ITALENERGY & TRADE SRL Crucea Constanta 9

87 R.A.J.D.P. CTA

TOPRAISAR Constanta 0.02

88

PNE WIND ROMANIA SRL Poarta Alba Constanta 84

89

Oras Negru Voda Negru Voda Constanta 0.2

90

PRIMARIA COMUNEI CORBU Corbu Constanta 0.2

91

BODICONSTRUCT GRUP SRL Gheorghe Doja Calarasi 54

92

IDU CORNELIU Eforie Nord Constanta 0.01

93

MINAGRO SRL Satu Nou Tulcea 4

94

ZAR TWINS ENERGY SRL Siminoc Constanta 45

95

COMUNA TUZLA Tuzla Constanta 0.2

96

COMUNA OSTROV Ostrov Constanta 0.2

97

COMUNA CUMPANA Cumpana Constanta 0.2

98Homoraciu Prahova 30

99

SC ENVICONS WIND SRL Beresti Meria Galati 30

SC HERMES ENERGY INTERNATIONL SRL

100

SOCOMIZO CONSTRUCT SRL Tataru Prahova 2.5

101

Naeni Buzau 2.5

102

GENERACION EOLICA DACIA SRL Cudalbi Galati 60

103

BRAILA WINDS EXPERT SRL Scortaru Nou Braila 8

104

PANC ENERGY SRL Panciu Vrancea 10

105

SIX WINGS SRL Pechea Galati 6.2

106

VECTOR WIND EXPERT SRL Frumusita Galati 3

107 SC DUCIPAL ELECTRIC SRL Iasi 9

108 SC ACK SRLSticlaria

Iasi 40

109 S.C. NORTH BRIDGE FOUR S.R.L.Oltenesti

Vaslui 51

110 S.C. JDER ENERGY S.R.L. Banca

Vaslui 30

111 S.C. NORTH BRIDGE ONE S.R.L.Falciu

Vaslui 51

112 S.C. MOLDOVA EOLIAN S.R.L.Ruginoasa

Iasi 60

113 S.C. INTO ENERGY S.R.L. Popesti Iasi 9

114 S.C. MOLDREGENERABILE S.A. MIROSLOVESTI Iasi 48

GREEN ENERGY CONSULTANCY & INVESTMENTS

Siretel-Vanatori (CEE Vanatori 2)

115

SC VIENTOS SRL Mehedinti 45.00

116 SIFEE ENERGY SRL

Ciclova Caras-Severin 75

117 ENI ROMANIA S.R.L.

Vladimirescu Arad 0.02

118 SURAKI SRL

Rsuceni Giurgiu 30

119

RADU BUJOREL Bucuresti - 0.0032

120

Cristian-Rasinari Poplaca Sibiu 87.000

121 SC ENERGO PROIECT SRL Curcubata Mare Bihor 11.5

122

SC COMPANIA EOLIANA SA Eoliana Salonta Bihor 9.72

TOTAL ATR VALABILE 8039.57

Racordare centrala eoliana Livezile, judetul Mehedinti

SC SIFEE WIND ENERGY SRL - Etapa I

U(kV) Staţia de racord Comentariu

400 Rahmanu-Casimcea

400 Tariverde

110 Suceava

220 Munteni

110 Smardan

110 Tulcea Vest

110 Tulcea Vest

400 Statie noua 400kV

400 Statie noua 400kV

Racordare in noua statie 110/400 kV denumita Rahmanu-Casimcea, in urmatoarea solutie:

- statie noua de 400/110 kV Rahmanu-Casimcea ;- LES 400kV de cca. 0,3 km de racord a noii statii 400/110kV Rahmanu-Casimcea in viitoarea statie 400 kV Rahmanu si echiparea celulei de 400 kV din spatiul liber al acestei statii;Se racordeaza la RET prin intermediul unei statii 400/220 Tariverde prin intermedfiul a 2 AT 550MVA (in final 3x550)

Statia este rcaordata i/e in LEA 400kV Cta Nord - Tulcea Vest

Se racordeaza la RET printr-o LEA 110kV de cca.96 km la bara de 110 kV a statiei Suceava.Racordare la reţeaua electrică de transport in statia 220kV

Munteni. Lucrarile necesare pentru racordarea CEE 297MW Bunesti -

Averesti sunt :- Racordarea BCC 110kV a CEE printr-un AT 110kV / 220kV

(330MVA) bloc cu o LEA 400kV, functionand la 220kV, de cca. 35 km, cu sectiunea 3X300 mmp, conectata in bara de

220kV Munteni.- Extinderea cu o celula de 220 kV a statiei Munteni.

se racordează la reţeaua electrică de transport, prin intermediul unei LEA 110 kV s.c., in lungime de cca 4 km, in

statia 400/110kV Smardan

racordarea prin LEA/LES L=5km, la bara statiei 110 kV Tulcea Vest

racordarea prin LEA/LES L=5km, la bara statiei 110 kV Tulcea Vest

Se racordeaza la RET printr-o statie noua 400/110 kV.Statia 400/110 kV este racordata intrare-iesire in linia 400kV Tulcea-

Tariverde.

Se racordeaza la RET printr-o statie noua 400/110 kV.Statia 400/110 kV este racordata intrare-iesire in linia 400kV Tulcea-

Tariverde.

400 Statie noua 400kV

400 Statie noua 400kV

400 Statie noua 400kV

110 Isaccea

400 Stupina

400 Stupina

400 Stupina

400 Deleni

400 Deleni

400 Deleni

Se racordeaza la RET printr-o statie noua 400/110 kV.Statia 400/110 kV este racordata intrare-iesire in linia 400kV Tulcea-

Tariverde.

Se racordeaza la RET printr-o statie noua 400/110 kV.Statia 400/110 kV este racordata intrare-iesire in linia 400kV Tulcea-

Tariverde.

Se racordeaza la RET printr-o statie noua 400/110 kV.Statia 400/110 kV este racordata intrare-iesire in linia 400kV Tulcea-

Tariverde.

Se racordeaza la RET printr-o LES 110kV in lungime de cca.25 km la bara 110kV a statiei 400/110 kV Isaccea

Racordarea prin LES 400kV L=0.2km, in extinderea statiei Stupina bara 400kV.Racordare la reţeaua electrică de

transport prin extinderea statiei Stupina incadrata intrare – ieşire în LEA 400 (750) kV Isaccea – Medgidia Sud - Varna,

TR 250MVA 110/400kV, extindere bara 400kV Stupina.Racordare la reţeaua electrică de transport prin extinderea

statiei Stupina incadrata intrare – ieşire în LEA 400 (750) kV Isaccea – Medgidia Sud - Varna, TR 250MVA 110/400kV,

extindere bara 400kV Stupina.

se racordeaza la RET prin intermediul a 2 transformatoare 2X250MVA, 400/110 kV,in noua statie electrica 400/110kV

Stupina (GIS) incadrata intrare -iesire in LEA 750 kV (400 kV) Isaccea - Medgidia Sud -Varna printr-o LEA 400kV d.c. de

cca.0.5 km.Se racordeaza la RET prin intermediul a 2 transf 110/400 kV -

250MVA in noua statie electrica 400kV ,incadrata intrare-iesire in LEA 400(750)kV Isaccea-Medgidia Sud-Varna si in

LEA 400kV Isaccea-Dobrudja

Se racordeaza la RET prin intermediul a 2 transf 110/400 kV -250MVA in noua statie electrica 400kV ,incadrata intrare-

iesire in LEA 400(750)kV Isaccea-Medgidia Sud-Varna si in LEA 400kV Isaccea-Dobrudja

Se racordeaza la RET prin intermediul a 2 transf 110/400 kV -250MVA in noua statie electrica 400kV ,incadrata intrare-

iesire in LEA 400(750)kV Isaccea-Medgidia Sud-Varna si in LEA 400kV Isaccea-Dobrudja

400 Deleni

400 Tariverde

110 Suceava

400 Statie noua 400kV

400 Baraganu

400 Baraganu

400 Stupina

400 Stupina

400 Stupina

400 Statie noua 400kV

400 Horodniceni

400 Horodniceni

400 Horodniceni

400 Horodniceni

400 Horodniceni

400 Horodniceni

Se racordeaza la RET prin intermediul a 2 transf 110/400 kV -250MVA in noua statie electrica 400kV ,incadrata intrare-

iesire in LEA 400(750)kV Isaccea-Medgidia Sud-Varna si in LEA 400kV Isaccea-Dobrudja

se racordeaza la RET in statia 400kV Tariverde printr-o LEA 400 kV in lungime de aproximativ 15 km.Staţia 400 kV

Tariverde este racordată la RET, în sistem intrare – ieşire, în LEA 400 kV Constanţa Nord – Tulcea Vest.

Se racordeaza la RET printr-o LEA 110kV de cca.96 km la bara de 110 kV a statiei Suceava.

Se racordeaza la RET printr-o statie noua 400/110 kV.Statia 400/110 kV este racordata intrare-iesire in linia 400kV Tulcea-

Tariverde.

Racordare in statie noua 400kV Baraganu racordata intrare -iesire intr-o noua LEA 400kV Medgidia Sud - Constanta

Nord

Racordare in statie noua 400kV Baraganu racordata intrare -iesire intr-o noua LEA 400kV Medgidia Sud - Constanta

Nord

Racordare la RET prin intermediul unui transformator 400/110kV-275MVA in statia 400kV Stupina (extindere bara

400kV).Racordare la RET prin intermediul unui transformator

400/110kV-275MVA in statia 400kV Stupina (extindere bara 400kV).

Racordare la RET prin intermediul unui transformator 400/110kV-275MVA in statia 400kV Stupina (extindere bara

400kV).

Racordare intrare -iesire intr-o noua LEA 400kV Medgidia Sud-statie noua 400kV- Constanta Nord

Racordare la RET prin intermediul a 2 transformatoare 400/110 kV ,250MVA in statia noua 400/110kV Horodniceni . Etapa I

– (inainte de realizarea LEA 400kV Suceava-Gadalin) in statia 400/220/110 kV Suceava, prin racord LEA 400kV simplu circuit, in lungime totala de aproximativ 17,5 km, folosind traseul propus pentru viitoarea LEA 400 kV Suceava –

Gadalin;Etapa II – (dupa realizarea LEA 400kV Suceava-Gadalin) racord LEA dublu circuit, in lungime de cca. 0,5 km, intrare

iesire in LEA 400kV Suceava – Gadalin.

Racordare la RET prin intermediul a 2 transformatoare 400/110 kV ,250MVA in statia noua 400/110kV Horodniceni . Etapa I

– (inainte de realizarea LEA 400kV Suceava-Gadalin) in statia 400/220/110 kV Suceava, prin racord LEA 400kV simplu circuit, in lungime totala de aproximativ 17,5 km, folosind traseul propus pentru viitoarea LEA 400 kV Suceava –

Gadalin;Etapa II – (dupa realizarea LEA 400kV Suceava-Gadalin) racord LEA dublu circuit, in lungime de cca. 0,5 km, intrare

iesire in LEA 400kV Suceava – Gadalin.

Racordare la RET prin intermediul a 2 transformatoare 400/110 kV ,250MVA in statia noua 400/110kV Horodniceni . Etapa I

– (inainte de realizarea LEA 400kV Suceava-Gadalin) in statia 400/220/110 kV Suceava, prin racord LEA 400kV simplu circuit, in lungime totala de aproximativ 17,5 km, folosind traseul propus pentru viitoarea LEA 400 kV Suceava –

Gadalin;Etapa II – (dupa realizarea LEA 400kV Suceava-Gadalin) racord LEA dublu circuit, in lungime de cca. 0,5 km, intrare

iesire in LEA 400kV Suceava – Gadalin.

Racordare la RET prin intermediul a 2 transformatoare 400/110 kV ,250MVA in statia noua 400/110kV Horodniceni . Etapa I

– (inainte de realizarea LEA 400kV Suceava-Gadalin) in statia 400/220/110 kV Suceava, prin racord LEA 400kV simplu circuit, in lungime totala de aproximativ 17,5 km, folosind traseul propus pentru viitoarea LEA 400 kV Suceava –

Gadalin;Etapa II – (dupa realizarea LEA 400kV Suceava-Gadalin) racord LEA dublu circuit, in lungime de cca. 0,5 km, intrare

iesire in LEA 400kV Suceava – Gadalin.

Racordare la RET prin intermediul a 2 transformatoare 400/110 kV ,250MVA in statia noua 400/110kV Horodniceni . Etapa I

– (inainte de realizarea LEA 400kV Suceava-Gadalin) in statia 400/220/110 kV Suceava, prin racord LEA 400kV simplu circuit, in lungime totala de aproximativ 17,5 km, folosind traseul propus pentru viitoarea LEA 400 kV Suceava –

Gadalin;Etapa II – (dupa realizarea LEA 400kV Suceava-Gadalin) racord LEA dublu circuit, in lungime de cca. 0,5 km, intrare

iesire in LEA 400kV Suceava – Gadalin.

Racordare la RET prin intermediul a 2 transformatoare 400/110 kV ,250MVA in statia noua 400/110kV Horodniceni . Etapa I

– (inainte de realizarea LEA 400kV Suceava-Gadalin) in statia 400/220/110 kV Suceava, prin racord LEA 400kV simplu circuit, in lungime totala de aproximativ 17,5 km, folosind traseul propus pentru viitoarea LEA 400 kV Suceava –

Gadalin;Etapa II – (dupa realizarea LEA 400kV Suceava-Gadalin) racord LEA dublu circuit, in lungime de cca. 0,5 km, intrare

iesire in LEA 400kV Suceava – Gadalin.

400 Horodniceni

400 Horodniceni

400 Horodniceni

400 Horodniceni

400 Horodniceni

400 Statie noua 400kV

400 Statie noua 400kV

220 Paroseni

220 Paroseni

400 Statie noua 400kV

400 Statie noua 400kV

400 Stalpu

400 Gura Ialomitei

400 Suceava

20 Tulcea Vest

110 Tulcea Vest

110 Tulcea Vest

400 Garoafa

400 Garoafa

400 Ciocile

400 Ciocile

400 Ciocile

400 Ciocile

Racordare la RET prin intermediul a 2 transformatoare 400/110 kV ,250MVA in statia noua 400/110kV Horodniceni . Etapa I

– (inainte de realizarea LEA 400kV Suceava-Gadalin) in statia 400/220/110 kV Suceava, prin racord LEA 400kV simplu circuit, in lungime totala de aproximativ 17,5 km, folosind traseul propus pentru viitoarea LEA 400 kV Suceava –

Gadalin;Etapa II – (dupa realizarea LEA 400kV Suceava-Gadalin) racord LEA dublu circuit, in lungime de cca. 0,5 km, intrare

iesire in LEA 400kV Suceava – Gadalin.

Racordare la RET prin intermediul a 2 transformatoare 400/110 kV ,250MVA in statia noua 400/110kV Horodniceni . Etapa I

– (inainte de realizarea LEA 400kV Suceava-Gadalin) in statia 400/220/110 kV Suceava, prin racord LEA 400kV simplu circuit, in lungime totala de aproximativ 17,5 km, folosind traseul propus pentru viitoarea LEA 400 kV Suceava –

Gadalin;Etapa II – (dupa realizarea LEA 400kV Suceava-Gadalin) racord LEA dublu circuit, in lungime de cca. 0,5 km, intrare

iesire in LEA 400kV Suceava – Gadalin.

Racordare la RET prin intermediul a 2 transformatoare 400/110 kV ,250MVA in statia noua 400/110kV Horodniceni . Etapa I

– (inainte de realizarea LEA 400kV Suceava-Gadalin) in statia 400/220/110 kV Suceava, prin racord LEA 400kV simplu circuit, in lungime totala de aproximativ 17,5 km, folosind traseul propus pentru viitoarea LEA 400 kV Suceava –

Gadalin;Etapa II – (dupa realizarea LEA 400kV Suceava-Gadalin) racord LEA dublu circuit, in lungime de cca. 0,5 km, intrare

iesire in LEA 400kV Suceava – Gadalin.

Racordare la RET prin intermediul a 2 transformatoare 400/110 kV ,250MVA in statia noua 400/110kV Horodniceni . Etapa I

– (inainte de realizarea LEA 400kV Suceava-Gadalin) in statia 400/220/110 kV Suceava, prin racord LEA 400kV simplu circuit, in lungime totala de aproximativ 17,5 km, folosind traseul propus pentru viitoarea LEA 400 kV Suceava –

Gadalin;Etapa II – (dupa realizarea LEA 400kV Suceava-Gadalin) racord LEA dublu circuit, in lungime de cca. 0,5 km, intrare

iesire in LEA 400kV Suceava – Gadalin.

Racordare la RET prin intermediul a 2 transformatoare 400/110 kV ,250MVA in statia noua 400/110kV Horodniceni . Etapa I

– (inainte de realizarea LEA 400kV Suceava-Gadalin) in statia 400/220/110 kV Suceava, prin racord LEA 400kV simplu circuit, in lungime totala de aproximativ 17,5 km, folosind traseul propus pentru viitoarea LEA 400 kV Suceava –

Gadalin;Etapa II – (dupa realizarea LEA 400kV Suceava-Gadalin) racord LEA dublu circuit, in lungime de cca. 0,5 km, intrare

iesire in LEA 400kV Suceava – Gadalin.

Racordare la RET prin statie noua 400/110 5x250MVA, i/e in LEA 400kV Isaccea-Stupina prin LEA 400 kV d.c.0,5 km

Racordare la RET prin statie noua 400/110 5x250MVA, i/e in LEA 400kV Isaccea-Stupina prin LEA 400 kV d.c.0,5 km

Racordare la RET prin LEA 220 kV in statia 220/110 kV Paroseni

Racordare la RET prin LEA 220 kV in statia 220/110 kV Paroseni

Racordare la RET prin statie noua 400/110 5x250MVA, i/e in LEA 400kV Isaccea-Stupina prin LEA 400 kV d.c.0,5 km.

CEE 249 MW SCANTEIESTI se racordează la reţeaua electrică de transport prin intermediul unei LEA 400 kV simplu

circuit in lungime de 11 km, in statie noua 400 kV. Statia noua 400 kV se racordeaza la RET in doua etape,

dupa cum urmeaza: Etapa I – (inainte de realizarea LEA 400 kV Smardan-

Gutinas) in statia 400/110 kV Smardan, prin racord LEA 400 kV dublu circuit, avand un singur circuit echipat, in lungime totala de aproximativ 26 km, folosind traseul propus pentru

viitoarea LEA 400 kV dublu circuit Smardan-Gutinas;Etapa II – (dupa realizarea LEA 400 kV dublu circuit

Smardan-Gutinas) racord LEA 400 kV dublu circuit, in lungime de cca. 0,5 km, intrare iesire in LEA 400 kV dublu

circuit Smardan–Gutinas.

Racord LEA 400kV s.c., sectiune 2x450mmp Ol-Al in lungime totala de aprox. 15km in statia 400/110kV Stalpu si trecerea la

400kV a tronsonului Stalpu-Teleajen-Brazi. Lucrarile de trecere la nivelul de 400kV a axului Stalpu – Teleajen – Brazi constau in realizarea unei celule de linie 400kV in statia Brazi Vest, inlocuirea autotransformatoarelor 220/110kV – 250MVA cu transformatoare 400/110kV in statiile Stalpu si Telejen si

cate 3 celule de 400kV in cele doua statii.

CEE 300 MW FACAENI se racordează la reţeaua electrică de transport a energiei electrice in statia 400/110 kV Gura

Ialomitei, printr-un transformator 110/400 kV – 300 MVA bloc cu o linie 400 kV simplu circuit, in lungime totala de cca. 15

km. (LEA pana in apropierea statiei si LES pana in instalatia de racordare).

CEE 471 MW VIISOARA se racordează la reţeaua electrică de transport in statia 400/220/110 kV Suceava, printr-o LES

400 kV in lungime de cca. 3 km. se racordează la reţeaua electrică de transport, in bara 20kV

a statiei 110/20 kV Tulcea Vest prin LES 20kV, in lungime 7,3 km

Se racordeaza la RET printr-o LES 110kV in lungime de cca.9,2km la bara 110kV a statiei 400/110/20 kV Tulcea Vest

Se racordeaza la RET printr-o LES 110kV in lungime de cca.9,2km la bara 110kV a statiei 400/110/20 kV Tulcea VestRacordare la RET prin intermediul unui transformator 110/400

kV -250 MVA ,in noua statie electrica de 400kV Garoafa,ce urmeaza a fi construita in zona localitatii Garoafa,incadrata in

schema intrare-iesire in LEA 400kV Smardan-Gutinas existenta.

Racordare la RET prin intermediul unui transformator 110/400 kV -250 MVA ,in noua statie electrica de 400kV Garoafa,ce

urmeaza a fi construita in zona localitatii Garoafa,incadrata in schema intrare-iesire in LEA 400kV Smardan-Gutinas

existenta.

Statia 400 kV Ciocile se racordeaza la RET in doua etape, dupa cum urmeaza:

Etapa 1 – inainte de punerea in functiune a LEA 400 kV Stalpu – Gura Ialomitei: racord direct in statia 400 kV Stalpu

realizat astfel: LEA 400 kV s.c. in lungime de 55 km construita pe stalpi dublu circuit (un singur circuit echipat), de la statia 400 kV Ciocile; 50 de km din aceasta LEA va constitui un tronson din viitoarea LEA 400 kV Gura Ialomitei – Stalpu.

Etapa 2 – dupa punerea in functiune a LEA 400 kV Stalpu – Gura Ialomitei: echiparea circuitului al 2-lea al LEA 400 kV de

racord (5 km) cu trecerea statiei 400 kV Ciocile ca fiind racordata la SEN in sistem intrare-iesire in LEA 400 kV Stalpu

– Gura Ialomitei.

Statia 400 kV Ciocile se racordeaza la RET in doua etape, dupa cum urmeaza:

Etapa 1 – inainte de punerea in functiune a LEA 400 kV Stalpu – Gura Ialomitei: racord direct in statia 400 kV Stalpu

realizat astfel: LEA 400 kV s.c. in lungime de 55 km construita pe stalpi dublu circuit (un singur circuit echipat), de la statia 400 kV Ciocile; 50 de km din aceasta LEA va constitui un tronson din viitoarea LEA 400 kV Gura Ialomitei – Stalpu.

Etapa 2 – dupa punerea in functiune a LEA 400 kV Stalpu – Gura Ialomitei: echiparea circuitului al 2-lea al LEA 400 kV de

racord (5 km) cu trecerea statiei 400 kV Ciocile ca fiind racordata la SEN in sistem intrare-iesire in LEA 400 kV Stalpu

– Gura Ialomitei.

Statia 400 kV Ciocile se racordeaza la RET in doua etape, dupa cum urmeaza:

Etapa 1 – inainte de punerea in functiune a LEA 400 kV Stalpu – Gura Ialomitei: racord direct in statia 400 kV Stalpu

realizat astfel: LEA 400 kV s.c. in lungime de 55 km construita pe stalpi dublu circuit (un singur circuit echipat), de la statia 400 kV Ciocile; 50 de km din aceasta LEA va constitui un tronson din viitoarea LEA 400 kV Gura Ialomitei – Stalpu.

Etapa 2 – dupa punerea in functiune a LEA 400 kV Stalpu – Gura Ialomitei: echiparea circuitului al 2-lea al LEA 400 kV de

racord (5 km) cu trecerea statiei 400 kV Ciocile ca fiind racordata la SEN in sistem intrare-iesire in LEA 400 kV Stalpu

– Gura Ialomitei.

Statia 400 kV Ciocile se racordeaza la RET in doua etape, dupa cum urmeaza:

Etapa 1 – inainte de punerea in functiune a LEA 400 kV Stalpu – Gura Ialomitei: racord direct in statia 400 kV Stalpu

realizat astfel: LEA 400 kV s.c. in lungime de 55 km construita pe stalpi dublu circuit (un singur circuit echipat), de la statia 400 kV Ciocile; 50 de km din aceasta LEA va constitui un tronson din viitoarea LEA 400 kV Gura Ialomitei – Stalpu.

Etapa 2 – dupa punerea in functiune a LEA 400 kV Stalpu – Gura Ialomitei: echiparea circuitului al 2-lea al LEA 400 kV de

racord (5 km) cu trecerea statiei 400 kV Ciocile ca fiind racordata la SEN in sistem intrare-iesire in LEA 400 kV Stalpu

– Gura Ialomitei.

400 Ciocile

400 Ciocile

400 Stupina

400 Statie noua 400kV

400 Statie noua 400kV

400 Statie noua 400kV

400 Ciocile

110 Gura Ialomitei

400 Gura Ialomitei

400 Gura Ialomitei

400 Gura Ialomitei

400 Gura Ialomitei

400 Baraganu

110

110

20

20 110/20 kV Tataru

110

110

Statia 400 kV Ciocile se racordeaza la RET in doua etape, dupa cum urmeaza:

Etapa 1 – inainte de punerea in functiune a LEA 400 kV Stalpu – Gura Ialomitei: racord direct in statia 400 kV Stalpu

realizat astfel: LEA 400 kV s.c. in lungime de 55 km construita pe stalpi dublu circuit (un singur circuit echipat), de la statia 400 kV Ciocile; 50 de km din aceasta LEA va constitui un tronson din viitoarea LEA 400 kV Gura Ialomitei – Stalpu.

Etapa 2 – dupa punerea in functiune a LEA 400 kV Stalpu – Gura Ialomitei: echiparea circuitului al 2-lea al LEA 400 kV de

racord (5 km) cu trecerea statiei 400 kV Ciocile ca fiind racordata la SEN in sistem intrare-iesire in LEA 400 kV Stalpu

– Gura Ialomitei.

Statia 400 kV Ciocile se racordeaza la RET in doua etape, dupa cum urmeaza:

Etapa 1 – inainte de punerea in functiune a LEA 400 kV Stalpu – Gura Ialomitei: racord direct in statia 400 kV Stalpu

realizat astfel: LEA 400 kV s.c. in lungime de 55 km construita pe stalpi dublu circuit (un singur circuit echipat), de la statia 400 kV Ciocile; 50 de km din aceasta LEA va constitui un tronson din viitoarea LEA 400 kV Gura Ialomitei – Stalpu.

Etapa 2 – dupa punerea in functiune a LEA 400 kV Stalpu – Gura Ialomitei: echiparea circuitului al 2-lea al LEA 400 kV de

racord (5 km) cu trecerea statiei 400 kV Ciocile ca fiind racordata la SEN in sistem intrare-iesire in LEA 400 kV Stalpu

– Gura Ialomitei.

se racordeaza la RET prin intermediul unui LES 400kV de la transformatorul 250MVA, 400/110 kV la celula noua 400 kV GIS din noua statie 400kV Stupina incadrata intrare -iesire in LEA 750 kV (400 kV) Isaccea - Medgidia Sud -Varna printr-o

LEA 400kV d.c. de cca.0.5 km.Racordare intrare -iesire intr-o noua LEA 400kV Medgidia Sud-statie noua 400kV- Constanta Nord

Racordare intrare -iesire intr-o noua LEA 400kV Medgidia Sud-statie noua 400kV- Constanta Nord

Racordare intrare -iesire intr-o noua LEA 400kV Medgidia Sud-statie noua 400kV- Constanta Nord

Statia 400 kV Ciocile se racordeaza la RET in doua etape, dupa cum urmeaza:

Etapa 1 – inainte de punerea in functiune a LEA 400 kV Stalpu – Gura Ialomitei: racord direct in statia 400 kV Stalpu

realizat astfel: LEA 400 kV s.c. in lungime de 55 km construita pe stalpi dublu circuit (un singur circuit echipat), de la statia 400 kV Ciocile; 50 de km din aceasta LEA va constitui un tronson din viitoarea LEA 400 kV Gura Ialomitei – Stalpu.

Etapa 2 – dupa punerea in functiune a LEA 400 kV Stalpu – Gura Ialomitei: echiparea circuitului al 2-lea al LEA 400 kV de

racord (5 km) cu trecerea statiei 400 kV Ciocile ca fiind racordata la SEN in sistem intrare-iesire in LEA 400 kV Stalpu

– Gura Ialomitei.

Se racordeaza la RET pe barele 110 kV ale statiei 400/110 kV,prin extinderea statiei 110kV cu o celula 110kV,aferenta

LEA 110kV in lung. de 5km, de la statia 110kV/MT proprie. Se racordeaza la RET in extinderea statiei 400/110kV Gura

Ialomitei.

Se racordeaza la RET in extinderea statiei 400/110kV Gura Ialomitei.

Se racordeaza la RET in extinderea statiei 400/110kV Gura Ialomitei.

Se racordeaza la RET in extinderea statiei 400/110kV Gura Ialomitei.

Racordare in statie noua 400kV Baraganu racordata intrare -iesire intr-o noua LEA 400kV d.c Medgidia Sud - Constanta

Nord

Gura Ialomitei - Bordusani

realizare LEA 110 kV dublu circuit de 0,5 km pentru incadrarea statiei de conexiune „intrare - iesire” in LEA 110

kV Gura Ialomitei - Bordusani, echipata cu fibra optica;● realizare staţie electrica de conexiune 110 kV conectata intrare - ieşire in LEA 110 kV Gura Ialomitei - Bordusani,

integrata in sistemul de telecontrol existent la Enel Distributie Dobrogea; statia va fi prevazuta cu doua module hibride

(fiecare cu cate un intrerupator), bare colectoare 110 kV si un separator 110 kV, care asigura atat separarea instalatiei de

racordare de instalatia de utilizare, cat si punctul de delimitare.

● adaptarea protecţiilor existente din statiile Gura Ialomitei si Bordusani in celulele aferente LEA 110 kV Gura Ialomitei - Bordusani, în vederea asigurării condiţiilor de funcţionare

pentru CEE Facaeni - Vladeni, 52 MW;● realizare suport de transmisie pentru integrarea statiei de conexiune „intrare - iesire” in sistemul de telecontrol existent

la Enel Distributie Dobrogea;● inlocuire intrerupatoare existente in statiile Gura Ialomitei si Bordusani aferente LEA 110 kV Gura Ialomitei - Bordusani, cu

intrerupatoare cu comanda uni-tripolara si RAR monofazat.

Statia 110 kV Harsova

statie de transf. noua proprie CEE 40 MW, 110/20 kV la 3 km de st. Harsova cu extindere bara 110 kV in afara statiei

Harsova

110/20/10 kV Neptun

racord derivatie scurt in cablu, racordat in statia de transformare 110/20/10 kV Neptun si amplasarea unui punct

de conexiune la limita incintei statiei de transformare.racord derivatie scurt in cablu, racordat in statia de

transformare 110/20 kV Tataru si amplasarea unui punct de conexiune la limita incintei statiei de transformare110/20 kV Medgidia

Sud / 110/20kV Baneasa

Statie de conexiune conectata intrare-iesire in LEA 110 kV Medgidia Sud – Baneasa.

110/6 kV Medgidia Nord

Racordarea CEE Satu Nou - 9 MW se va face la medie tensiune la 20 kV în staţia 110/6 kV Medgidia Nord printr-un LES 20 kV, 3x185 mmp in lungime de 500 m.

110

110 110/20 kV Topolog

110 Galbiori Racordarea in statia 110 kV Galbiori prin LEA 110 kV s.c.

110

110

110

110/20 kV Tataru

110/6 kV Medgidia Nord

Racordarea CEE Mircea Voda - 9 MW se va face la medie tensiune la 20 kV în staţia 110/6 kV Medgidia Nord printr-un LES 20 kV, 3x185 mmp in lungime de 500 m.

● realizare LEA 110 kV dublu circuit pentru încadrarea statiei de conexiune „intrare - iesire” in LEA 110 kV Topolog –

derivatia Cismeaua Noua – Harsova, echipata cu fibra optica in lungime de maxim 0,5 km;

● realizare staţie electrica de conexiune 110 kV conectata intrare - ieşire in LEA 110 kV Topolog – derivatia Cismeaua Noua – Harsova, integrata in sistemul de telecontrol existent

la Enel Distributie Dobrogea;

Statia 400/110 kV Gura Ialomitei ;

Statia 110/20 kV Stefan cel Mare

Racordarea, CEE Platonesti – 45 MW limitata la 40 MW, la 110 kV printr-o statie de conexiune intrare – iesire, conectata

in LEA 110 kV Gura Ialomitei – Stefan cel Mare

110/20 kV Baia110/20 kV Babadag

*realizare LEA 110 kV dublu circuit pentru încadrarea statiei de conexiune „intrare - iesire” in LEA 110 kV Baia – Babadag;

*realizare staţie electrica de conexiune 110 kV conectata intrare - ieşire in LEA 110 kV Baia – Babadag

Racordarea CEE Pecineaga – 77,5 MW se va realiza in statia 110/20 kV Tataru prin montare celula 110 kV (cu intrerupator cu comanda uni-tripolara si RAR monofazat) racord Pecineaga 77,5 MW in statia Tataru.

110

20

110/20 KV Rasova

20

20

110/20kV Tataru

110

20 Tataru

20 Sacele

110

110/20 kV Harsova ; 110/20 kV Medgidia Nord

Racordarea CEE Dorobantu printr-o LEA 110 kV dublu circuit pentru incadrarea statiei de conexiune “intrare-iesire ” in LEA 110 kV Medgidia Nord-Harsova.

racord derivatie scurt in cablu, racordat in statia de transformare 110/20 kV Rasova si amplasarea unui punct de conexiune la limita incintei statiei de transformare, montare grup celule 20 KV in statia Rasova

110/20 kV Nicolae Balcescu

Racordarea in Statia 110/20 kV Nicolae Balcescu printr-o linie de cca 16 km.

echipare punct de conexiune amplasat in apropierea punctului de racordare (1 celula de linie si o celula de masura ) si realizare racord 20 kV intre punctul de racordare (st. nr. 13 al derivatiei PTA 3 Topraisar LEA 20 kV 1702)si punctul de conexiune

110/20 kV Basarabi110/20 kV Lumina

realizare LEA 110 kV dublu circuit pentru încadrarea statiei de conexiune „intrare - iesire” in LEA 110 kV Basarabi – Lumina, echipata cu fibra optica in lungime de maxim 0,5 km; realizare staţie electrica de conexiune 110 kV conectata intrare - ieşire in LEA 110 kV Basarabi – Lumina, integrata in sistemul de telecontrol existent la SC Enel Distributie Dobrogea SA;

Echipare compartiment de racordare din punctul de conexiune, amplasat in apropierea LEA 20 kV 1703 - o celula de linie si o celula de masura; realizare racord 20 kV intre punctul de racordare (stalpul nr. 316 al LEA 20 kV 1703) si punctul de conexiune; montare grup de masura in punctul de conexiune.

Echipare compartiment de racordare din punctul de conexiune, amplasat in apropierea LEA 20 kV 4400 derivatiei PTA 1650 - o celula de linie si o celula de masura; realizare racord 20 kV intre punctul de racordare (stalpul nr. 6 al derivatiei PTA 1650 LEA 20 kV 4400) si punctul de conexiune; montare grup de masura in punctul de conexiune.

110/20 kV Gheorghe Doja

extinderea barei colectoare si montarea unei celule noi LEA 110 kV in statia 110/20 kV Gheorghe Doja aferenta CEE Gheorghe Doja 54 MW; - contor masura energie produsa, montat in instalatia Utilizatorului.

0.4

110 110/20 kV Zebil

110

20 110/20 Eforie Nord

20 110/20 kV Baneasa

20 110/20 kV Petrol Sud

110 Maneciu-Olteni racord intrare-iesire in LEA 110 kV Olteni - Maneciu

110 Beresti racord 110 kV in statia Beresti

Inlocuire BMPT existent cu BMPT din policarbonat (opac), antivandal, cu întrerupător diferenţial, dispozitiv de protecţie la

supratensiuni (DPST), dispozitiv de protecţie la tensiune pe conductorul de nul;Inlocuire contor existent pentru decontare energie electrică, cu un contor electronic trifazat dublu sens,

clasa de precizie 0,5, montaj indirect, curbă sarcină, etc. Contorul va fi pus la dispoziţie de către Enel Distribuţie

Dobrogea, iar costurile pentru achiziţionare şi montare vor fi cuprinse în tariful de racordare.

*montare grup de celule 20 kV in statia 110/20 kV Zebil (extindere sistem bare 20 kV cu o celula de adaptare si o celula de linie);*echipare punct de conexiune;*realizare racord 20 kV intre celula de linie nou montata in statia 110/20 kV Zebil si punctul de conexiune; *montare grup de masura in punctul de conexiune;*montare transformator de putere 16 MVA 110/20 kV (trafo 2) in statia 110/20 kV Zebil.

110/20 kV Medgidia Sud si Basarabi

realizare staţie electrica de conexiune 110 kV conectata intrare - ieşire in LEA 110 kV Medgidia Sud – Basarabi, integrata in sistemul de telecontrol existent la SC ENEL

Distributie Dobrogea SA

Echipare compartiment de racordare din punctul de conexiune, amplasat in apropierea LEA 20 kV 1220 derivatiei PTA 224 – o celula de linie si o celula de masura; Realizare racord 20 kV intre punctul de racordare (stalpul nr. 7 al derivatiei PTA 224 LEA 20 kV 1220) si punctul de conexiune; Montare grup de masura in punctul de conexiune.

Echipare compartiment de racordare din punctul de conexiune, amplasat in apropierea LEA 20 kV 6401 – doua celule de linie si o celula de masura; Realizare racord 20 kV, in sistem intrare - iesire, intre punctul de racordare (stalpul nr. 531 al LEA 20 kV 6401) si punctul de conexiune; Montare grup de masura in punctul de conexiune.

Echipare compartiment de racordare din punctul de conexiune, amplasat in apropierea LEA 20 kV 0723 derivatie PTA 645 – o celula de linie si o celula de

masura; Realizare racord 20 kV intre punctul de racordare ( stalpul nr. 25 al derivatiei PTA 645 LEA 20 kV 0723) si punctul de conexiune; Montare grup de masura in

punctul de conexiune.

20 Mizil

20 Sahateni derivatia 20 kV PTA 559 Prosca, din LEA 20 kV Naeni

110 Pechea racord 110 kV in statia de transformare Pechea

20 Romanu celula 20 kV in statia de transformare Romanu

110 racord 110 kV in LEA 110 kV Gutinas - Focsani Nord

20 Pechea celula 20 kV in statia de transformare Pechea

20 Frumusita

110 Scobinti

110Scobinti

110Munteni

racord in circuitul 1 al LEA 110 kV Munteni - Husi

110Barlad

racord in LEA 110kV Barlad-Rosiesti

110Husi

110Tg.Frumos

racord in LEA 110kV Tg.Frumos-Vatra prin modul hibrid

20 Podu Iloaiei racord 20kV in St.110/20kV Podu Iloaiei

110 Pascani racord LEA 110 kV Pascani-CFR Halaucesti

racord 20 kV din stalpul nr. 363 al LEA 20 kV Ax Fantanele

Gutinas-Focsani Nord

racord 20 kV din stalpul 18 al LEA 20 kV Frumusita - SPP 10

in statia 110kV Scobinti, racordata intrare-iesire in circuitul 1 LEA 110 kV Pascani-Harlau

in statia 110kV Scobinti, racordata intrare-iesire in circuitul 1 LEA 110 kV Pascani-Harlau

racord in statia Husi prin echiparea circ.2 al LEA 110kV Falciu-Vetrisoaia-Husi (de la CEE la st. Husi, fara a intra in st. Falciu si Vetrisoaia)

110

110

0.4

110

0.4

110

20 Baita Racord subteran 2xLES 20 KV din statia Baita

20 Salonta Racord subteran LES 20 KV din statia Salonta

statie proprie 110/20 kV intrare-iesire in LEA 110 kV Banovita-Vj.Mare

LEA 110 KV Vanju Mare - Banovita.;Se va rac. o Statie de Transformare 110/20 KV intrare - iesire

in LEA 110 KV Vanju Mare - Banovita, la aprox. 10 km fata dest. 110 KV Vanju Mare.

Moldova Noua-Oravita

constă într-o staţie 110 kV în schemă intrare-ieşire în LEA 110 kV Moldova Noua - Oravita, circuitul 2.

Fantanele BMPT-63 A racordat la tabloul de distribuţie 0,4 kV al PTAb 3645 si montat pe peretele exterior al acestuia

110/20 kV Cucuruzu110/20 kV

Draganesti Vlasca

*realizare bara colectoare 110 kV si montarea unei celule noi LEA 110 kV in statia 110/20 kV Cucuruzu aferenta CEE Rasuceni;*montare celula 110 kV noua in statia Draganesti Vlasca, aferenta LEA 110 kV Ghizdaru - derivatia Cucuruzu - Draganesti Vlasca;*montare celula 110 kV noua in statia Draganesti Vlasca, aferenta LEA 110 kV Draganesti Vlasca - Videle.

LEA GREACA aferenta PT3951

Lucrari comune (fotovoltaic+eolian) langa BMPT-16A existent se monteza o cutie de distributie echipata cu clema cu 4 cai. Se demonteza racordul aerian de la LEA jt Greaca, din BMPT16A existent si se monteza in cutia de distributie nou proiectata. Se realizeaza o legatura intre cutia d edistributie si BMPT 16A existent. Lucrari specifice eoliana: langa BMPT 16A existent se monteza un BMPT20A nou. Se realizeaza o legatura intre cutia de distributie si BMPT20A nou.

LEA 110 kV Dumbrava - Sadu V (in apropierea statiei Sadu V), intre stalpii nr. 1 si nr. 2.

Statia 110 kV Dumbrava; Statia 110 kV

Sadu V

Racordarea la RED a centralei electrice eoliene se va face in LEA 110 kV Dumbrava-Sadu V.- Realizare statie de conexiuni 110 kV echipata cu: un modul hibrid cu doua intreruptoare (PASS MO DCB) conectat spre LEA Dumbrava-Sadu V, un separator tripolar de tip exterior 110 kV, un modul hibrid cu un intreruptor (PASS MO SBB) conectat spre cablu (apartine producatorului si va fi realizat din fonduri proprii), dulapuri de protectii necesare actionarii intreruptoarelor din schema celor doua module hibrid, dulapul pentru sistemul SCADA si dulapuri pentru serviciile interne de c.a. si c.c. (pentru climatizare, armare dispozitive, de actionat, iluminat, alimentare protectii, comanda, semnalizare, masurare); - Racordarea statiei de conexiuni la LEA 110 kV Dumbrava-Sadu V se va face prin intermediul a doua separatoare tripolare 110 kV inseriate cu cele doua ramuri ale modulului hibrid cu doua intreruptoare;

Emitent Nr. ATR Obs. Legislatia

Transelectrica 146 20.09.2012 90/2008

Transelectrica 65 07.05.2012 90/2008

Transelectrica 66 10.05.2012 ATR nou 90/2008

Transelectrica 99 11.07.2012 90/2008

Transelectrica 68 10.05.2012 ATR nou 90/2008

Transelectrica 70 10.05.2012 90/2008

Transelectrica 71 10.05.2012 90/2008

Transelectrica 72 14.05.2012 ATR nou 90/2008

Transelectrica 73 14.05.2012 ATR nou 90/2008

Data Emiterii/ Prelungirii

inlocuieste ATR 93/15.06.2012

prelungire ATR 109/07.11.2011

Prelungire ATR 02/11.01.2012

Prelungire ATR 110/10.11.2011

Prelungire ATR 111/10.11.2011

Transelectrica 74 14.05.2012 ATR nou 90/2008

Transelectrica 75 14.05.2012 ATR nou 90/2008

Transelectrica 76 14.05.2012 ATR nou 90/2008

Transelectrica 77 14.05.2012 ATR nou 90/2008

Transelectrica 92 12.06.2012 ATR nou 90/2008

Transelectrica 47 25.04.2012 90/2008

Transelectrica 98 21.06.2012 Prelungire 78/15.05.2012 90/2008

Transelectrica 120 13.08.2012 90/2008

Transelectrica 121 13.08.2012 90/2008

Transelectrica 122 13.08.2012 90/2008

prelungire ATR 102/25.10.2011

prelungire ATR 88/08.06.2012

prelungire ATR 89/08.06.2012

prelungire ATR 90/08.06.2012

Transelectrica 123 13.08.2012 90/2008

Transelectrica 138 30.08.2012 90/2008

Transelectrica 136 28.08.2012 90/2008

Transelectrica 135 24.08.2012 90/2008

Transelectrica 152 05.10.2012 90/2008

Transelectrica 151 05.10.2012 90/2008

Transelectrica 156 09.10.2012 90/2008

Transelectrica 155 09.10.2012 90/2008

Transelectrica 154 09.10.2012 90/2008

Transelectrica 159 11.10.2012 90/2008

Transelectrica 160 11.10.2012 90/2008

Transelectrica 50 25.04.2012 ATR nou 90/2008

Transelectrica 51 25.04.2012 ATR nou 90/2008

Transelectrica 52 25.04.2012 ATR nou 90/2008

Transelectrica 53 25.04.2012 ATR nou 90/2008

Transelectrica 54 25.04.2012 ATR nou 90/2008

prelungire ATR 91/08.06.2012

prelungire ATR 30/01.03.2012

prelungire ATR 29/28.02.2012

prelungire ATR 28/24.02.2012

prelungire ATR 37/09.04.2012

prelungire ATR 38/09.04.2012

inlocuieste ATR 39/09.04.2012

inlocuieste ATR 40/09.04.2012

inlocuieste ATR 41/09.04.2012

prelungire ATR 43/11.04.2012

prelungire ATR 44/11.04.2012

Transelectrica 55 25.04.2012 ATR nou 90/2008

Transelectrica 56 25.04.2012 ATR nou 90/2008

Transelectrica 57 25.04.2012 ATR nou 90/2008

Transelectrica 58 25.04.2012 ATR nou 90/2008

Transelectrica 49 25.04.2012 ATR nou 90/2008

Transelectrica 59 25.04.2012 ATR nou 90/2008

Transelectrica 60 25.04.2012 ATR nou 90/2008

Transelectrica 63 04.05.2012 ATR nou 90/2008

Transelectrica 64 04.05.2012 ATR nou 90/2008

Transelectrica 81 16.05.2012 ATR nou 90/2008

Transelectrica 103 17.07.2012 ATR nou 90/2008

Transelectrica 104 17.07.2012 90/2008

Transelectrica 105 25.07.2012 ATR nou 90/2008

Transelectrica 106 27.07.2012 ATR nou 90/2008

Transelectrica 107 31.07.2012 Prelungire 69/10.05.2012 90/2008

Transelectrica 108 02.08.2012 Prelungire 18/06.02.2012 90/2008

Transelectrica 109 02.08.2012 Prelungire 19/06.02.2012 90/2008

Transelectrica 110 02.08.2012 Prelungire 17/06.02.2012 90/2008

Transelectrica 111 02.08.2012 Prelungire 16/03.02.2012 90/2008

Transelectrica 124 20.08.2012 ATR nou 90/2008

Transelectrica 125 20.08.2012 ATR nou 90/2008

Transelectrica 126 20.08.2012 ATR nou 90/2008

Transelectrica 127 20.08.2012 ATR nou 90/2008

Prelungire ATR 13/17.01.2012

Transelectrica 128 20.08.2012 ATR nou 90/2008

Transelectrica 129 20.08.2012 ATR nou 90/2008

Transelectrica 134 22.08.2012 ATR nou 90/2008

Transelectrica 142 11.09.2012 ATR nou 90/2008

Transelectrica 143 11.09.2012 ATR nou 90/2008

Transelectrica 144 11.09.2012 ATR nou 90/2008

Transelectrica 145 14.09.2012 ATR nou 90/2008

Transelectrica 139 07.09.2012 ATR nou 90/2008

Transelectrica 147 04.10.2012 ATR nou 90/2008

Transelectrica 148 04.10.2012 ATR nou 90/2008

Transelectrica 149 04.10.2012 ATR nou 90/2008

Transelectrica 150 04.10.2012 ATR nou 90/2008

Transelectrica 161 12.10.2012 ATR nou 90/2008

10028001ATR prelungit 90/2008

10028015ATR prelungit

90/2008

10028020ATR prelungit

90/2008

10028023 ATR prelungit 90/2008

10 ATR prelungit 90/2008

12 ATR prelungit 90/2008

Enel Distributie Dobrogea

18.01.2011/10.06.2011

ENEL Distributie Dobrogea

27.07.2011/10.01.2012

ENEL Distributie Dobrogea

05.09.2011/05.12.2011

Enel Distributie Dobrogea

17.10.2011/10.01.2012

Enel Distributie Dobrogea

20.10.2011/10.04.2012

Enel Distributie Dobrogea

31.10.2011/ 04.04.2012

13 ATR prelungit 90/2008

14 ATR prelungit 90/2008

10028012 ATR prelungit 90/2008

11 ATR prelungit 90/2008

16 ATR prelungit 90/2008

17 ATR prelungit 90/2008

Enel Distributie Dobrogea

31-10-2011/04.04.2012

Enel Distributie Dobrogea

13.12.2011/11.05.2012

Enel Distributie Dobrogea

13.05.2011/11.11.2011

ENEL Distributie Dobrogea

11.01.2012/05.07.2012

ENEL Distributie Dobrogea

23.01.2012/03.07.2012

Enel Distributie Dobrogea

22.03.2012/20.07.2012

21 14.06.2012 90/2008

6936 ATR prelungit 90/2008

10028027 ATR prelungit 90/2008

6935 ATR prelungit 90/2008

22 11.06.2012 90/2008

10028029 ATR prelungit 90/2008

10028028 ATR prelungit 90/2008

30 20.08.2012 90/2008

Enel Distributie Dobrogea

Enel Distributie Dobrogea

22.06.2012/25.08.2012

Enel Distributie Dobrogea

21.06.2012/10.09.2012

Enel Distributie Dobrogea

17.05.2012/16.08.2012

Enel Distributie Dobrogea

Enel Distributie Dobrogea

04.07.2012/04.10.2012

Enel Distributie Dobrogea

04.07.2012/04.10.2012

Enel Distributie Dobrogea

10028031 04.09.2012 90/2008

26 10/2/2012 90/2008

32 9/20/2012 90/2008

10028036 15.10.2012 90/2008

10028035 10.10.2012 90/2008

10028034 26.09.2012 90/2008

30101230073 7/16/2012 6 luni HG 90/2008

30501215791 7/3/2012 6 luni HG 90/2008

Enel Distributie Dobrogea

Enel Distributie Dobrogea

Enel Distributie Dobrogea

Enel Distributie Dobrogea

Enel Distributie Dobrogea

Enel Distributie Dobrogea

FDEE Electrica Distributie Muntenia Nord

FDEE Electrica Distributie Muntenia Nord

30101233446 10/4/2012 3 luni HG 90/2008

30301207410 10/4/2012 3 luni HG 90/2008

30501111424 12/19/2011 6 luni+prelungire 6 luni HG 90/2008

30201207047 7/5/2012 3 luni+prelungire 3 luni HG 90/2008

30401216172 6/15/2012 6 luni HG 90/2008

30501216429 7/23/2012 3 luni+prelungire 3 luni HG 90/2008

30501218519 9/13/2012 3 luni HG 90/2008

1000220461 25.05.2012 6 luni 90/2008

1000214991 16.05.2012 6 luni 90/2008

1000086284 25.02.2012 6 luni 90/2008

1000110650 06.04.2012 6 luni 90/2008

1000124078 01.05.2012 6 luni 90/2009

1000199659 06.04.2012 6 luni 90/2008

1000238071 28.09.2012 3 luni 90/2008

1000296789 02.10.2012 6 luni 90/2008

FDEE Electrica Distributie Muntenia Nord

FDEE Electrica Distributie Muntenia Nord

FDEE Electrica Distributie Muntenia Nord

FDEE Electrica Distributie Muntenia Nord

FDEE Electrica Distributie Muntenia Nord

FDEE Electrica Distributie Muntenia Nord

FDEE Electrica Distributie Muntenia Nord

E.ON Moldova Distributie

E.ON Moldova Distributie

E.ON Moldova Distributie

E.ON Moldova Distributie

E.ON Moldova Distributie

E.ON Moldova Distributie

E.ON Moldova Distributie

E.ON Moldova Distributie

CEZ DISTRIBUTIE 1400000007 01.10.2012 6 luni 90/2008

2 19.08.2011/02.02.2012

ATR prelungit

90/2008

1193 21.05.2012/21.08.2012

ATR prelungit

90/2008

34 10/25/2012 90/2008

376 10/19/2012 90/2008

FDEE - EDTS 12.01.2012 / HG 90/2008

FDEE-EDTN 60101223378 06.07.2012 HG 90/2008

FDEE-EDTN 60201212520 18.06.2012 HG 90/2008

Enel Distributie Banat

Enel Distributie Banat

Enel Distributie Muntenia

ENEL Distributie Muntenia

SR70201119105 / 15.12.2011

Data expirarii ATR Stare ATR Data estimata PIF

16.12.2012 Valabil 2014

07.11.2012 VALABIL 2013

10.11.2012 VALABIL 2014

11.01.2013 VALABIL 2014-2016

10.11.2012 VALABIL 2013-2014

10.11.2012 VALABIL 2012

10.11.2012 VALABIL 2012

14.11.2012 VALABIL

2013

14.11.2012 VALABIL

2013

14.11.2012 VALABIL

2013

14.11.2012 VALABIL

2013

14.11.2012 VALABIL

2013

14.11.2012 VALABIL

2013

12.12.2012 Valabil 2014

25.10.2012 Valabil 2013

21.12.2012 VALABIL 2012

15.02.2013 Valabil 2013-2014

15.02.2013 Valabil 2013-2014

15.02.2013 Valabil 2013-2014

15.02.2013 Valabil 2013

01.03.2013 Valabil 2014-2016

28.02.2013 Valabil 2014

24.02.2013 Valabil 2013-2014

09.04.2013 Valabil 2013

09.04.2013 Valabil 2013

09.04.2013 Valabil 2014

09.04.2013 Valabil 2014

09.04.2013 Valabil 2014

11.04.2013 Valabil 2013

11.04.2013 Valabil 2015

25.10.2012 Valabil 2015

25.10.2012 Valabil 2015

25.10.2012 Valabil 2015

25.10.2012 Valabil 2015

25.10.2012 Valabil 2017

25.10.2012 Valabil 2017

25.10.2012 Valabil 2017

25.10.2012 Valabil 2017

25.10.2012 Valabil 2017

25.10.2012 Valabil 2015

25.10.2012 Valabil2015

25.10.2012 Valabil2015

04.11.2012 Valabil2014

04.11.2012 Valabil2015

16.11.2012 Valabil 2014

17.01.2013 VALABIL 2014-2015

17.01.2013 Valabil 2013-2014

25.01.2013 Valabil 2014

27.01.2013 Valabil 2013-2014

10.11.2012 VALABIL 2013

06.02.2013 Valabil 2013

06.02.2013 Valabil 2013

06.02.2013 Valabil 2013

03.02.2013 Valabil 2013

20.02.2013 Valabil 2015

20.02.2013 Valabil 2015

20.02.2013 Valabil 2015

20.02.2013 Valabil 2015

20.02.2013 Valabil 2015

20.02.2013 Valabil 2015

22.02.2013 Valabil 2013

11.03.2012 Valabil 2015

11.03.2012 Valabil 2015

11.03.2012 Valabil 2015

14.03.2013 Valabil 2015

07.03.2013 Valabil 2013

04.04.2013 Valabil 2013

04.04.2013 Valabil 2013

04.04.2013 Valabil 2013

04.04.2013 Valabil 2013

12.04.2013 Valabil 2014-2015

18.01.2012VALABIL

27.07.2012 VALABIL octombrie 2012

3/5/2012 VALABIL

17.04.2012 VALABIL Mai 2013

10/20/2012 VALABIL trimestrul III - 2013

31.10.2012 VALABIL Trim IV 2012

31.10.2012 VALABIL Trim IV 2012

13.12.2012 VALABIL 2013

13.05.2012 VALABIL

11.01.2013 VALABIL 2014

23.01.2013 VALABIL 2013

22.03.2013 VALABIL trim IV 2012

14.12.2012 VALABIL 2012

1/4/2013 VALABIL 2013

12/21/2012 VALABIL Trim IV 2013

17.11.2012 VALABIL 2012

11.12.2012 VALABIL 2014

1/4/2013 VALABIL 2013

1/4/2013 VALABIL 2013

20.02.2013 VALABIL trim III 2014

04.12.2012 VALABIL 2013

4/2/2013 VALABIL 2013

3/20/2013 VALABIL 2013

15.01.2013 VALABIL 2013

10.01.2013 VALABIL 2013

12/26/2012 VALABIL 2013

1/16/2013 VALABIL

1/3/2013 VALABIL

1/4/2013 VALABIL

1/4/2013 VALABIL

12/19/2012

1/5/2013

12/15/2012 VALABIL

1/23/2013

12/13/2012 VALABIL

25.11.2012 VALABIL 2012

16.11.2012 VALABIL 2013

25.08.2012 2012

06.10.2012 VALABIL 2012-2013

01.11.2012 VALABIL 2012

06.10.2012 VALABIL 2013

28.12.2012 VALABIL 2012

02.04.2012 VALABIL 2013

VALABIL, adresa prelungire nr.

1732/18.06.2012

VALABIL, adresa prelungire valabilitate

nr. 2988/03.10.2012

VALABIL, adresa prelungire valabilitate

nr. 3024/05.10.2012

VALABIL-In curs de actualizare

01.04.2012 VALABIL PIF 2013

19.08.2012 VALABIL 2012

21.11.2012 VALABIL trimestrul III 2012

4/25/2013 VALABIL Jun-13

1/19/2013 VALABIL 2013

7/12/2012 VALABIL 2015

06.01.2013 VALABIL

18.12.2012 VALABIL

Data: 05.11.2012Codul culorilor ATR emise de:

Transelectrica Enel DobrogeaE.ON MoldovaElectrica Transilvania NordElectrica Transilvania sudCEZElectrica Muntenia NordEnel MunteniaEnel BanatATR ExpirateATR Noi

Denumire investitor Denumire centrale electrice Tip SRE Judetul

1SC HIDRO-ESTE SRL

hidroValcea

2

SC HIDRO-ESTE SRL

hidro

Valcea

3SC HIDRO-ESTE SRL

hidroValcea

4SC HIDRO-ESTE SRL

hidroValcea

5 SC CORPAD SRL MHC TARCAU MHC Neamt

6

MHC GURA HAITII-2 MHC Suceava

7

MHC HAITA MHC Suceava

8

MHC BAUCA MHC Suceava

9

MHC SARU DORNEI-1 MHC Suceava

Nr. crt

Racordare la RED MHC Boia Mica I, com.Caineni,

jud.Valcea;Racordare la RED MHC Boia Mare Mica, com.Caineni,

jud.Valcea

Racordare la RED MHC Boia Mica II, com.Caineni,

jud.Valcea;Racordare la RED MHC Boia Mare I, com.Caineni,

jud.Valcea;Racordare la RED MHC Boia Mare II, com.Caineni,

jud.ValceaRacordare la RED MHC Pascoaia 2 MHC Pascoaia 3

Racordare la RED MHC Pascoaia 4 = 2,080MWMHC Prioboasa 1 = 1,328MW

SC HIDROELECTRICA SASUCURSALA HIDROCENTRALE BISTRITA

SC HIDROELECTRICA SASUCURSALA HIDROCENTRALE BISTRITA

SC HIDROELECTRICA SASUCURSALA HIDROCENTRALE BISTRITA

SC HIDROELECTRICA SASUCURSALA HIDROCENTRALE BISTRITA

10

SC Water Energy System SRL CHEAP Frasin-Pangarati CHEAP Neamt

11 SC GV ENERGY SRL MHC loc. Poiana hidro Bihor

12 SC ELECTRICO AQUA SRL MHC Budeşti 1 hidro Maramures

13SC ALESIS SRL MHC Ruscova, Socolau

hidroMaramures

14SC HYDROTECH ELECTRIC SRL MHC Suciu Minghet

hidroMaramures

15 MHC Lapus hidro Maramures

16

VISTISOARA

hidro

BRASOV

17

HARSENI

hidro

BRASOV

18

HARSENI

hidro

BRASOV

19

SC ELCATA MHC SRL DEJANI

hidro

BRASOV

20

RACOVITA

hidro

SIBIU

SC AURORA HIDROENERGETICA SRL

SC HIDRO CLEAR SRL

SC ELCATA MHC SRL

SC ELCATA MHC SRL

SC HIDROELECTRICA SA BUCURESTI SUCURSALA HIDROCENTRALE SIBIU

21

NIRAJUL MARE-CHIHERU DE JOS

hidro

MURES

22

SC HYDRO POWER ENERGY SRL FANCEL

hidro

MURES

23

SC ATS ENERGY SRL ARIESUL MIC - VIDRISOARA

hidro

ALBA

SC NIRAJ ENERGY SRL

24

AGIL GROUP S.R.L. CASOAIA

hidro

ALBA

25

SC ATS ENERGY SRL ARIESUL MIC

hidro

ALBA

26

SC H2O ENERGY SRL MARTINIS

hidro

HARGHITA

27

SC H2O ENERGY SRL LUETA

hidro

HARGHITA

28

SC HR ENERGY SRL TOPLITA

hidro

HARGHITA

29

NEHOIASU hidro Buzau

30 SC ELSID SA hidro Prahova

SC HIDROELECTRICA SA BUCURESTI -SUCURSALA HIDROCENTRALE BUZAU

CHEMP COMARNIC SI BREAZA

31CHE COSMESTI hidro Galati

32 ELSID SA CHEMP BUZAU-1 PALTINENI hidro Buzau

33 ELSID SA CHEMP BUZAU-2 Mlajet hidro Buzau

34 ELSID SA CHEMP Faget hidro Prahova

35

ECOWATT INVEST CERNAVODA hidro Constanta

36 Herculane hidro

37 VIALTERO ENERGY SRL Obreja hidro

38 Baru hidro Hunedoara

39

HALMAGEL ENERGY SRL

Sarbi hidro Arad

40 GRAZY PRICE MEDICAL I Efrimie Murgu hidro

SC HIDROELECTRICA SA BUCURESTI -SUCURSALA HIDROCENTRALE BISTRITA

HIDROELECTRICA SA-SUC. HIDROCENTRALE CARANSEBES

Caras-Severin

Caras-Severin

RENEWABLES INVEST SRL

Caras-Severin

41

MEIR CONSULTING SRL

Berzasca hidro

TOTAL

Caras-Severin

U(kV) Staţia de racord Comentariu

5.635 20 SIT 110/20kVBrezoi

6.127 20 SIT 110/20kVBrezoi

6.121

3.112

2.6 20 Dodeni

0.615 20 Vatra Dornei

0.615 20 Vatra Dornei

0.375 20 Vatra Dornei

2.6 20 Vatra Dornei

Putere instalata

(MW) LEA 20kV Brezoi-Gura Lotrului, Derivatia Salatruc;celula de linie cu intreruptor in vid sosire din MHC Grup I Boia; celula de linie cu intreruptor in vid sosire din MHC

Grup II BoiaLEA 20kV Brezoi-Caineni de linie cu intreruptor in vid sosire din MHC Grup I Boia; celula de linie cu intreruptor in vid

sosire din MHC Grup II Boia

statia 110 / 20 kV Brezoi

SIT 110/20kV Bradisor apartine

SH Rm.Valcea

;

Celula 20 Kv proiectata in statia 110/20 Kv

Brezoi-circuit 2

Celula 20 Kv proiectata in statia 110/20 Kv Brezoi-circuit 2

statia 110 / 20 kV Brezoi

SIT 110/20kV Bradisor apartine

SH Rm.Valcea

;

Celula 20 Kv proiectata in statia 110/20 Kv

Brezoi-circuit 1

Celula 20 Kv proiectata in statia 110/20 Kv Brezoi-circuit 1

racord in derivatia 20 kV Bolovanis a LEA 20 kV Dodeni-Stejaru

racord 20kV din stalpul nr. 138 al LEA 20kV Negoiul Romanesc (racord de baza) si din stalpul nr. 248 al LEA 20kV Saru Dornei-Calimani (racord de rezerva), printr-o linie electrica aeriana 20kV care formeaza o bucla intre cele 2 linii.

racord 20kV din LEA 20 kV Vatra Dornei – Negoiul Romanesc, stalpul 117

racord 20kV din LEA 20 kV Vatra Dornei – Negoiul Romanesc, stalpul 105

racord 20kV din stalpul nr.6 al LEA Saru Dornei –Paltinis, alimentata din PA Saru Dornei

300 220 statie noua

1 20 Baita

0.94 20 Sighet

2.1 20 Viseu

1.03 20 Targu Lapus

6.38 20 Somcuta

1.240 20

0.891 20

1.196 20

2.440 20

36.720 110

racordare la RET in statie noua 220kV conectata intrare-iesire in Lea 220kV

Stejaru-Gheorgheni printr-un racord LEA 220kV d.c. aprox.7km.

Racord aerian din LEA 20 KV Baita - Avram Iancu

Racord aerian din LEA 20 KV Sighet - Budesti, racord PTA 6 Manastirea Rosia

Racord aerian din LEA 20 KV PA4(7) Leordina - Poieni, racord statie Tratare Apa

Racord aerian din LEA 20 KV Targu Lapus - Lapusu Romanesc, derivatia Grosii Tiblesului,

racord PTA 2 Greble

Racord aerian din LEA 20 KV Somcuta - Mina, derivatia Hovrila

Derivatia LEA 20 kV Vistisoara, Statia 110 / 20 kV Ucea

Construirea unui punct de conexiune PC 20 kV in anvelopa din metal / beton, amplasat langa PT MHC Vistisoara. Racordarea PC 20 kV proiectat prin LES 20 kV la derivatia 20 kV Vistisoara.

LEA 20 kV Sebes - Statia Fagaras - Sebes

Construirea unui punct de conexiune PC 20 kV in anvelopa din metal / beton, amplasat in incinta ingradita a MHC Sebes 3. Racordarea PC 20 kV se face prin LEA + LES 20 kV la LEA 20 kV Sebes inainte de recloserul R19FS. La una din cele 3 celule de racord MHC-uri se va racorda prin LES 20 kV ca instalatie de utilizare PT MHC2;

LEA 20 kV Sebes - Statia Fagaras - Sebes

Construirea unui punct de conexiune PC 20 kV in anvelopa din metal / beton, amplasat in incinta ingradita a MHC Sebes 3. PC 20 kV proiectat se va racorda la RED in LEA 20 kV Sebes, inainte de recloserul R19FS Sebes, printr-un circuit LEA+LES 20 kV. La una din cele 3 celule de racord MHC-uri se va racorda prin LES 20 kV ca instalatie de utilizare PT MHC1.

LEA 20 kV Harseni 1 - derivatia PTA 3 Dejani, Statia Fagaras 110 / 20 Kv

Construirea unui punct de conexiune PC 20 kV, amplasat in vecinatatea PT MHC pe domeniul public. Pentru racordarea la RED a MHC-ului se va realiza un LES 20 kV intre PC proiectat si LEA 20 kV PTA 3 Dejani.

LEA 110 kV Cisnadie - Marsa, Statia 110 / MT kV CHE Racovita

Pentru racordarea la RED a CHE Racovita, se va realiza pe fondurile utilizatorului o statie de 110 kV. Racordarea statiei proiectate se va face printr-un racord aerian in LEA 110 kV existenta Cisnadie - Marsa.

1.748 20

1.252 20

0.623 20

Stalpul nr. 140 al Derivatiei Cimpul Cetatii din LEA 20 kV Miercurea Nirajului

Construirea unui punct de conexiune si transformare PCT 20 kV in anvelopa din metal/beton cu exploatare din interior, amplasat pe domeniul public, in zona PTA 2 Cimpul Cetatii, dimensionat pentru trafo 20/0,4 kV 630 kVA.PCT 20 kV proiectat se va racorda la stalpul existent nr. 140 echipat cu separator din LEA 20 kV Derivatie Campul Cetatii printr-un LES 20 kV cu cablu de tip A2XS2Y 3x1x150/25 mmp in lungime de cca 10 ml si montarea pe stalp a unui cadru cu descarcatori ZnO si finale de 20 kV de exterior; Prezizare: in celula de linie cu intreruptor din PCT 20 kV proiectat se va racorda prin LES 20 kV PT MHC N2. Din PT MHC N2 se va racorda printr-un LES 20 kV PT MHC N1. Cele doua PT-uri (MHC N1 si MHC N2) precum si LES 20 kV de racord aferente reprez. instal. de utiliz. apartinand producatorului.

LEA 20 kV REGHIN - LAPUSNA, Derivatia PT 1 FANCEL, stalpul nr. 11 proiectat

Racord LEA 20 kV (in lungime de 25 m) al MHC - FANCEL, la LEA 20 kV REGHIN - LAPUSNA, Derivatia PT 1 FANCEL la stalpul nr. 11 proiectat, realizat cu 3 stalpi de beton, echipati dupa cum urmeaza : stalp echipat cu separator in montaj orizontal, CLP ; stalp echipat cu reanclansator 20 kV (telecomandat cu protectii), care se va integra in SAD al FDEE Electrica Distributie Transilvania Sud ; stalp echipat cu grup de masura aerian 20 kV tip exterior, cu 3 TT, 3 TC, analizor clasa A pentru monitorizarea calitatii energiei electrice in punctul de delimitare si contor electronic in montaj indirect. Precizare: La bornele de legatura ale LES 20 kV iesire din grupul de masura aerian, plecare PT producator, urmeaza a se racorda ca instalatie de utilizare prin LES 20 kV, un post trafo 0,4 /20 kV - 1600 kVA, proprietatea utilizatorului.

La distribuitorul LEA 20 kV, St. 110/20 kV Campeni-Avram Iancu, stalpul 218

Construirea unui Punct de Conexiuni ( PC 20 kV) in constructie independenta cu actionare din interior, amplasat langa MHC 2, cu echipament de comutatie in SF 6 pentru separatoare si in vid pentru intreruptoare. Racordarea PC proiectat prin LES 20 kV (L= 50m) la distribuitorul LEA 20 kV St. 110/20 Campeni-Avram Iancu, stalpul 218 care se va echipa cu un separator in montaj vertical, descarcatori cu ZnO si capete terminale. Precizare : la celula trafo se va racorda prin LES 20 kV un trafo ridicator de 0,4/20 kV- 800 kVA ca instalatie de utilizare ;

0.950 20

1.103 20

1.238

0.934 20

4.896 20

97 110+20 Nehoiasu

5.066 20 Comarnic

Derivatia LEA 20 kV PTA Casoaia, Statia 110 / 20 kV Cimpeni

Construirea unui punct de conexiune PC 20 kV in anvelopa din metal / beton, amplasat in apropierea stalpului de racord a MHC la derivatia PTA Casoaia a LEA 20 kV Avram Iancu. Racordarea PC 20 kV proiectat la derivatia PTA Casoaia se va realiza prin LES 20 kV.

La distribuitorul LEA 20 kV, St. 110/20 kV Campeni-Avram Iancu, stalpul 282

Construirea unui Punct de Conexiuni ( PC 20 kV) in constructie zidita cu actionare din interior, amplasat langa MHC 1, cu echipament de comutatie in SF 6 pentru separatoare si in vid pentru intreruptoare. Racordarea PC proiectat prin LES 20 kV (L= 85m) la distribuitorul LEA 20 kV St. 110/20 Campeni-Avram Iancu, stalpul 282 care se va inlocui cu un stalp tip 15014 si se va echipa cu separator in montaj vertical, descarcatori cu ZnO si capete terminale; Precizare : la celula trafo se va racorda prin LES 20 kV un trafo ridicator de 0,4/20 kV- 1250 kVA ca instalatie de utilizare.

LEA 20 kV Racord, PTA 1 Comanesti

Racord subteran 20 kV pentru PT al MHC-2 in lungime de Lp=1300m, realizat prin plantarea unui stalp in aliniamentul racordului PTA nr.1 Comanesti, si pozarea cablului intre stalpul nou plantat si PT al MHC-2. Construirea unui post de transformare (ridicator) 0,4/20/KV-de800kVA– la MHC-2. Construirea unei linii electrice subterane de 20 kV intre MHC-2 si MHC-1, in lungime de Lp=4275m. Construirea unui post de transformare (ridicator) 0,4/20/KV-de800kVA – la MHC-1.

Derivatia LEA 20 kV, Chirui Selters

Construirea unui post de transformare (ridicator) 0,4 / 20 kV -1250kVA – la MHC. Construirea unei linii electrice subterane intre MHC si LEA 20 kV ORAS, in lungime profil de Lp= 45m. Conectarea retelei 20 kV proiectate la derivatia 20 kV Chirui + Selters se face la stalpul nr.157 al derivatiei.

LEA 20 kV derivatia Bilbor, Statia 110 / 20 kV Toplita spre Galautas si Statia 110 / 20 kV Borsec

Construirea unui punct de alimentare PA 20 kV in anvelopa din metal / beton, amplasat in vecinatatea PT MHC - T4. Se va racorda PA 20 kV proiectat prin LES 20 kV si LEA 20 kV la LEA 20 kV derivatia Bilbor.

extinderea sistemului de bare 110 kV din statia 110 kV Nehoiasu

celula 20 kV in statia de transformare 110/20 kV Comarnic

39.3 110 Marasesti

9.52 20 Patarlagele

9.12 20 Patarlagele

0.124 20 Valeni

4 20

21.852 110

0.5 20

0.99 20

0.32 20

110/20 kV Varfuri

1.12 20 110/20 kV Ponor

racord 110 kV in statia de transformare 110/20 kV Marasesti

racord 20 kV in statia de transformare 110/20 kV Patarlagele

racord 20 kV in statia de transformare 110/20 kV Patarlagele

racord 20 kV din stalpul 77 bis al LEA 20 kV Faget

110/20 KV CERNAVODA

construirea unui punct de conexiune amplasat cat mai aproape de punctul de

racordare, racordat in sistem intrare - iesire in LEA 20 kV nr. 5604-stalpul 49,

alimentată din staţia 110/20 kV CERNAVODA

110/20 kV Crusovat

consta în linie mixta LEA / LES 110 kV pentru racordarea in antena a CHE Herculane in statia 110/20 kV Crusovat

110/20 kV Otelu Rosu

Punct de conexiune de 20 kV cu două compartimente (de racordare şi utilizator) racordat la LEA 20kV Iaz Muntele Mic.

110/20 KV Baru Mare

Punct de conexiune de 20 kV cu acţionare din interior, cu două compartimente (de racordare şi utilizator) racordat prin LES 20 kV la LEA 20 kV Petrila –derivatia Baru Mare - PTA 232, stalp nr 7.

Punct de conexiune de 20 kV cu acţionare din interior, cu două compartimente (de racordare şi utilizator) racordat prin LES 20 kV si LEA 20 kV la LEA 20 kV Varfuri - Harlagiu –racord 20 kV Sarbi ,

LEA 20 kV cu conductoare 50/8 mmp Al-Ol, în lungime de cca. 5 m, de la stalpul nr 440/57 al LEA 20 kV existente si cu

echiparea stalpului special proiectat SC 15014 cu separator 24 kV, set

descărcătoare cu ZnO cu disconector, terminale de exterior pentru LES 20 kV si

Rp< 4ohmi. - LES 20 kV în lungime de cca. 5 m cu cablu de Al cu izolaţie din polietilenă reticulată (XLPE) de grosime redusă,

3x185 mmp, montat în tub din polietilenă;

0.003583.396

110/20/6 kV Moldova Noua

bransament electric trifazat in lungime de 10 m din SE10, al LEA JT aferent PTA 7516,

20/0.4 KV, 250 KVA, montarea unei cutii de trecere LEA/LES pe stalpul nr.78 (prevazut cu

priza de pamant de 10 ohmi) si cablu de tip ACYAbY 3x25+16 mmp in lungime de 10 m,

protejat in tub flexibil din polietilena si montarea unui distribuitor la baza stalpului.-distribuitorul E1+2 va fi din policarbonat

armat cu fibra de sticla, modular, pe soclu de beton, cu compartiment separat pentru masura si vizibilitate pentru citirea contorului si va fi

Emitent Nr. ATR Obs. Legislatia

CEZ DISTRIBUTIE 6320 18.05.2012 6 luni 90/2008

CEZ DISTRIBUTIE 6321 18.05.2012 6 luni 90/2008

CEZ DISTRIBUTIE 1300000012 29.05.2012 6 luni 90/2008

CEZ DISTRIBUTIE 1300000011 29.05.2012 6 luni 90/2008

1000218363 30.05.2012 3 luni 90/2008

1000237461 27.06.2012 3 luni 90/2008

1000237437 27.06.2012 3 luni 90/2008

1000237466 27.06.2012 3 luni 90/2008

1000237447 27.06.2012 3 luni 90/2008

Data Emiterii/ Prelungirii

E.ON Moldova Distributie

E.ON Moldova Distributie

E.ON Moldova Distributie

E.ON Moldova Distributie

E.ON Moldova Distributie

Transelectrica 153 08.10.2012 ATR nou 90/2008

FDEE-EDTN 60201211157 30.03.2012 HG 90/2008

FDEE-EDTN 60301217640 24.09.2012 HG 90/2008

FDEE-EDTN 60301216411 12.06.2012 HG 90/2008

FDEE-EDTN 60301217796 13.07.2012 HG 90/2008

FDEE-EDTN 60301217784 28.08.2012 HG 90/2008

FDEE - EDTS 70101224190 3/29/2012 HG 90/2008

FDEE - EDTS 70101226311 4/27/2012 HG 90/2008

FDEE - EDTS 70101226312 5/2/2012 HG 90/2008

FDEE - EDTS 70101226658 5/8/2012 HG 90/2008

FDEE - EDTS 70201117716 27.10.2011 / HG 90/2008

Inlocuieste

ATR 70101004172 /

07.10.2010

Inlocuieste

ATR 70101114966 / 05.10.2011

Inlocuieste ATR

70101114969 / 05.10.2011

Inlocuieste ATR

70101121078 / 16.11.2011

FDEE - EDTS 70301223052 04.07.2012 / HG 90/2008

FDEE - EDTS 70301223661 01.10.2012 / HG 90/2008

FDEE - EDTS 70401005816 11.07.2012 / HG 90/2008

Inlocuieste

ATR 70301116385 / 10.01.2012

FDEE - EDTS 70401215381 10.05.2012 / HG 90/2008

FDEE - EDTS 70401217572 03.09.2012 / HG 90/2008

SDEE - HARGHITA 70501214765 26.09.2012 / HG 90/2008

SDEE - HARGHITA 70501214768 26.09.2012 / HG 90/2008

FDEE - EDTS 70501214998 12.10.2012 / HG 90/2008

FDEE-EDMN 30301104104 11/8/2011 HG 90/2008

FDEE-EDMN 30101227602 5/24/2012 3 luni HG 90/2008

Inlocuieste

ATR 70401110132 /

11.11.2011

Inlocuieste

ATR 70401005815 /

11.07.2012

Inlocuieste ATR

70501211217 / 13.02.2012

Inlocuieste

ATR 70501211216 /

13.02.2012

Inlocuieste

ATR 70501212131 /

12.04.2012

6 luni + prelungire 6 luni

FDEE-EDMN 30401217194 7/10/2012 6 luni HG 90/2008

FDEE-EDMN 30301206946 8/27/2012 3 luni HG 90/2008

FDEE-EDMN 30301206947 8/27/2012 3 luni HG 90/2008

FDEE-EDMN 30101231736 8/30/2012 3 luni HG 90/2008

6921 29.12.2011 90/2008

Enel Distributie Banat

235118

ATR prelungit

90/2008

Enel Distributie Banat

1294 08.08.2012 90/2008

Enel Distributie Banat

1198

ATR prelungit

90/2008

Enel Distributie Banat 1312 27/08/2012

90/2008

Enel Distributie Banat 1243 28/09/2012

90/2008

Enel Distributie Dobrogea

15-09-2011/07.03.2012

01.06.2012/24.08.2012

Enel Distributie Banat 1366 27/09/2012

90/2008

Stare ATR

18.11.2012 VALABIL PIF 2012

18.11.2012 VALABIL PIF 2012

29.11.2012 VALABIL PIF 2012

29.11.2012 VALABIL PIF 2012

11/30/2012 2013

27.09.2012 VALABIL 2012

27.09.2012 VALABIL 2015

27.09.2012 VALABIL 2015

27.09.2012 VALABIL 2015

Data expirarii ATR

Data estimata PIF

VALABIL

08.04.2013 Valabil 2017

30.09.2012 VALABIL

24.03.2013 VALABIL

12.12.2012 VALABIL

13.01.2013 VALABIL

28.11.2012 VALABIL

VALABIL 2013

27.10.2012 VALABIL 2013

11/2/2012 VALABIL 2013

11/8/2012 VALABIL 2013

10/27/2012 VALABIL 2013

29.09.2012

1/4/2013 VALABIL 2013

4/1/2013 VALABIL 2013

1/11/2013 VALABIL 2013

11/10/2012 VALABIL 2013

3/3/2013 VALABIL 2013

3/26/2013 VALABIL 2013

3/26/2013 VALABIL 2013

4/12/2013 VALABIL 2013

11/8/2012

8/24/2012 VALABIL

VALABIL, adresa

prelungire valabilitate nr.

1195/04.05.2012

1/10/2013 VALABIL

11/27/2012 VALABIL

11/27/2012 VALABIL

11/30/2012 VALABIL

29.03.2012 valabil

15/09/2012

VALABIL

08.11.2012

VALABIL

30.09.2013

nu

01.12.2012

VALABIL

trim III 2012

nu

27/11/2012

VALABIL

sem II 2013

nu

28/12/2012

VALABIL

6/30/2013

nu

LEA 110 kV Balta Sarata – Armenis, 23,76 km, 585 mmp, 850 ALEA 110 kV Caransebes - Resita, 9,16 km, 585 mmp, 850 A

27/12/2012

VALABIL

12/31/2012

nu

Data: 05.11.2012Codul culorilor ATR emise de:

Transelectrica Enel DobrogeaE.ON Moldova

CEZ

Enel MunteniaEnel BanatATR ExpirateATR Noi

Denumire investitor Judetul U(kV)

1 SC SORTILEMN SA Cluj 1.40 20

2 Cluj 11.00 20

3 SC SANA RA SRL Satu Mare 1.6 20

4 SC M.I.S-GRUP SRL 5.5 20

5 Satu Mare HARGHITA 7.500 20

6 SC AGRO ITAL SRL Buzau 2.1 20

7 ELECTRAWINDS - R SA Harsova Constanta 20 110

8

Suceava 10 110

Electrica Transilvania NordElectrica Transilvania sud

Electrica Muntenia Nord

Nr. crt

Denumire centrale electrice

Putere instalata (MW)

Centrala electrica pe biomasa loc. Gherla

SC ROMITA ENERGIE VERDE SRL

Centrala electrica pe biomasa loc. Rascruci

Centr. el. pe biomasa Carei

Centr. el. pe biomasă Anieş

Bistriţa-Năsăud

SC GENERA AVANTE SRL

sat Gara Cilibia, comuna Cilibia

SC EGGER ROMANIA SRL

Centrala termoelectrica biomasa 10MW HOLZINDUSTRIE

9

SC ENOL GRUP SA Neamt 3.73 20

10

Neamt 3.4 20Total 66.230

INSTALATII DE PRODUCERE A ENERGIEI ELECTRICE DIN DESEURI MENAJERE

SC ELECTRAWINDS GENCO BIOMASS SRL

CENTRALA ELECTRICA BIOMASA 3,4 MW , Alexandru cel Bun, jud. Neamt

Comentariu Emitent Nr. ATR

Gherla Racordarea unui grup generator asincron in instalatia de utilizare FDEE - EDTN 60101221587

Jucu Racord LES 20 KV din statia Jucu FDEE - EDTN 60101225430

Carei-1 Racord LES 20 KV din statia Carei 1 FDEE-EDTN 60401206301

Rodna Racord LES 20 KV din statia Rodna FDEE-EDTN 60501207019

FDEE - EDTS 70501106073

Pogoanele racord 20 kV din stalpul nr. 192 al LEA 20 kV Caragele FDEE EDMN 30301205596

18

Egger Statia Egger 1000299969

Staţia de racord

Distribuitorul LEA 20 kV Vlahita - Odorhei, Statia 110 / 20 / 6 kV Vlahita si Statia 110 / 20 kV Odorhei

Construirea unui punct de conexiune PC 20 kV in anvelopa din metal / beton, amplasat in apropierea LEA 20 kV Vlahita - Odorhei. Racordarea PC 20 kV proiectat se va realiza prin 2 x LES 20 kV racordate la distribuitorul LEA 20 kV Vlahita - Odorhei.

110/20 kV Harsova Oras

Montarea unei celule noi LEA 110 kV echipata complet in statia Harsova Oras ( cu intrerupator cu comanda uni-tripolara si RAR monofazat)

Enel Distributie Dobrogea

E.ON Moldova Distributie

LEA 20 kV nou proiectata 1000203831

Sarata racord in LEA 20 kV Sarata – Vaduri, stalpul 93 1000294841

I.M.Roman(IMR)

E.ON Moldova Distributie

E.ON Moldova Distributie

Obs. Legislatia Stare ATR

27.04.2012 HG 90/2008 Nu e cazul Realizat PIF

27.09.2012 HG 90/2008 27.03.2013 VALABIL

11.04.2012 HG 90/2008 11.10.2012 VALABIL

17.09.2012 HG 90/2008 17.03.2013 VALABIL

13.10.2011 / HG 90/2008 4/13/2012 VALABIL 2012

6/6/2012 3 luni+prelungire 3 luniHG 90/2008 12/6/2012

03.05.2012 90/2008 03.11.2012 VALABIL

05.10.2012 6 luni 90/2008 05.04.2013 VALABIL 2012

Data Emiterii/ Prelungirii

Data expirarii ATR

Data estimata

PIF

VALABIL, adresa

prelungire nr. 2584/04.09.201

2

Trim IV 2013

25.07.2012 3 luni 90/2008 25.10.2012 VALABIL 2013

02.10.2012 3 luni 90/2008 02.01.2013 VALABIL 2014

Data: 05.11.2012Codul culorilor ATR emise de:

Transelectrica Enel DobrogeaE.ON Moldova

CEZ

Enel MunteniaEnel BanatATR ExpirateATR Noi

Denumire investitor Judetul U(kV)

1 SC LUCA ENERGY SRL Bihor 2.1 20

2 SC FORVILA SRL Bihor 0.637 20

3 MODLIFT Tufesti Braila 0.5 20

4 MAREX SA Tufesti Braila 2 20

5 PROD IMPORT CDC Frecatei Tulcea 0.5 20

6 ECOBIOGAZ SRL Vidra Ilfov 14 110

Total 19.737

Electrica Transilvania NordElectrica Transilvania sud

Electrica Muntenia Nord

Nr. crt

Denumire centrale electrice

Putere instalata (MW)

Centr. el. pe biogaz Tinca

CE pe biogaz, loc. Cauaceu

Staţia de racord Comentariu Emitent Nr. ATR

Salonta Racord aerian din LEA 20 KV Salonta - Beius FDEE-EDTN 60201214146

FDEE-EDTN 60201213641

CUZA VODA FDEE EDMN 30201205306

GROPENI FDEE EDMN 30201207123

6922

15

PTab Ferma Pasari Cauaceu

Racord subteran LES 20 KV din PTab Ferma Pasari Cauaceu

racord aerian 20 kV din stalpul nr. 62 al buclei 20 kV Cuza Voda - Tufesti cu LEA 20 kV Gropeni - KM. 209

racord aerian 20 kV din stalpul nr. 64 al LEA 20 kV Gropeni - SP 1A

110/20 kV Tulcea Vest

racordarea CEBiogaz Frecatei - 0,5 MW se va realiza prin construirea unui punct de conexiune,

racordat la stalpul nr.19 al LEA 20 kV 93.04 derivatie PT 94 Frecatei, alimentată din staţia de

transformare Tulcea Vest.

ENEL Distributie Dobrogea

110/20kV Jilava ; 110/20kV Colibasi

● realizare LEA 110 kV dublu circuit pentru încadrarea statiei de conexiune „intrare - iesire” in

LEA 110 kV Jilava - Colibasi, echipata cu fibra optica, in lungime de maxim 0,5 km;

● realizare staţie electrica de conexiune 110 kV conectata intrare - ieşire in LEA 110 kV Jilava -

Colibasi, integrata in sistemul de telecontrol existent la Enel Distributie Muntenia;

ENEL Distributie Muntenia

Obs. Legislatia Stare ATR

10.08.2012 HG 90/2008 10.02.2013 VALABIL

04.09.2012 HG 90/2008 04.03.2013 VALABIL

2/1/20123 luni+prelungire 3 luniHG 90/2008 5/1/2012

7/13/2012 3 luni HG 90/2008 10/13/2012 VALABIL

22.12.2011 90/2008 22.03.2012 VALABIL 2012

09.01.2012

90/2008

09.07.2012 VALABIL

Data Emiterii/ Prelungirii

Data expirarii ATR

Data estimata

PIF

VALABIL, adresa

prelungire nr. 1165/02.05.2012

decembrie 2012

Data: 05.11.2012Codul culorilor ATR emise de:

Transelectrica Enel DobrogeaE.ON MoldovaElectrica Transilvania NordElectrica Transilvania sudCEZElectrica Muntenia NordEnel MunteniaEnel BanatATR ExpirateATR Noi

Nr. crt Denumire investitor Denumire centrale electrice Judetul

1 PRO AIR CLEAN Slobozia Ialomita 0.6

2 Giurgiu Giurgiu 17.604

3 SOHIPI SRL Codlea BRASOV 1.413

4 SOCERAM SA Doicesti Dambovita 1.063

Putere instalata

(MW)

UZINA TERMOELECTRICA GIURGIU SA

5 MAREX SA Braila Braila 3

6 SC ELECTRA BIO ENERGY SRL Bihor 0.125

7 SC ELECTRA BIO ENERGY SRL Bihor 0.125

8 S.C. AGRO TRUST S.R.L. Teleorman 0.50

9 SC PRODCHIM BALS

Olt

0.99

Total 25.42

Centr. termo în cogen. Aleşd, str. Arena Sportivă

Centr. termo în cogen. Aleşd, str. E. Palade

Centrala bio regenerabile, Segarcea Vale, jud. Teleorman

Centrala de producere energie electrica si termica din BIOGAZ ,In BALS,str.N.BALCESCU,nr192

U(kV) Comentariu Emitent Nr. ATR

20 27384 8/1/2012

110 23 29.06.2012

20 FDEE - EDTS 70101122865 23.12.2011 /

20 Aninoasa FDEE EDMN 30601211807 9/26/2012

Staţia de racord

Data Emiterii/ Prelungirii

110/20 kV Slobozia

Nord

montare celula de masura / utilizator UT in compartimentul de racordare Enel aferent punctului de conexiune 8646

existent si montare contor cu kit

ENEL Distributie Dobrogea

110 kV CET

Giurgiu

montare contor masura energie produsa, montat in instalatiile utilizatorului

ENEL Distributie Muntenia

LEA 20 kV Avicola Codlea, Statia 110 / 20 kV Codlea si Statia 110 / 20 kV Fagaras (separator deschis)

Construirea unui punct de conexiune PC 20 kV in anvelopa din metal / beton, amplasat la limita de proprietate. Racordarea PC 20 kV proiectat la RED se va realiza prin 2 x LES 20 kV intre celulele de linie din PC si LEA 20 kV Avicola Codlea (intrare - iesire). Pe fonduri de beneficiar se va realiza un post de transformare ridicator 0,4 / 20 kV in anvelopa de metal / beton.

celula Ceramica 1 si Ceramica 2 din statia de transformare 110/20 kV Aninoasa

20 FDEE EDMN 30201208256 9/25/2012

0.4 Bransamnet trifazat subteran FDEE-EDTN 60201211931 09.04.2012

0.4 Bransamnet trifazat subteran FDEE-EDTN 60201211932 10.04.2012

20 1300000018 02.10.2012

20 1300000010 23.05.2012

Lacu Sarat si Braila

Sud

PC 20 kV nou racordat prin LEA+LES din LEA 20 kV Lacu Sarat - Statiunea Lacu Sarat si din LEA 20 kV Redresor-Braila Sud

PTab New Peco Alesd

PTA Epurare Alesd

statia110/20 kV Segarcea

Stalpul nr.39 A,tip SC 15014,proiectat in axul LEA 20 Kv Segarcea-Putineiu;

SC CEZ DISTRIBUTIE

Statia 110/20 Kv Bals

LES 20 KV PT Anvelopa Rompetrol – PTCZ Uzina de Reparatii (din LEA 20 KV Bals – Branet) SC CEZ

DISTRIBUTIE

Obs. Stare ATR

90/2008 11/1/2012 VALABIL

2012

90/2008 29.12.2012 VALABIL

2012

HG 90/2008 6/23/2012 VALABIL

3 luni HG 90/2008 12/26/2012 VALABIL Nu sunt prevazute

Legislatia

Data expirarii

ATR

Data estimata

PIF

3 luni HG 90/2008 12/25/2012 VALABIL Nu sunt prevazute

09.10.2012 VALABIL

10.10.2012 VALABIL

3 luni 90/2008 02.01.2012 VALABIL PIF 2012

3 luni 90/2008 23.08.2012 VALABIL PIF 2012 nu este cazul

HG 90/2008

HG 90/2008

Data: 05.11.2012Codul culorilor ATR emise de:

Transelectrica Enel DobrogeaE.ON Moldova

CEZ

Enel MunteniaEnel BanatATR ExpirateATR Noi

Denumire investitor Judetul U(kV)

1

ELECTRAWINDS-R SA Fierbinti Ialomita 10 20

2

TERRA MUNTENIA SRL Modelu Calarasi 7.4 20

3

Medgidia Constanta 1 20

Electrica Transilvania NordElectrica Transilvania sud

Electrica Muntenia Nord

Nr. crt

Denumire centrale electrice

Putere instalata

(MW)

PRIMARIA MUNICIPIULUI MEDGIDIA

4

Comuna Agigea Agigea Constanta 0.975 20

5

Facaeni Ialomita 3 20

6

BARUCH SRL Nuci Calarasi 5.8 20

7

SUNFIELDS NORD SRL Slobozia Ialomita 2 20

8

Calarasi Calarasi 2 20

9

Randunica Tulcea 4 110

HAPPY SUN ENERGY SRL

ELECTRA BIO ENERGY SRL

NEW CALORIC SISTEM SRL

10

Randunica Tulcea 4 110

11ICPE SA Agigea Constanta 0.5 20

12 Frasinet-2 Calarasi 8.3 20

13 Frasinet-3 Calarasi 4.6 20

14 Stanesti Giurgiu 7.5 20

15

Frasinet-1 Calarasi 9.9 110

16

Modelu Calarasi 84 110

17 SC Metalluk SRL Iaz Caras-Severin 48 110

18 CCC Alum Tulcea 430 400

19

Consiliul Local Mogosoaia Mogosoaia Ilfov 1.995 20

20

SYK ASSET SRL Colibasi-2 Giurgiu 2.000 20

VOLTAIC AVANGARD SRL

SC SOLAR ELECTRIC Frasinet SRL

SC Solar Electric Mostistea SRL

SC Long Bridge Milenium SRL

SC SOLAR ELECTRIC CALARASI SRL

SC TERRA MUNTENIA SRL

SC VIMETCO POWER ROMANIA SRL

21

Colibasi-1 Giurgiu 0.990 20

22

CFV Camp 1+2 Giurgiu 50.000 110

23

CFV Camp 3 Giurgiu 50.000 110

24LEMAR GRUP SRL Chiriacu Giurgiu 6.400 20

25Slobozia Giurgiu 1.000 20

26CDG SRL Slobozia Giurgiu 1.500 20

27

TURBO CONSULT SRL Vidra Ilfov 0.35000 20

28Mironesti Giurgiu 1.56050 20

HERMES BUSSINES CENTER SRL

SUN GARDEN COLIBASI SRL

SUN GARDEN COLIBASI SRL

COVASNA ESTIVAL 2002 SRL

INTERACTIVE TECHNICAL SERVICES SA

29

BORRA ENERGY PLANT S Izvoarele Giurgiu 38.00 110

30

Obedeni-Bucsani Giurgiu 2.00 20

31

MAR-TIN SRL Uiesti-Bucsani Giurgiu 8.50 20

32SOLAR PARTNERS SRL Dambovita 1 20

GAMA ENERGOTOTAL SRL

sat Izvoru, comuna Visina

33

Dambovita 1 20

34

N&H E COMMERCE SRL Buzau Buzau 1 20

35

VH-EP SOLAR SRL Tintesti Buzau 2.5 20

36

V-RO CENT GROUP SRL Ciorani Prahova 2.5 20

37

L.C.T. SOLAR SRL Faurei Braila 4 20

38

Gura Ocnitei 1 Targoviste 9 20

39

Sahateni Buzau 10 20

40

NORTH SOLAR SRL Pietrosu-Costesti Buzau 4 20

41

Satu Nou-Panciu Vrancea 0.006 0.4

42

COMUNA RACOVITENI Racoviteni Buzau 0.98 20

43

Braila 6 20

SOLAR UNIQUE ENERGY PARTNERS SRL

sat Brosteni, comuna Visina

ELECTRASOL PROIECT SRL

SOCOMIZO ENERGY INVESTMENT SRL

GAVRILA RAMONA-CRISTINA

MONTANA RES ENERGY SRL

Stancuta - Cuza Voda

44

RUNCU ENERGIA SRL Baraganul Braila 2.5 20

45

LOVRIN 2 ENERGIA SRL Baraganul Braila 2.5 20

46

ALPHA METAL SA Ianca Braila 2.5 20

47

ORAS MIZIL Mizil Prahova 1.7 20

48

Zaplazi-Topliceni Buzau 2.5 20

49

LESMONTAJ SRL Brebu Prahova 0.11 0.4

50

Jugureni-Uliesti Dambovita 1.72 20

51

Balteni-Contesti Dambovita 48 110

52

Berlesti-Ianca Braila 5 20

53

Aricestii Rahtivani Prahova 8.356 20

54

Prahova 2.9 20

TOPLICENI GREEN ENERGY SRL

ENERGO NATUR IMPEX SRL

BORRA ENERGY DANUBE SRL

ENERGREEN DISTRIBUTION SRL

ALLIANSO PARK MANAGEMENT SRL (VAROKUB ENERGY SRL)

FLORESCENT ENERGY SRL

sat Catina, comuna Floresti

55

Ciorani Prahova 2.9 20

56

SOLVAL ENERGY SRL Baicoi Prahova 2.5 20

57

Rascaeti Dambovita 2.5 20

58

Visina Dambovita 2.5 20

59

AGRO BIO CODRU SRL Galbenu Braila 2.4 20

60

Brezoia Dambovita 2.45 20

61

DANIELLI DESIGN SRL Brezoia Dambovita 0.95 20

62

KENTAX ENERGY SRL Butimanu Dambovita 7.5 20

63

ENERGIAFOTO SRL Cuza Voda (Stancuta) Braila 2.9 20

64

ENERGIAFOTO SRL Stancuta Braila 2.9 20

65

ENERGIAFOTO SRL Stancuta Braila 2.9 20

FUTURE ENERGY CLEAN SRL

ENERGO NATUR RASCAIETI SRL

ENERGO NATUR VISINA SRL

GREEN ENERGY SYSTEMS SRL

66

C.A. Rosetti Buzau 10 20

67

Costache Negri Galati 0.5 20

68

Magurele Prahova 2.9 20

69

Crangurile Dambovita 2.98 20

70

UNIQUE SOLAR SRL Butimanu Dambovita 2.98 20

71

DECRIS INDUSTRY SRL Cocorastii Colt Prahova 2.98 20

72

ATT DEVELOPMENT SRL Filipestii de Targ Prahova 1 20

73

Vulturu Vrancea 9.5 20

74

Tataranu Vrancea 2.9 20

75

Tataranu Vrancea 2.7 20

76

Tataranu Vrancea 2.5 20

GREEN ENERGY INVESTMENT SRL

B&B AGRO HOLDING SRL

EWE MAGURELE SOLAR SRL

MOBILE TEAM SOLAR GROUP SRL

VRANCEA ENERGY INVESTMENT SRL

KEY FACILITY SOLUTION SRL

KEY FACILITY SOLUTION SRL

BOOKING ENERGY DEVELOPMENT SRL

77

Dambovita 0.656 20

78

SORSTE SA Focsani Vrancea 0.4 20

79

Aricestii Rahtivani Prahova 0.0045 0.4

80

NITO SOLAR SRL Dambovita 7 20

81

Ploiesti Prahova 0.2625 20

82

Ciocanesti Dambovita 2.5 20

83

Produlesti Dambovita 2.5 20

84

Prahova 5 20

85

TOMA CALIN-VALENTIN Aricestii Rahtivani Prahova 2 20

86

MAYA GIA PROD SRL Ciocanesti Dambovita 2 20

87

Urlati Prahova 2 20

M&D CONS INVESTITII SRL

sat Pitaru, comuna Potlogi

COMUNA ARICESTII RAHTIVANI

sat Colacu, comuna Racari

CONSILIUL JUDETEAN PRAHOVA

GREEN POWER ENERGY MARKET SRL

FRAN ENERGY GREEN SRL

VIR COMPANY INTERNATIONAL SRL

Darvari, Valea Calugareasca

FOTOVOLTAIC ENERGY SRL

88

Urlati Prahova 2 20

89

Urlati Prahova 2 20

90

Prahova 2 20

91

Prahova 2 20

92

Aricestii Rahtivani Prahova 9.5 20

93

Aricestii Rahtivani Prahova 8.5 20

94

CASA CRANG SRL Aricestii Rahtivani Prahova 9 20

95

Gura Ocnitei Dambovita 5 20

96

SUN ENGINEERING SRL Tartasesti Dambovita 2.8 20

97

EOL ENERGY SRL Mizil, zona Aerodrom Prahova 2.9 20

98

Gura Ocnitei Dambovita 10 20

SIMDAN GREEN LIGHT SRL

VALENERGY PROD INSTANT SRL

VARO FUTURE DEVELOPMENT SRL

DN 72 Ploiesti-Targoviste

VARO GREEN DEVELOPMENT SRL

DN 72 Ploiesti-Targoviste

SOLAR FUTURE ENERGY SRL

FORT GREEN ENERGY SRL

SOLAR GREEN ENERGY SRL

ELECTRASOL PROIECT SRL

99Dabuleni Dolj 7.5 20

100

Olt 9.9 110

101

Olt 9.9 110

102Mehedinti 7.4 20

103Mehedinti 9.9 20

104Dolj 7 20

105SC SUN ENERGHES SRL Dolj 4 20

106Dolj 2.9 20

107

Dolj 9.8 20

108SC SOLPRIM SRL Dolj 7.95 20

109

Olt 9.92 20

110

Olt 4.92 20

111Olt 7.02 20

112SC FOTON EPSILON SRL Mehedinti 7.5 20

113Dolj 4.98 20

114Dolj 9.97 20

115SC SOLAR KING SRL Gorj 3.69 20

116SC SIGTEX SRL Gorj 4.92 20

SC POTELU SOLAR SRL

Racordarea la RED centrala electrica

fotovoltaica in zona CILIENI 1 , JUD OLT

SC CAPMAN INTERNATIONAL SRL BUCURESTI

Racordarea la RED centrala electrica

fotovoltaica in zona CILIENI 2 , JUD OLT

SC CAPMAN INTERNATIONAL SRL BUCURESTI

Racordare centrala fotovoltaica Filiasi

Fotovoltaic Prod&Distribution SRL

Racordare centrala fotovoltaica Filiasi

Power Regenerabil Energy SRL

Racordare la SEN a CEF Urzicuta,7 MW

SC SOLARIA GREEN ENERGY SRL

Racordare la SEN a CEF Urzicuta,4 MW

Racordare la RED a CEF situata in Bailesti,str.Eroilor,2.9 MW

SC GEKO FAIRY LAND SRL

RACORDAREA LA RED A CENTRALEI FOTOVOltAICE 1.5 MW IN COM.LEU SAT JIANCA,

JUDETUL DOLJ

SC NIDE COM SERV SRL CRAIOVA

Racordare la RED a CEF situata in com.Simnicu de Sus

T85/P1,P2

Racordare la RED centrala fotovoltaica Iancu Jianu T64/4,

judetul OltSC VIABLE ENERGYSRL

BOTOSANI

Racordare la RED fotovoltaica Iancu Jianu T63/3, judetul Olt

SC ALFA GREEN ENERGY SRL

Racordare la RED centrala fotovoltaica Iancu Jianu, T 63/2,

judetul Olt

SC SOLAR REGENERABIL SRLBOTOSANI

Racordare centrala fotovoltaica Burila Mica

SC BIOENERGY Green Podari SRL

Racordare la RED a CEF situata in Podari T77 /P2

SC MANAGEMENT BUILDYNG SRL

Racordare la RED a CEF situata in Podari T77/P3,P4

Parc fotovoltaic Poiana 1, sat Poiana, com.Turburea,

jud.Gorj

Parc fotovoltaic Poiana 2, sat Poiana, com.Turburea,

jud.Gorj

117Teleorman 6.05 20

118

SC EYE MALL SRL Gorj 9.99 20

119

SC PLENITA SOLAR GAMA SRL Panouri fotovoltaice Plenita Mehedinti 9 20

120

SC PLENITA SOLAR 1 SRL Panouri fotovoltaice Mehedinti 5 20

121

SC VEROSOL SRL Timisoara Dolj 3 20

122

SC PIAN DEL SOL SRL Dolj 3 20

123

SC LUMINA SOLAR SRL Dolj 3.50 20

124SC Country Projects SRL Mehedinti 2.5 20

125SC SMILY TOURS SRL OLT 8.18 20

126

Arges 5.97 20

127

Consiliul Local Topoloveni Arges 3.00 20

128

ARGES 1.23 20

129WDP DEVELOPMENT RO SRL Arges 0.63 20

130Arges 2 20

S.C. PHOTEIS ENERGIE SOLARA

Centrala fotovoltaica, Zimnicea, jud. Teleorman

Racordarea la SEN a centralei fotovoltaice - Parc 1, localitatea Carbunesti,

jud.Gorj

Racordare la RED a CEF situata in localitatea Bailesti

Racordare la RED a CEF situata in localitatea Bailesti

Racordare la RED Centrala electrica

fotovoltaica,Bailesti

Panouri fotovoltaice Vanatori

Racordarea la RED a centralei fotovoltaice IANCA TARLAUA 20

SC VERTICAL ENERGY VOLT SRL , PITEST

Racordare la RED centrala fotovoltaica Comuna

DOMNESTI, str. DOMNESTI, FN , judetul

Arges

Alimentare cu energie electrica si racordare la

RED Centrala fotovoltaica in oras Topoloveni, jud.

Arges

SC SOLEK PROJECT ALPHA SRL

Racordare la RED centrala fotovoltaica Comuna

GOLESTI, FN , judetul Arges

Producere energie electrica in OARJA,OARJA TARLA

6

SC ASIST PRODUCTION HYGRO SRL-D

Parc fotovoltaic Cateasca,Coseru

131

SC PARC SOLAR MOLDOVENI Olt 2.68 20

132SC CORABIA SOLAR SRL Olt 7.00 20

133SC PAV GREEN ENERGY SRL Olt 0.99 20

134SC FOTON DELTA SRL Dolj 4.1 20

135SC JRD SOLAR SRL Teleorman 9.7 20

136S.C. EUROSILOZ S.A. Teleorman 0.99 20

137

SC AVICARVIL SRL Valcea 0.20 0.4

138Olt 9.49 20

139Olt 9.49 20

140Olt 8.25 20

141Mehedinti 7.40 20

142

SC EYE MALL SRL Gorj 9.99 20

143

SC Foton Teta SRL Panouri fotovoltaice Gruia Mehedinti 7.50 20

144Olt 7.00 20

145SC NEW CONCEPT SRL Olt 7.49 20

146SOLAR ENERGY TRITON Olt 23.76 110

147SC ECO DINAM GROUP SRL Dolj 1.95 20

Racordarea la RED CENTRALA

TOTOVOLTAICA SCORNICESTI-PISCANI

Racordare la RED centrala fotovoltaica CORABIA

Racordarea la RED centrala fotovoltaica Piatra

Olt ,

Racordare la RED centrala fotovoltaica ORAS BAILESTI, JUD DJ

Racordare la RED centrala fotovoltaica in localitatea

Mereni

Centrala fotovoltaica, Draganesti Vlasca, jud.

Teleorman

Racordare la RED centrala electrica fotovoltaica in

satul Francesti

SC SOLAR ELECTRIC MARUNTEI SRL URZICENI

Racordare la RED centrala fotovoltaica MARUNTEI ,

judetul Olt

SC SOLAR ELECTRIC COTEANA SRL URZICENI

Racordare la RED centrala fotovoltaica MARUNTEI ,

judetul Olt

SC GREEN SOLAR POWER SRL

Racordare la RED centrala fotovoltaica Bobicesti

Fotovoltaic Prod&Distribution SRL

Racordare centrala fotovoltaica Filiasi

Racordarea la SEN a centralei fotovoltaice - Parc 2, localitatea Carbunesti,

jud.Gorj

SC CARACAL SOLAR ALPHA SRL

Racordare la RED centrala fotovoltaica Caracal T122

Racordarea la RED Centrala fotovoltaica IANCA TARLAUA 19 i

Centrala electrica cu panouri fotovoltaice in

com.Iancu Jianu,jud.Olt

Racordare la RED Centrala electrica fotovoltaica,Cetate

148Olt 1.66 20

149SC ROMKUMULO SRL Olt 9.98 20

150SC REINVEST URZICENI SRL Olt 3.35 20

151Arges 3.8 20

152SC SOLAR RESOURCES SRL Teleorman 1.5 20

153

SC OMV PETROM SA Dolj 13.24 110

154

SC SUN& WIND ENERGY SRL Mehedinti 5.00 20

155 CEF Băiţa 1 Cluj 5.00 20

156 SC IRROM INDUSTRIE SRL CEF IRROM Cluj 6 20

157 CEF Stejeriş Cluj 5 20

158 SC ENERGY ECO SUN SRL CEF Iclod 2 Cluj 1.1 20

159 SC SUN GAL PRO SRL CEF Manasturel Cluj 3 20

160 CEF Băiţa 2 Cluj 5 20

161 SC LIGHT POWER FIVE SRL CEF Băiţa 3 Cluj 4 20

162 MCEF Cluj-Napoca Cluj 0.134 0.4

163 CEF Borsa Cluj 2.35 20

164 CEF Geaca Cluj 3.53 20

165 SC 9E INDUSTRY SRL CEF Badeni Cluj 4 20

166 SC F&B RO SRL CEF Tureni 1 Cluj 0.77 20

167 CEF Tureni 2 Cluj 0.202 20

168 SC CERTINVEST SRL CEF Oradea Bihor 1 20

169 SC DELALINA SRL CEF Gepiu Bihor 2.74 20

170 SC SEZ TRADE SRL CEF Voivozi Bihor 2.99 20

171 CEF Voivozi Bihor 2.99 20

RC DEVELOPMENT DVA RO SRL

Parc fotovoltaic in com. Bobicesti

Racordare la RED centrala fotovoltaica Bobicesti

Racordare la RED centrala fotovoltaica Bobicesti

DELTA FOTOVOLTAIC ENERGY SRL

MICESTI -PANOURI FOTOVOLTAICE

Centrala fotovoltaica, Tr. Magurele, jud. Teleorman

Centrala fotovoltaica in localitatea isalnita,jud.Dolj

Racordare parc fotovoltaic Recea

SC LIGHT ENERGY ONE SRL

SC LIGHT ENERGY FIVE SRL

SC LIGHT ENERGY FOUR SRL

SC KUERYO IMPORT EXPORT SRL

SC MEGASOL DELTA POWER SRL

SC ACV SOLAR ENERGY SRL

SC PRODUCTIE ENERGIE VERDE SRL

SC HTM DEVELOPMENT SRL

172 CEF Avram Iancu Bihor 5 20

173 SC WIND KONTOR SRL CEF Tomnatic Bihor 10 20174 SC FINAS PROJECT SRL CEF, loc. Chiribis Bihor 5.4 20

175 SC ENERGY DENSIT SRL CEF Berchez Maramures 2.98 20

176 SC ELBA SOLAR SRL CEF Vadu Izei Maramures 2.9 20

177 SC ENERGY DENSIT SRL Maramures 1.19 20

178 SC NEW SOLAR TCV SRL CEF Botiz Satu Mare 10 6

179 SC NORD SOLAR DOBA SRL CEF Doba Satu Mare 5.5 20

180 SC BSPG 5MW SRL CEF Ciuperceni Satu Mare 5 20

181 SC GPSB SOLARIS 48 SRL CEF Ciuperceni Satu Mare 48 110

182 CEF Tasnad Satu Mare 9.65 20

183 SC LIGOVIG SUN SRL CEF Acâş Satu Mare 3.5 20

184 MCEF Certeze Satu Mare 0.099 0.4

185 SC SPITZ SOLAR SRL MCEF, Carei Satu Mare 0.063 0,4

186 SC PRIBISUN ENERGY SRL CEF Babasesti Satu Mare 3.53 20

187 SC OSTRA SOLR SRL CEF Domneşti Bistrita-Nasaud 15.97 110

188 SC SOL ELECTRO BIS SRL CEF Sintereag Bistrita-Nasaud 2.8 20

189 CEF Domnesti Bistrita-Nasaud 3.78 20

190 CEF LIVEZILE Bistrita-Nasaud 3.78 20

191 CEF, loc LIVEZILE Bistrita-Nasaud 50 20

192 SC SOLAR FIELD UNU SRL CEF Somes Odorhei 1 Salaj 3.6 20

193 SC SOLAR FIELD DOI SRL CEF Somes Odorhei 2 Salaj 3.6 20

194

CAPATINA OCTAVIAN DAN BRASOV BRASOV 1.500 20

SC KRYPTON ENRGY ALFA SRL

CEF ENERGY DENSIT 2

SC WEST SOLAR ENERGY SRL

SC LDC COMPANY INTERNATIONAL SRL

SC PHOTOVOLTAIK FARM DOMNESTI SRL

SC PHOTOVOLTAIK FARM LIVEZILE SRL

SC PHOTOVOLTAIK FARM LIVEZILE SRL

195

UCEA DE SUS BRASOV 34.500 110

196

FELDIOARA BRASOV 2.500 20

SC GREEN VISION SEVEN SRL

SC TRUCHA PODEROSA SRL

197

SC ENERGY FUND SRL FELDIOARA BRASOV 2.500 20

198

SC ENERGY FUND SRL HARMAN BRASOV 3.625 20

199

SC METHEXIS SRL CODLEA BRASOV 2.100 20

200

SC ENERGY FUND SRL HĂRMAN - (2) BRASOV 1.500 20

201

SC ENERGY FUND SRL HĂRMAN - (3) BRASOV 1.700 20

202

SC ENERGY FUND SRL HĂRMAN - (4) BRASOV 3.700 20

203

SC RES OMNES SRL FELDIOARA BRASOV 5.450 20

204

ZARNESTI BRASOV 0.968 20

205

SC ECOSUN EXPERT SRL PODU OLT BRASOV 2.500 20

206

GRID (PARAU) BRASOV 61.828 110

SC BREM COMPANY SA

SC SOLAR PARK BRASOV SRL

207

UCEA DE SUS BRASOV 34.500 110

208

CODLEA BRASOV 1.075 20

209

DUMBRAVENI SIBIU 2.500 20

210

SC XPV SRL MIERCUREA SIBIULUI SIBIU 25.725 110

SC GREEN VISION SIX SRL

SC COVMIH PERFORMANCE SRL

SC GREEN VISION GROUP SRL

211

SC AS MANAGEMENT SRL PAUCEA SIBIU 1.000 20

212

AXENTE SEVER SIBIU 2.978 20

213

RACOVITA SIBIU 1.000 20

214

HOSMAN SIBIU 3.000 20

SC PHOTOVOLTAIC SIB ENERGY SRL

SC ORION AGRICULTURA SRL

SC SIFEE PV ENERGY SRL

215

AVRIG SUD SIBIU 7.520 20

216

HOSMAN SIBIU 1.200 20

217

DURABIL SRL SIBIU 2.970 20

218

SC PRO FARM CONSULT SRL BRUIU SIBIU 3.000 20

SC KRONOS SOLAR PROJECTS ANTINORI SRL

SC GREEN VISION THREE SRL

SAROS PE TARNAVE

219

COPSA MICA SIBIU 2.622 20

220

SC FRAMO ROMANIA SRL GURGHIU MURES 3.535 20

221

GHINDARI MURES 2.300 20

222

TARGU MURES MURES 7.000 20

SC YELLOW POWER SRL

SC CAPIDAVA PRODCOM SRL

SC ROYAL ENERGY INVEST SRL

223

SC SOL STARK POWER SRL TÂRNĂVENI MURES 45.000 110

224

STEJERIS MURES 4.900 20SC SOLAR ENERGO PARC SRL

225

MIHESU DE CAMPIE MURES 0.919 20

226

BLAJ ALBA 2.000 20

227

SC EKOTRICITY SRL PLAIESII DE JOS HARGHITA 35.000 110

SC LAS ALTERNATIV ENERGY SRL

ASOCIATIA DE DEZVOLTARE INTERCOMUNITARA BLAJ

228

LAZAREA HARGHITA 35.328 110

229

SC BART SRL HARGHITA 4.804 20

AIC SOLARSYSTEMS COMPANY SRL

CRISTURU SECUIESC - (4,33 MW)

230

SC BART SRL HARGHITA 4.498 20

231

SC ENERGY FUND SRL RECI COVASNA 1.656 20

232

SF.GHEORGHE COVASNA 2.488 20

233 TRAIAN Bacau 2 20

234 TRAIAN Bacau 3 20

235 SC COSELI SA IEPURENI Iasi 2 20

CRISTURU SECUIESC - (4,06 MW)

MUNICIPIUL SF.GHEORGHE

SC COD ENTERPRISE GRUP SRL

S.C. REGDIVERS ENERGY S.R.L.

236 Bacau 3 20

237 Tg. Frumos Iasi 0.999 20

238 APOSTOL ROMEO Neamt 0.94 20

239

Sannicolau Mare Timis 7.04 20

240

ENERGY DETA SRL Deta Timis 4.023 20

241

QUANTUM SOLAR SRL Bazos Timis 5.098 20

242

BERRY ENERGIA SRL Pischia Timis 1 20

243

Urdel Energy SRL Izvin Timis 6 20

SC SONY TEKH ENERGY SRL

PARC FOTOFOLTAIC Filipesti

SC MONTANA ENDLESS ENERGY

PARC FOTOVOLTAIC Zimbrul

SOLAR ENERGY CRISTAL SRL

244

BERSIM ENERGIA SRL Urseni Timis 0.875 20

245

Sebis-Prunisor Arad 7.5 20

246

Sebis-Prunisor Arad 7.5 20

247

Force Electric 2011 SRL Tormac Timis 2.05 20

248

PIRAMIDA SOARELUI Frumuseni Arad 2.99 20

249

Caransebes Caras-Severin 3.234 20

250

Satchinez Timis 1.244 20

251

Comuna Bethausen Bethausen Timis 0.42328 20

252

MP SCRIPT SRL Beregsau Mic Timis 3.306 20

GAMA & DELTA ENERGY SRL

DELTA & ZETA ENERGY SRL

MUNICIPIUL CARANSEBES

VETA ENERGIE RENOVATIE SRL

253

FORCESOLAR 2 SRL Cenei Timis 2 20

254

FORCESOLAR 3 SRL Sandra Timis 2 20

255

EMS'TECH SRL Parta Timis 1.996 20

256

Bocsa Caras-Severin 1.3 20

257

KOVACS & HEGYES SRL Nadlac Arad 2.5 20

258

GUIDANO ORLANDO SRL Manastiur Timis 2.042 20

THIROM PRECISION & ENGINEERING SRL

259

GUIDANO IMPIANTI SRL Mosnita Noua Timis 1 20

260

BIRTA GROUP SRL Calan Hunedoara 7 20

261

Lovrin-2 Timis 3.9 20

262

Lovrin-1 Timis 3.9 20

263

Salbagelu Nou Caras-Severin 1.99584 20

RIOS RENOVABLES SOLAR POWER S.R.L.

RIOS RENOVABLES SOLAR ENERGY S.R.L.

CRE CARAS RENEWABLE ENERGY SRL

264

Salbagelu Nou Caras-Severin 1.67376 20

265

Prunisor Arad 50 110

266

Satchinez Timis 2.57 20

CRE CARAS RENEWABLE ENERGY SRL

ESPAROM SOLAR ENERGY SRL

ELLEAERRE ENERGY SRL

267

INNOVATIVE PACK PRODUJimbolia Timis 2.5 20

Total 2179.07838

Staţia de racord Comentariu Emitent Nr. ATR

110/20 kV Hagiesti

27381

110/20 Calarasi

392

Medgidia 1

10028030

in statia 110/20 kV Hagiesti, cu montare grup de celule ( celula de linie si celula de adaptare), LES 20 kV intre statie si punctul de conexiune la limita statiei

ENEL Distributie Dobrogea

punct de conexiune de 20kV cu doua compartimente: un compartiment de racordare, pentru instalatiile din gestiunea operatorului de distributie (o celula de linie , o celula de masura) si un compartiment pentru instalatiile electrice ale producatorului, racordat in LEA 20kV Modelu 2 in portiunea de sectiune 120 mm2 s.c. inainte de stalpul nr. 85.

ENEL Distributie Dobrogea

Realizare racord din LEA 20 kV L5724 prin montarea unui stalp SC 15007 nou la aprox. 10 ml de primul stalp de trecere L5724 20 kV din LES in LEA, De pe stalpul nou montat realizare LES 20 kV in lungime de 1150 ml pana la punctul de conexiune (amplasat in dreptul Putului nr. 11 apartinand Primariei Medgidia), Echipare compartiment Enel aferent punctului de conexiune cu o celula de linie si o celula de masura 20 kV.

ENEL Distributie Dobrogea

6937

27382

110/20 KV Budesti 393

27387

395

28

110/20/10 kV Eforie Nord

punct de conexiune conectat radial prin racord 20 kV cu o lungime de 0.5 km la LEA 20 kV 1224 derivatie PTA 268 Moara Agigea; punctul de conexiune va fi amplasat in imediata apropiere a punctului de racordare si va fi prevazut un compartiment pentru instalatia de racordare-utilizat exclusiv de ENEL echipat cu o celula de linie si o celula de masura, un compartiment (nisa) pentru instalatia de masurare, in care se monteaza contorul + kitul de telecitire si un compartiment pentru instalatia de utilizare.

ENEL Distributie Dobrogea

110/20 kV Bordusani

echipare punct de conexiune amplasat in apropierea punctului de racordare, realizare LEA/LES 20 kV intre punctul de racordare si

punctul de conexiune, montare grup de masura in PC

ENEL Distributie Dobrogea

racordarea se realizeaza printr-un racord de 4,5 km intrare -iesire in LEA 20 kV Postavari, inainte

de stalp racord derivatie PTA 2698 Gruiu

ENEL Distributie Dobrogea

110/20 kV Slobozia Sud

realizare racord LEA/LES 20 kV intre punctul de racordare (st 12 al LEA 20 kV Irigatii 2) si punctul

de conexiune, echipare punct de conexiune amplasat in apropierea LEA 20 kV Irigarii 2

echipat cu o celula de linie si o celula de masura, montare grup de masura

ENEL Distributie Dobrogea

110/20 kv Mircea Voda

realizare racord LEA/LES 20 kV intre punctul de racordare (intre st 9 si 10 ai LEA 20 kVAvicola)

si punctul de conexiune, echipare punct de conexiune amplasat in apropierea LEA 20 kV

Avicola echipat cu doua celule de linie si o celula de masura, montare grup de masura

ENEL Distributie Dobrogea

110/20 kv Zebil

*Montare grup celule 20 kV in statia 110/20 kV Zebil (extindere sistem bare 20kV cu o celula de adaptare si o celula de linie);*Echipare punct de conexiune;*Realizare racord 20 kV intre celula linie nou montata in statia Zebil si punctul de conexiune;*Montare grup de masura in punctul de conexiune;*Montare transformator de putere 16 MVA 110/20 kV (trafo 2) in statia 110/20 kV Zebil.

ENEL Distributie Dobrogea

27

110/20/10 kV Eforie10028033

Mostistea se racordeaza la RET in statia 20kV Mostistea 2

Mostistea se racordeaza la RET in statia 20kV Mostistea 3

Ghizdaru se racordeaza in statia 20kV Ghizdaru 1

Mostistea Transelectrica 102

Pelicanu Transelectrica 100

Iaz Transelectrica 162

Tulcea Vest Transelectrica 48

Chitila 950

Colibasi 156

110/20 kv Zebil

*Montare grup celule 20 kV in statia 110/20 kV Zebil (extindere sistem bare 20kV cu o celula de adaptare si o celula de linie);*Echipare punct de conexiune;*Realizare racord 20 kV intre celula linie nou montata in statia Zebil si punctul de conexiune;*Montare grup de masura in punctul de conexiune;*Montare transformator de putere 16 MVA 110/20 kV (trafo 2) in statia 110/20 kV Zebil.

ENEL Distributie Dobrogea

punct de conexiune 20 kVconectat intrare - iesire in LES 20 kV 1223 ( inainte de iesirea in aerian)

ENEL Distributie Dobrogea

Transelectrica-ST Bucuresti

Transelectrica -ST Bucuresti

Transelectrica-ST Bucuresti

CFE 9.9 MW Frasinet-1 se racordează la reţeaua electrică de transport la 110 kV, in staţia

220/110/20 kV Mostistea, prin extinderea statiei cu o celula 110 kV aferenta LES 110 kV (L=4 km)

de la statia de transformare 110/20 kV

CFE 84 MW Modelu se racordează la reţeaua electrică de transport la 110 kV, in staţia 400/110

kV Pelicanu, prin utilizarea unei LES 110 kV (L=13 km)

Racordare la RET printr-o celula noua 110kV in statia 220/110kV Iaz printr-un LES 110kV

aprox.0,8km.

racordarea CCC Alum 430MW in statia Tulcea Vest,prin racord s.c. 400kV,in lung.totala de

aproximativ 4,5km

Montare punct de conexiune nou, racordat astfel: cu cablu 20kv, 3x(1x185) mmp intre stalpul

existent nr.7 si PC , si cu cablu 20kv, 3x(1x185) mmp intre stalpul proiectat nr.1 si PC

ENEL Distributie Muntenia

Lucrare coordonata pentru 4 utilizatori (3 producatori+1 consumator).Echipare Punct de Conexiune(prevazut cu doua sectii de bare),

racordat prin cablu 20kV dintr-o celula noua de linie ce se va monta in postul existent PT588, realizare legatura cu linia Varasti 20kV pe una din sectii, iar pe cealalta sectie de bare se va

introduce prin intrare-iesire LEA 20kV Dobreni.Lucrare specifica:montare celula de masura in punctul de conexiuni echipata cu

2TC100/5A si 2TT20/0.1kV

ENEL Distributie Muntenia

Colibasi 157

Giurgiu Nord 19

Giurgiu Nord 20

Cucuruzu 366

Giurgiu Vest 365

Giurgiu Vest 364

Copaceni 319

Hotarele 422

Lucrare coordonata pentru 4 utilizatori (3 producatori+1 consumator).Echipare Punct de Conexiune(prevazut cu doua sectii de bare),

racordat prin cablu 20kV dintr-o celula noua de linie ce se va monta in postul existent PT588, realizare legatura cu linia Varasti 20kV pe una din sectii, iar pe cealalta sectie de bare se va

introduce prin intrare-iesire LEA 20kV Dobreni.Lucrare specifica:montare celula de masura in punctul de conexiuni echipata cu

2TC100/5A si 2TT20/0.1kV

ENEL Distributie Muntenia

montarea unei celule noi LEA 110 kV in statia 110/20 kV Giurgiu Nord aferenta CFV Colibasi

Camp 1+2 – 50 MW echipata complet cu intreruptor cu comanda uni-tripolara si RAR

monofazat, lucrari anexe aferente

ENEL Distributie Muntenia

montarea unei celule noi LEA 110 kV in statia 110/20 kV Giurgiu Nord aferenta CEF SUN

GARDEN COLIBASI CAMP 3 – 50 MW echipata complet cu intreruptor cu comanda uni-tripolara si

RAR monofazat, lucrari anexe aferente;

ENEL Distributie Muntenia

montare punct de conexiune racordat in L 20KV SPPA23 , prin racord medie tensiune

3x1X185mmp.

ENEL Distributie Muntenia

Racord 20 KV de tip LES din LEA 20KV Mahiru pana la un punct de conexiune nou suprateran,

prefabricat

ENEL Distributie Muntenia

Racord 20 KV de tip LES din LEA 20KV Mahiru pana la un punct de conexiune nou suprateran,

prefabricat

ENEL Distributie Muntenia

LES de la un stalp de beton sc15006(nr.28) existent in axul liniei 20kv Cretesti , pana la un

post de transformare 800kVA 20/0.4kV, in anvelopa de beton, la limita de proprietate

ENEL Distributie Muntenia

echipare punct de conexiuni 20kV racordat la ST140 din LEA 20kV Arges 2.

ENEL Distributie Muntenia

29

Marsa 714

Marsa 709

Crovu FDEE EDMN 30601209589

Ghizdaru -Cucuruzu-Draganesti Vlasca

*realizare LEA 110 kV dublu circuit pentru încadrarea statiei de conexiune „intrare - iesire” in LEA 110 kV Ghizdaru - derivatia Cucuruzu - Draganesti Vlasca, echipata cu fibra optica in lungime de cca. 0,2 km;*statia de conexiuni 110 kV conectata intrare - ieşire in LEA 110 kV Ghizdaru - derivatia Cucuruzu - Draganesti Vlasca, se va integra in sistemul de telecontrol si va fi prevazuta cu:- doua celule de inalta tensiune echipate complet (fiecare cu cate un intrerupator cu comanda uni-tripolara si RAR monofazat); - bara colectoare 110 kV simpla rigida;- separator tripolar 110 kV montat intre barele colectoare 110 kV si plecarea spre utilizator, care asigura atat separarea instalatiei de racordare de instalatia de utilizare, cat si punctul de delimitare;- protectii adecvate in celulele de linie plecare spre statiile adiacente;- servicii interne c.c. si c.a.; serviciile interne de c.c. se vor asigura printr-o statie de energie, iar serviciile interne de c.a. 0,4 kV se vor asigura din instalatia utilizatorului;- contor masura energie produsa;- instalatie de legare la pamant;- gard de imprejmuire si drum de acces.* adaptare protecţii existente in statiile Ghizdaru, Cucuruzu si Draganesti Vlasca, in celulele aferente LEA 110 kV Ghizdaru - derivatia Cucuruzu - Draganesti Vlasca; în vederea asigurării condiţiilor de funcţionare pentru CEF Izvoarele;* realizare suport de transmisie pentru telecontrolul staţiei electrice de conexiune 110 kV „intrare – ieşire”, sistem de supraveghere antiefractie.* înlocuire întrerupător existent in statia Ghizdaru, aferent LEA 110 kV Ghizdaru - derivatia Cucuruzu - Draganesti Vlasca cu întrerupător cu comanda uni-tripolara si RAR monofazat;* montare celula noua 110 kV in statia Draganesti Vlasca, aferenta LEA 110 kV Ghizdaru - derivatia Cucuruzu - Draganesti Vlasca, cu întrerupător cu comanda uni-tripolara si RAR monofazat;* montare protectie diferentiala si fibra optica pe LEA 110 kV Ghizdaru – CEF Izvoarele (9 km);* montare protectie diferentiala la trei capete si fibra optica pe LEA 110 kV CEF Izvoarele – derivatia Cucuruzu - Draganesti Vlasca (20 km);

ENEL Distributie Muntenia

Racord LES 20kV AL 185mmp, in lungime de 4 km, derivatie din LEA 20kV situata intre PTA1231 si ST 87, foarte aproape de PTA1231. La randul

ei, acesta linie este derivatie din LEA 20kV Marsa-Goleasaca, ST 87 fiind situat la 6.6km de statia Marsa. Punct de conexiune nou amplasat in zona de realizare a derivatiei si cablu 20kV

LES (aproximativ 50m din cei 4 km, in functie de amplasarea PC fata de derivatia dintre PTA 1231

si ST87)

ENEL Distributie Muntenia

realizare centru satelit in incinta statiei 110/20kV Marsa, racordat in containerul de medie tensiune

din statie prin LES 20kV 240mmp. Din centrul satelit, LES 20kV 240mmp pana la un punct de

conexiune nou amplasat in afara statiei pe domeniu public/privat..

ENEL Distributie Muntenia

racord aerian din stalpul nr. 194 al LEA 20 kV Petresti

Crovu FDEE EDMN 30601209588

Maxenu FDEE EDMN 30301205815

Maxenu racord 20 kV in statia de transformare Maxenu FDEE EDMN 30301206108

Mizil FDEE EDMN 30101230517

Faurei FDEE EDMN 30201207324

Gura Ocnitei FDEE EDMN 30601212221

Sahateni FDEE EDMN 30301206295

Stalpu FDEE EDMN 30301206927

Sat Nou FDEE EDMN 30401212590

Ramnicu Sarat FDEE EDMN 30301207169

Cuza Voda FDEE EDMN 30201207647

racord aerian din stalpul nr. 17 al LEA 20 kV Derivatie PT 87 Izvoru din LEA 20 kV Petresti

racord aerian din stalpul nr. 2 al LEA 20 kV Derivatie PT 0030 si PT 9172, din LEA 20 kV Tintesti

racord 20 kV din Derivatia PT 1074 CRR Ciorani, din LEA 20 kV Ciorani

racord 20 kV in statia de transformare 110/20 kV Faurei

racord 20 kV in statia de transformare 110/20 kV Gura Ocnitei

racord 20 kV in statia de transformare 110/20 kV Sahateni

un racord 20 kV din stalpul nr. 40 al LEA 20 kV Stalpu-Gheraseni si un racord aerian din stalpul nr. 37 al LEA 20 kV d.c. Stalpu-Smeeni+Stalpu-Frasinu

bransament electric monofazat din reteaua electrica j.t. stradala alimentata din PT 5016 Sat Nou

racord 20 kV din stalpul nr. 378 al LEA 20 kV Racoviteni

celula noua 20 kV in statia de transformare 110/20 kV Cuza Voda

Baraganu FDEE EDMN 30201208049

Baraganu FDEE EDMN 30201208051

Ianca FDEE EDMN 30201205895

Mizil FDEE EDMN 30101233927

Ramnicu Sarat FDEE EDMN 30301233485

FDEE EDMN 30101225007

Crovu FDEE EDMN 30601107574

Mavrodin FDEE EDMN 30601209865

Ianca FDEE EDMN 30201206672

Movila Vulpii racord 20 kV in PC 2 Ploiesti West Park FDEE EDMN 30101228258

Floresti FDEE EDMN 30101233248

racord 20 kV din stalpul nr. 14 al LEA 20 kV Baraganu - SRPA 5

racord 20 kV din stalpul nr. 57 al LEA 20 kV Baraganu - SPE 1C1

racord 20 kV din stalpul nr. 85 al LEA 20 kV Ianca-Sutesti

racord 20 kV din stalpul nr. 22 bis al LEA 20 kV Tohani

derivația 20 kV PTA 217 Zaplazi, din LEA 20 kV Racoviteni

racord 0,4 kV din CD a PTA 204 Camp Brebu -20/0,4 kV - 160 kVA

racord 20 kV din st. nr. 6 al LEA 20 kV Derivatie PTA 0116 Jugureni, LEA 20 kV Petresti

celula 110 kV in statia de transformare 110/20 kV Mavrodin

racord 20 kV din stalpul nr. 54 al LEA 20 kV Derivatie SPP 7 ISG, din LEA Ianca - SPP 15

racord 20 kV din stalpul nr. 42 b al LEA 20 kV Moreni 1

Mizil FDEE EDMN 30101233260

Baicoi FDEE EDMN 30101228351

Mozaceni FDEE EDMN 30601208995

Mozaceni FDEE EDMN 30601208996

Jirlau FDEE EDMN 30201207030

Potlogi FDEE EDMN 30601210554

Potlogi FDEE EDMN 30601210568

Butimanu FDEE EDMN 30601210602

Cuza Voda FDEE EDMN 30201207079

Cuza Voda FDEE EDMN 30201207081

Cuza Voda FDEE EDMN 30201207083

racord 20 kV din stalpul nr. 6 al LEA 20 kV Ciorani Derivatie PT 1117 Plafar

racord 20 kV din LEA 20 kV Derivatie PTA 2001 Pompe Apa Tufeni din LEA 20 kV Mislea

racord 20 kV din stalpul nr. 15 al LEA 20 kV Derivatie PTA Vultureanca, din Derivatia Mozacu, din LEA 20 kV Visina

racord 20 kV din stalpul nr. 333 bis al Derivatiei 20 kV Fierbinti, din LEA 20 kV Visina

racord 20 kV din stalpul nr. 279 al LEA 20 kV Jirlau - Galbenu

stalpul nr. 245 bis al LEA 20 kV Derivatie Brezoaiele, din LEA 20 kV Avicola 4

stalpul nr. 245 bis al LEA 20 kV Derivatie Brezoaiele, din LEA 20 kV Avicola 4

celula 20 kV in statia de transformare 110/20 kV Butimanu

racord 20 kV din stalpul 149 al LEA 20 kV Cuza Voda - Petrol

racord 20 kV din stalpul 148 al LEA 20 kV Cuza Voda - SPP 1+2

racord 20 kV din stalpul 111 al LEA 20 kV Cuza Voda - SPP 1+2

Faurei celua 20 kV in statia de transformare Faurei FDEE EDMN 30201208123

Pechea FDEE EDMN 30501216332

Baltesti FDEE EDMN 30101230369

Patroaia FDEE EDMN 30601210979

Buftea FDEE EDMN 30601210980

Pastarnacu FDEE EDMN 30101230530

Floresti FDEE EDMN 30101230930

Vulturul FDEE EDMN 30401218598

Tataranu FDEE EDMN 30401220168

Tataranu FDEE EDMN 30401220162

Tataranu FDEE EDMN 30401219796

racord 20 kV din Derivatia PTA 5227 C. Negri - F. Vaci, din Derivatia PTA 5223 C. Negri CAP, din LEA 20 kV Pechea - Cudalbi 1

racord 20 kV din Derivatia Magurele, din bucla Podeni - Magurele

racord 20 kV din stalpul nr. 31 al LEA 20 kV Ionesti

racord 20 kV din stalpul nr. 5 al Derivatiei PT 0224 Sterianu, din LEA 20 kV Compresoare

racord 20 kV din stalpul nr. 33 bis (SC15014 nou) al LEA 20 kV Manesti

racord 20 kV din LEA 20 kV racord PT 2038 Filipestii de Targ din LEA 20 kV Moreni 2

celula 20 kV in statia de transformare 110/20 kV Vulturul

racord 20 kV din stalpul nr. 34 bis (SC15014 nou) al LEA 20 kV Tataranu-Ciorasti

PC 20 kV proiectat racordat in LEA 20 kV Ramniceni

PC 20 kV proiectat racordat in LEA 20 kV Tataru

Crovu racord 20 kV din LEA 20 kV Odobesti FDEE EDMN 30601211500

CEIL Focsani racord 20 kV din PA 2900 Filatura FDEE EDMN 30401219294

bransament trifazat FDEE EDMN 30101231175

Mavrodin FDEE EDMN 30601211966

Ploiesti Crang FDEE EDMN 30101232236

Mavrodin FDEE EDMN 30601212180

Titu FDEE EDMN 30601212269

FDEE EDMN 30101233037

Ploiesti Crang FDEE EDMN 30101233189

Mavrodin FDEE EDMN 30601211926

Urlati FDEE EDMN 30101233478

PTA 2097 Aricesti

celula 20 kV in statia de transformare 110/20 kV Mavrodin

PT 20/0,4 kV - 2 x630 kVA amplasat in subsolul cladirii Centrului de Afaceri

racord 20 kV din stalpul nr. 12 al Derivatiei PT 6189 Decindea, din LEA 20 kV Ghimpati

racord 20 kV din stalpul nr. 162 al LEA 20 kV Produlesti

Valea Calugareasca

PC 20 kV racordat prin LEA+LES 20 kV Combinat 1 in statia Valea Calugareasca

PC 20 kV racordat prin LEA+LES 20 kV din stalpul nr. 57 bis al LEA 20 kV Crang

PC 20 kV racordat prin LEA+LES 20 kV din stalpul nr. 285 al LEA 20 kV Ghimpati

PC 20 kV racordat prin LEA+LES 20 kV din stalpul nr. 15 al LEA 20 kV Scorus

Urlati FDEE EDMN 30101233480

Urlati FDEE EDMN 30101233481

Ploiesti Crang FDEE EDMN 30101233482

Ploiesti Crang FDEE EDMN 30101233483

Ploiesti Crang FDEE EDMN 30101233484

Ploiesti Crang FDEE EDMN 30101233485

Ploiesti Crang FDEE EDMN 30101233486

Gura Ocnitei FDEE EDMN 30101212624

Mavrodin FDEE EDMN 30601211901

Mizil FDEE EDMN 30101233602

Gura Ocnitei FDEE EDMN 30601212654

PC 20 kV racordat prin LEA+LES 20 kV din stalpul nr. 15 al LEA 20 kV Scorus

PC 20 kV racordat prin LEA+LES 20 kV din stalpul nr. 6 al Derivatiei PT 2095 SMA din LEA 20 kV Scorus

PC 20 kV racordat prin LEA+LES 20 kV din stalpul nr. 10 bis al LEA 20 kV Pompe

PC 20 kV racordat prin LEA+LES 20 kV din stalpul nr. 10 bis LEA 20 kV Pompe

celula 20 kV in statia de transformare 110/20 kV Ploiesti Crang

celula 20 kV in statia de transformare 110/20 kV Ploiesti Crang

celula 20 kV in statia de transformare 110/20 kV Ploiesti Crang

Celula 20 kV (Q20K) in statia de transformare Gura Ocnitei

PC 20 kV racordat prin LEA+LES 20 kV din stalpul nr. 150 al LEA 20 kV Zahar II

PC 20 kV racordat prin LEA+LES 20 kV din stalpul nr. 23 LEA 20 kV Tohani

celula 20 kV in statia de transformare Gura Ocnitei, amplificare trafo 2 la 25 MVA, amplificare ansamblu TSI 2+BS 2

Ocolna 1500000065

Studina- Corabia 7472

7473

110/20 kV Filiasi CEZ DISTRIBUTIE 1500000012

110/20 kV Filiasi CEZ DISTRIBUTIE 1500000073

Stalpul nr.407,SE8,aferent LEA 20 Kv Galicea SRP 12-16 CEZ DISTRIBUTIE 1500000087

LEA 20 Kv Bailesti-Segarcea CEZ DISTRIBUTIE 1500000086

Celula 20 Kv in statia 110/20 Kv Bailesti CEZ DISTRIBUTIE 1500000088

LEA 20 KV LEU- ZANOAGA CEZ DISTRIBUTIE 1500000023

110/20 Kv Ghercesti Celula 20 Kv in statia 110/20 Kv Ghercesti CEZ DISTRIBUTIE 1500000026

statia Iancu Jianu CEZ DISTRIBUTIE 1500000031

statia Iancu Jianu CEZ DISTRIBUTIE 1500000030

celula 20 kv in statia 110/20 Kv Iancu Jianu CEZ DISTRIBUTIE 1500000032

Statia Burila celula 20 kV nou montata in statia 110/20 KV Burila CEZ DISTRIBUTIE 1500000029

CEZ DISTRIBUTIE 1500000041

CEZ DISTRIBUTIE 1500000040

bara 20KV statia Filiasi stalpul nr.105A al LEA 20KV Turburea -Filiasi CEZ DISTRIBUTIE 1500000042

bara 20KV statia Filiasi stalpul nr.52A al LEA 20KV Filiasi - Petrol 2 CEZ DISTRIBUTIE 1500000043

celula de linie in statia Ocolna, LES 20 KV, 400m si PC cu 7 celule trafo

CEZ DISTRIBUTIE

Racordare statie 110/20Kv proiectata la LEA 110 Kv Studina -Corabia

CEZ DISTRIBUTIE

statie 110/20 kV nou proiectata

Racordare statie 110/20Kv proiectata la LEA 110 Kv Studina -Corabia

CEZ DISTRIBUTIE

la 20 kV in celula de rezerva care va fi echipata in statia Filiasi

la 20 kV in celula de rezerva care va fi echipata in statia Filiasi

statia 110/20 Kv Galicea Mare

statia 110/20 Kv Bailesti

statia 110/20 Kv Bailesti

STATIA 110/20 KV LEU

Se va echipa o celula 20 Kv de rezerva in statia 110/20Kv Iancu Jianu.Se vor inlocui trans.de forta 110/20 Kv,10MVA

cu 110/20 Kv,25 MVA.LES 20 Kv intre PC proiectat si Statia Iancu Jianu 110/20 KVA.

Se va echipa o celula 20 Kv de rezerva in statia 110/20Kv Iancu Jianu.Se vor inlocui trans.de forta 110/20 Kv,10MVA

cu 110/20 Kv,25 MVA.LES 20 Kv intre PC proiectat si Statia Iancu Jianu 110/20 KVA.

statia 110/20 Kv Iancu Jianu

Statia 110/20 Kv Plenita

Stalpul nr.83A,SC15014,intre stalpii nr.83 si 84 ai racordului 20 Kv Ferma Greaca

Statia 110/20 Kv Podari

Celula 20 Kv Management Buildings in statia 110/20 Kv podari

Celula existenta 20 Kv Ruptoare CEZ DISTRIBUTIE 1500000044

celula de linie 20KV CEZ DISTRIBUTIE 1500000051

110/20 kV Plenita Celula 20 Kv proiectata in statia 110/20 Kv Plenita; CEZ DISTRIBUTIE 1500000062

110/20 kV Plenita Stalpul nr.44,SC 15014,al LEA 20 Kv Plenita-Breasta; CEZ DISTRIBUTIE 1500000063

110/20/6 Kv Ocolna. CEZ DISTRIBUTIE 1500000050

CEZ DISTRIBUTIE 1500000056

Celula 20 Kv proiectata in statia 110/20 Kv Bailesti CEZ DISTRIBUTIE 1500000061

110/20 kV Cujmir CEZ DISTRIBUTIE 1500000064

stalpul nr. 66 tip SC 15007 al LEA 20 KV Potelu - Irigatii 1. CEZ DISTRIBUTIE 1500000055

CEZ DISTRIBUTIE 1500000060

CEZ DISTRIBUTIE 1500000049

statia 110/20 Kv FMEP CEZ DISTRIBUTIE 1500000066

CEZ DISTRIBUTIE 1500000046

CEZ DISTRIBUTIE 1500000053

Statia110/20 KV Zimnicea

bara 20KV statie Tg-Carbunesti

Celula de statie 20 Kv echipata cu intreruptor debrosabil in vid 24 Kv/630 A/16(25) kA-proiectata

statia 110/20/6 Kv Ocolna;

Celula 20 Kv in sala de conexiuni din statia 110/20/6 Kv Ocolna;

statia 110/20 Kv Bailesti

Stalpul nr.6 existent al derivatiei 20 Kv Vinatori aferent LEA 20 Kv Cujmir-Vanju Mare;

statia 110/20 Kv Potelu

statia 110/20 Kv Musetesti

stalp de racord proiectat nr.43 A tip SC 15014 in LEA 20 KV Musetesti – Schitu la 5 m de stalpul existent nr. 43.

Statia 110 / 20 kV Topoloveni

celula 20 KV proiectata din statia de transformare 110/20 KV Topoloveni.

stalpul nr. 119 al Derivatiei 20 KV Balastiera Golesti din LEA 20 KV FMEP – CHE Prundu.

statia 110/20 Kv Pitesti Sud

in PCT existent, in celula de masura (la iesirea din celula de masura).

statia 110/20 Kv Pitesti Sud

stalpul nr. 150 (tip SE8) al LEA 20 KV Pitesti Sud – Cateasca.

CEZ DISTRIBUTIE 1500000069

stalpul nr. 25 existent al LEA 20 kV Corabia - Studina. CEZ DISTRIBUTIE 1500000045

Statia 110/20 Kv Bals CEZ DISTRIBUTIE 1500000047

CEZ DISTRIBUTIE 1500000027

statia 110/20 kV Videle Celula 20 Kv in statia 110/20 Kv Videle CEZ DISTRIBUTIE 1500000097

CEZ DISTRIBUTIE 1500000068

Bornele 0.4 Kv ale trafo 1 si trafo 2 PTCZ Ferma Pui CEZ DISTRIBUTIE 1500000071

Celula 20 Kv in statia 110/20 Kv Coteana CEZ DISTRIBUTIE 1500000075

Celula 20 Kv in statia 110/20 Kv Coteana CEZ DISTRIBUTIE 1500000076

statia 110/20 kV Bals Celula din statia 110/20 Kv Bals CEZ DISTRIBUTIE 1500000070

110/20 kV Filiasi CEZ DISTRIBUTIE 1500000072

CEZ DISTRIBUTIE 1500000074

110/20 kV Gruia CEZ DISTRIBUTIE 1500000080

CEZ DISTRIBUTIE 1500000084

110/20 Kv Potelu stalpul nr. 66 tip SC 15007 al LEA 20 KV Potelu - Irigatii 2. CEZ DISTRIBUTIE 1500000054

Stalpul nr.110 al LEA 20 kV Iancu Jianu-Dragasani CEZ DISTRIBUTIE 7505

Stalpul nr.46 al LEA 20 Kv SPA 1 CEZ DISTRIBUTIE 1500000085

statia 110/20 Kv Scornicesti

stalpul nr. 7 tip SC 15014 aferent LEA 20 KV Scornicesti – Avicola Potcoava.

statia 110/20 Kv Corabia

stalpul nr. 50 tip SE1 al Racordului 20 KV PTA Bistrita Noua din LEA 20 KV Gradiste – SPP 13

Statia 110/20 Kv Bailesti

Stalpul nr.14 bis proiectat,SC15014,IN AXUL lea 20 Kv FNC 1

statia110/20 kV Draganesti Vlasca

Stalpul nr.19 al racordului 20 Kv PTA 2145 din LEA 20 Kv Stejaru

statia 110/20 kV Coteana

statia 110/20 kV Coteana

la 20 kV in celula de rezerva care va fi echipata in statia Filiasi

statia 110/20 kV Tg-Carbunesti

celula de linie parc fotovoltaic 2 20KV in statia 110/20 Kv Tg.Carbunesti

celula 20 KV proiectata in Statia de Transformare 110/20 KV Gruia.

Statia 110/20 kV Caracal Sud

celula 20 KV proiectata in Statia de Transformare 110/20 KV Caracal Sud.

Statia 110/20 kV Iancu Jianu

Statia 110/20 kV Cetate

Statia 110/20 kV Bals stalpul nr. 44 al LEA 20 KV Bals – Piatra Olt. CEZ DISTRIBUTIE 1500000089

Satia 110/20 kV Bals CEZ DISTRIBUTIE 1500000096

Statia 110/20 kV Bals CEZ DISTRIBUTIE 1500000095

CEZ DISTRIBUTIE 1500000094

Stalpul nr.67 al LEA 20 Kv Irigatii 2 CEZ DISTRIBUTIE 1500000067

CEZ DISTRIBUTIE 1500000090

CEZ DISTRIBUTIE 1500000091

Dej Sud Racord aerian din LEA 20 KV Dej Sud - Gherla FDEE - EDTN 60101225348

Gherla Racord aerian din LEA 20 KV Gherla - Bontida FDEE - EDTN 60101221381

Mihai Viteazu Racord aerian din LEA 20 KV Mihai Viteazu - Irigatii FDEE - EDTN 60101225348

Gherla Racord aerian din LEA 20 KV Gherla - Bontida FDEE-EDTN 60101221795

Dej FDEE-EDTN 60101224063

Gherla Racord aerian din LEA 20 KV Gherla - Manastirea FDEE-EDTN 60101224064

Dej Sud Racord aerian din LEA 20 KV Dej Sud - Gherla FDEE-EDTN 60101224980

PTZ Byron Bransament trifazat subteran FDEE-EDTN 60101223215

Baciu FDEE-EDTN 60101225346

Jucu Racord aerian din LEA 20 KV Jucu - Geaca FDEE-EDTN 60101223162

Mihai Viteazu FDEE-EDTN 60101221362

Mihai Viteazu Racord aerian din LEA 20 KV Mihai Viteazu - TV FDEE-EDTN 60101223202

Mihai Viteazu Racord aerian din LEA 20 KV Mihai Viteazu - TV FDEE-EDTN 60101223204

Oradea Centru Intercalare PTAB pe distribuitorul LES 20 KV PA Spital FDEE-EDTN 60201211420

Salonta FDEE-EDTN 60201213545

Voivozi Racord aerian din LEA 20 KV Voivozi - Derna FDEE-EDTN 60201212747

Voivozi Racord aerian din LEA 20 KV Voivozi - Marghita FDEE-EDTN 60201212746

celula 20 KV proiectata in Statia de Transformare 110/20 KV Bals

stalpul nr. 46A proiectat tip SC 15014 al LEA 20 KV Bals – Piatra Olt.

Statia 110/20 kV Mioveni Pitesti Nord

stalpul existent nr.12 tip SE 8 al Derivatiei 20 KV Irigatii Micesti.

Statia 220/110/20 kV Turnu Magurele

Statia 110 kV Craiova Nord

clemele de legatura ale conductoarelor LEA 110 kV Craiova Nord-CCh 4(circuitul 4 CN) la bornele izolatorilor de trecere

tip exterior-interior a SRA-ului 4.

Statia 110/20 kV Cujmir

Stalpul nr.144 A,tip 15014,proiectat intre stalpii nr.144 si nr.145 ai LEA 20 kV Cujmir-Vanju Mare;

Racord aerian din LEA 20 KV Dej - Beclean, derivatia Garboului

Racord aerian din LEA 20 KV Baciu - Fodora, semiaxa Fodora - Borsa

Racord aerian din LEA 20 KV Mihai Viteazu - Ocna Mures

Racord aerian din LEA 20 KV Salonta - Oradea Sud, derivatia CAP Gepiu

Salonta Racord aerian din LEA 20 KV Salonta - ANT FDEE-EDTN 60201214278

Suncuius Racord subteran LES 20 KV din statia Suncuius FDEE-EDTN 60201215011

Marghita Racord aerian din LEA 20 KV Marghita - Voivozi FDEE-EDTN 60201213388

Somcuta FDEE-EDTN 60301216331

Sighet 1 Racord aerian din LEA 20 KV Sighet 1 - Radio Vad FDEE-EDTN 60301217197

Somcuta Racord aerian din LEA 20 KV racord Energy Densit 1 FDEE-EDTN 60301219323

Abator Racord subteran LES 20 KV din statia Abator FDEE-EDTN 60401206550

Vetis Racord aerian din LEA 20 KV Vetis - Puturi Doba FDEE-EDTN 60401206470

Carpati FDEE-EDTN 60401206685

Abator Racord subteran din LEA 110 KV Abator- Turt FDEE-EDTN 60101223561

Tasnad Racord subteran LES 20 KV din statia Tasnad FDEE-EDTN 60401208152

Tasnad Racord aerian din LEA 20 KV Tasnad - CIG FDEE-EDTN 60401207696

Bransament trifazat subteran FDEE-EDTN 60401207961

Bransament trifazat subteran FDEE-EDTN 60401208225

Carpati FDEE-EDTN 60401208151

Viisoara FDEE-EDTN 60501205296

Beclean FDEE-EDTN 60501205638

Bistrita Racord aerian din LEA 20 KV Bistrita - Sieut FDEE-EDTN 60501205864

Bistrita FDEE-EDTN 60501205863

Unirea FDEE-EDTN 60501206963

Jibou Racord aerian din LEA 20 KV Jibou - Cehu Silvaniei FDEE-EDTN 60601207308

Jibou Racord aerian din LEA 20 KV Jibou - Cehu Silvaniei FDEE-EDTN 60601207310

FDEE - EDTS 70101115979

Racord aerian din LEA 20 KV Somcuta - Baia Mare 5, racord PTA 1 Remetea Chioar

Racord aerian din LEA 20 KV Carpati - Livada, derivatia Ciuperceni 2

PTab nr. 4449 Certeze III

PTA nr. 2216 Industrial Moftin

Racord aerian din LEA 20 KV Carpati - Livada, racord PT nr. 5020 SP Eteni

Racord subteran din LEA 110 KV Viisoara - CFR Sarata

Racord aerian din LEA 20 KV Beclean - Bistrita, racord UM Sintereag

Racord aerian din LEA 20 KV Bistrita - Prundu Bargaului 3, derivatia Cusma (Dealu Negru)

Racord aerian din LEA 110 KV Unirea - Prundu Bargaului

La distribuitorul LEA 20 kV, PT 8080 Avicola Stupini ¨C PCT 8034 Bravalis, intre SS 36 aferent LEA si PT 8018

Construirea unui punct de conexiuni (PC 20 kV) in anvelopa amplasat la utilizator la limita de proprietate cu domeniul public, cu exploatare din interior, cu echipamente de comutatie in SF6 pentru separatoare si in vid pentru intreruptoare. Racordarea PC proiectat se va realiza prin LES 20 kV tip A2XS(FL)2Y 3x150 mmp, intrare-iesire la distribuitorul LEA 20 kV PT 8080 Avicola Stupini ¨C PCT 8034 Bravalis, intre SS 36 aferent LEA si PT 8018. La celula tip PT + Masura din PC proiectat se va racorda prin LES 20 kV ca instalatie de utilizare un PT producator echipat cu trei unitati trafo ridicatoare 0,4/20 kV ¨C 630 kVA.

Ucea FDEE - EDTS 70101121943

FDEE - EDTS 70101223937

Echiparea unei celule de linie 110 kV in Statia Ucea, echipata cu: doua separatoare de bare in montaj in linie, din care unul cu CLP; intreruptor in SF6; trei transformatoare de curent; trei transformatoare de tensiune; separator de linie cu doua CLP-uri si releu digital de protectie-comanda-control. Instalatia de utilizare consta intr-o statie 110/20 kV 40 MVA racordata printr-un LES 110 kV in Statia Ucea. Pentru conversia energiei obtinuta de panourile fotovoltaice, producatorul va folosi 48 de invertoare de 1000 kW conectate cate unul in 48 de posturi de transformare 0,4/20 kV 1000 kVA. Posturile de transformare vor fi conectate intrare-iesire la 4 bucle pe partea de m.t. (6xPT/bucla) si se vor racorda in conexiunea 20 kV din statia de transformare prin intermediul a 8 circuite. Pentru calea de transmisie SCADA se va prevedea fibra optica ADSS care insoteste LES 110 kV.

La stalpul nr. 63 al LEA 20 kV Stupini - Feldioara

Pentru evacuarea energiei produse si alimentarea serviciilor proprii, parcul fotovoltaic Feldioara se va racorda la stalpul nr. 63 al LEA 20 kV Stupini-Feldioara, printr-o LEA 20 kV, in lungime de 30 m, si alcatuit din 3 stalpi TC15014 echipati astfel: stalpul nr. 1 cu reanclansator automat telecomandat, protectie digitala; stalpul nr. 2 cu celula aeriana de masura si analizor de calitate a energiei electrice ; stalpul nr. 3, pe care se va face trecerea LEA 20 kV in LES 20 kV, echipat cu set descarcatoare cu ZnO cu disconector si terminale de exterior pentru LES 20 kV. De la acest stalp, utilizatorul isi va realiza racordul in LES 20 kV pana la parcul fotovoltaic. Pe stalpul de racord nr. 63 al LEA 20 kV Stupini-Feldioara se va monta un separator vertical cu CLP. Precizare: la stalpul nr. 3 proiectat se va racorda prin LES 20 kV (L= 2 km) ca instalatie de utilizare doua PT-uri ( 0,4/20 kV - 2x400 kVA respectiv 0,4/20 kV - 2x630 kVA ) in anvelopa.

FDEE - EDTS 70101224707

FDEE - EDTS 70101225815

FDEE - EDTS 70101226200

Radial pe Distribuitorul LEA 20 kV Statia Stupini - Feldioara

Constr. unui punct de conexiuni (PC 20 kV) in anvelopa metal/beton amplasat pe terenul utilizat., la limita de proprietate cu acces direct din domeniul public, cu echipamente de comutatie in SF6 pentru separatoare si in vid pentru intreruptoare. Racordare PC proiectat se va realiza prin LES 20 kV tip A2XS(FL)2Y 3x150 mm - sistem radial pe distribuitorul L 20 kV Statia Stupini - Feldioara, cu executarea urmatoarelor lucrari : Plantare stalp nr. 47A (tip SC15015) proiectat in axul tronsonului LEA 20 kV SST102 FA - Statia Feldioara ; Stalpul nr. 47A se va echipa cu :separator tripolar de exterior cu montaj vertical tip STEPn 24 kV, cu 2 manete de actionare si CLP inclus ;descarcatoare ZnO ;capete terminale de exterior cu izolatie compozita pentru LES 20 kV ;priza de pamant cu Rp < 6,6 ohm; Montarea unui tronson nou LES 20 kV cu o lungime de aprox. 2,600 km, realizat cu cablu de tip A2XS(FL)2Y 3x1x150/25 mmp, intre stalpul nr. 47A (tip SC15015) pr. si PCT pr. La celula tip PT + Masura din PC pr. se va racorda prin LES 20 kV ca instal. de utiliz. un PT prod. echipat cu 2 unitati trafo ridic. 0,4/20 kV - 1250 kVA;

Radial pe Distribuitorul LEA 20 kV Statia Harman - PT 26 Harman

Construire PCT 20/0,40 kV in anvelopa beton / metal, amplasat pe terenul utilizatorului, la limita de proprietate cu acces direct din domeniul public, cu echipament de comutatie in SF6 pentru separatoare si in vid pentru intreruptoare. Racordare PC proiectat se va realiza in LES 20 kV- sistem radial pe distribuitorul L 20 kV Statia Harman - PT 26 Harman, cu executarea urmatoarelor lucrari :Plantare stalp nr. 30B (tip SC15015) proiectat in axul tronsonului LEA 20 kV SS121 - SST103 PR ; Stalpul nr. 30B (tip SC15015) proiectat se va echipa cu : separator tripolar de exterior cu montaj vertical tip STEPn 24 kV 400 A, cu 2 manete de actionare si CLP inclus ; descarcatoare ZnO; capete terminale de exterior ; priza de pamant cu Rp < 6,6 ohm; Montarea unui tronson nou LES 20 kV cu o lungime de aprox. 0,600 km, realizat cu cablu de tip A2XS(FL)2Y 3x1x150/25 mmp, intre stalpul nr. 30B (tip SC15015) proiectat si PCT proiectat. La celula tip PT + Masura din PC proiectat se va racorda prin LES 20 kV ca instalatie de utilizare trei PT-uri producator echipate fiecare cu cate o unitate trafo ridicatoare de 0,4/20 kV - 1250 kVA;

La Distribuitorul LEA 20 kV Statia Codlea - Porcine Codlea si la Distribuitorul LEA 20 kV Statia Codlea - Avicola Codlea

Construire PCT 20/0,40 kV in anvelopa beton / metal, cu bare 20 kV sectionate, amplasat pe terenul utilizatorului, la limita de proprietate cu acces direct din domeniul public, cu echipament de comutatie in SF6 pentru separatoare si in vid pentru intreruptoare. Racordare PC proiectat se va realiza in LES 20 kV cu inchidere bucla intre distribuitorul L 20 kV Statia Codlea - Porcine Codlea si distribuitorul L 20 kV Statia Codlea - Avicola Codlea. Precizare: la celulele tip PT + Masura din PC proiectat se va racorda prin LES 20 kV ca instalatie de utilizare cate un PT producator echipat cu un trafo ridicator 0,4/20 kV - 1250 kVA;

FDEE - EDTS 70101226611

FDEE - EDTS 70101226613

FDEE - EDTS 70101226615

FDEE - EDTS 70101226716

Conexiunea 20 kV Statia Harman si la distribuitorul LEA 20 kV Statia Zizin - Prejmer, stalpul 40A proiectat.

Construire PCT 20/0,40 kV in anvelopa beton / metal, cu bare 20 kV sectionate, amplasat pe terenul utilizatorului, la limita de proprietate cu acces direct din domeniul public, cu echipament de comutatie in SF6 pentru separatoare si in vid pentru intreruptoare, prevazut cu : Sectia 1 de bare (ordinea amplasarii celulelor 20 kV de la stanga la dreapta) ; Sectia 2 de bare (ordinea amplasarii celulelor 20 kV de la stanga la dreapta); Echiparea celulelor din PCT proiectat : celulele de linie pentru racordare la RED 20 kV, celulele de linie pentru realizare cupla 20 kV , celula de servicii interne , celulele tip PT+Masura (racorduri parc fotovoltaic) .Racordare PCT proiectat se va realiza in LES 20 kV - inchidere bucla intre Statia Harman si distribuitorul L 20 kV Statia Zizin - Prejmer.

Conexiunea 20 kV Statia Harman si la distribuitorul LEA 20 kV Statia Zizin - Prejmer, stalpul 40A proiectat.

Construire PCT 20/0,40 kV in anvelopa beton / metal, cu bare 20 kV sectionate, amplasat pe terenul utilizatorului, la limita de proprietate cu acces direct din domeniul public, cu echipament de comutatie in SF6 pentru separatoare si in vid pentru intreruptoare, prevazut cu : Sectia 1 de bare (ordinea amplasarii celulelor 20 kV de la stanga la dreapta) ; Sectia 2 de bare (ordinea amplasarii celulelor 20 kV de la stanga la dreapta); Echiparea celulelor din PCT proiectat : celulele de linie pentru racordare la RED 20 kV, celulele de linie pentru realizare cupla 20 kV , celula de servicii interne , celulele tip PT+Masura (racorduri parc fotovoltaic) .Racordare PCT proiectat se va realiza in LES 20 kV - inchidere bucla intre Statia Harman si distribuitorul L 20 kV Statia Zizin - Prejmer.

Conexiunea 20 kV Statia Harman si la distribuitorul LEA 20 kV Statia Zizin - Prejmer, stalpul 40A proiectat.

Construire PCT 20/0,40 kV in anvelopa beton / metal, cu bare 20 kV sectionate, amplasat pe terenul utilizatorului, la limita de proprietate cu acces direct din domeniul public, cu echipament de comutatie in SF6 pentru separatoare si in vid pentru intreruptoare, prevazut cu : Sectia 1 de bare (ordinea amplasarii celulelor 20 kV de la stanga la dreapta) ; Sectia 2 de bare (ordinea amplasarii celulelor 20 kV de la stanga la dreapta); Echiparea celulelor din PCT proiectat : celulele de linie pentru racordare la RED 20 kV, celulele de linie pentru realizare cupla 20 kV , celula de servicii interne , celulele tip PT+Masura (racorduri parc fotovoltaic) .Racordare PCT proiectat se va realiza in LES 20 kV - inchidere bucla intre Statia Harman si distribuitorul L 20 kV Statia Zizin - Prejmer.

Distribuitorul LES 20 kV existent intre PCT Logcenter si PCT Karpat Frigo, Statia 35 / 20 kV Feldioara, barele 20 kV Statia Bod si Statia 110 / 20 kV Stupini.

Construirea unui punct de conexiune si transformare PCT 20 / 0,4 kV - 40kVA in anvelopa din metal / beton, amplasat pe terenul utilizatorului, la limita de proprietate. Racordarea PCT proiectat la RED 20 kV se va realiza radial prin 2 x LES 20 kV intrare - iesire la distribuitorul LES 20 kV existent intre PCT Logcenter si PCT Karpat Frigo.

Tohan FDEE - EDTS 70101227703

FDEE - EDTS 70101227868

FDEE - EDTS 70101228171

Racordarea la RED a parcului fotovoltaic se va realiza in conexiunea 20 kV a Statiei 110/20/6 kV Tohan. Se va monta o celula de linie 20 kV in statia Tohan, identica cu cele existente, telecomandata, prefabricata, tip ABB. Precizare: In celula 20 kV proiectata in Statia Tohan se va racorda ca si instalatie de utilizare un PT utilizator prin intermediul unui LES 20 kV tip A2XS(FL)2Y 150 mmp, cu izolatie de polietilena reticulata (XLPE), cu ecran din Cu 25 mmp, cu protectie longitudinala si transversala impotriva patrunderii apei, cu manta exterioara din PE. Echipamentul electric aferent centralei fotovoltaice va realiza sincronizarea automata la conectarea acesteia, in paralel cu sistemul. Centrala va fi dotata cu automatizari care vor asigura deconectatarea automata de la retea in momentul cand se produc modificari ale parametrilor de intrare, ce afecteaza calitatea energiei livrate (tensiune, frecventa).

Radial prin LES 20 kV de la stalpul nr. 43 existent, al LEA 20 kV HARMAN - BOD, derivatia Podu Olt.

Construirea unui punct de conexiune (PC 20 kV) in anvelopa de metal / beton amplasat in incinta Centralei Fotovoltaice, la limita de proprietate, cu acces liber din strada, si cu exploatare din interior.Echipare PC 20 kV proiectat : 1 celula de linie sosire PT CFv ; 1 celula de linie de racord in LEA 20 kV HARMAN - BOD, derivatia Podu Olt; 1 celula de servicii interne; transformator servicii proprii 20/0,4 kV - 25 kVA; tablou servicii proprii (c.a.) TDRI 0,4 kV . Racordul PC 20 kV proiectat - se va face radial prin LES 20 kV (in lungime de 900 m), de la stalpul nr. 43 existent, al LEA 20 kV HARMAN - BOD, derivatia Podu Olt. Precizare: La celula de plecare PT producator, se vor racorda ca instalatie de utilizare prin LES 20 kV, doua posturi trafo ridicatoare PT 1 - 0,4/20 kV - 1600 kVA si PT 2 - 0,4/20 kV - 1600 kVA, proprietatea utilizatorului.

Staţia 20/110 kV Parau, Staţia 110/20 kV Fagaras, Staţia 110/20 kV Hoghiz

a) Realizare Statie 110/20 kV, in configuratie H extinsa pentru 3 Trafo pe partea de 110 kV: conexiunea 110 kV; conexiunea 20 kV; container destinat protectiilor-comenzilor-controlului si serviciilor proprii de curent continuu si curent alternativ; se vor utiliza echipamente digitale cu functii complexe (protectia-comnda-control) in vederea functionarii statiei fara personal, integrata in sistemul de teleconducere operativa SCADA al FDEE Electrica Distributie Transilvania Sud S.A.; automatizari la nivelul statiei: RATT, DASf, AAR 20 kV (cupla + trafo), AAR 0,4 kV si echipament de reglaj automat al bobinei de compensare; b) Racordarea statiei la RED 110 kV: se va realiza intrare-iesire in LEA 110 kV Hoghiz-Fagaras printr-un LES 110 kV d.c., c) Realizare LES 20 kV A2XS(FL)2Y 3x1x150/25 mmp de la Statia 20/110 kV Parau la PT utilizator 20/0,4 kV 100 kVA, pentru alim. principala a serv. proprii ale centralei.

Ucea FDEE - EDTS 70101229031

SDEE - BRASOV 70101231803

SDEE - SIBIU 70201118848

FDEE - EDTS 70201220488

Echiparea unei celule de linie 110 kV in Statia Ucea, echipata cu: doua separatoare de bare in montaj in linie, din care unul cu CLP; intreruptor in SF6; trei transformatoare de curent; trei transformatoare de tensiune; separator de linie cu doua CLP-uri si releu digital de protectie-comanda-control. Instalatia de utilizare consta intr-o statie 110/20 kV 40 MVA racordata printr-un LES 110 kV in Statia Ucea. Pentru conversia energiei obtinuta de panourile fotovoltaice, producatorul va folosi 48 de invertoare de 1000 kW conectate cate unul in 48 de posturi de transformare 0,4/20 kV 1000 kVA. Posturile de transformare vor fi conectate intrare-iesire la 4 bucle pe partea de m.t. (6xPT/bucla) si se vor racorda in conexiunea 20 kV din statia de transformare prin intermediul a 8 circuite. Pentru calea de transmisie SCADA se va prevedea fibra optica ADSS care insoteste LES 110 kV.

LEA 20 kV Statia Codlea - Avicola Codlea (stalpul 68) si LEA 20 kV Statia Codlea - Porcine Codlea (stalpul 83)

Construirea unui punct de conexiune si transformare PCT in anvelopa din metal / beton, amplasat pe terenul utilizatorului, la limita de proprietate. Racordarea PCT proiectat se va realiza prin LES 20 kVcu inchidere bucla intre distribuitorul LEA 20 kV Statia Codlea - Avicola Codlea si LEA 20 kV Statia Codlea - Porcine Codlea .

LEA 20 kV Ernea si LEA 20 kV PT 2 Avicola

Se va construi un Punct de Conexiuni (PC 20 kV ) in anvelopa de metal / beton, cu doua compartimente separate (un compartiment pentru SDEE: 4 celule de m.t. si trafo servicii interne si un compartiment pentru PRODUCATOR: 2 celule de linie m.t.), amplasat pe terenul privat al orasului DUMBRAVENI, la limita de proprietate. PC proiectat se va racorda prin 2x LES 20 kV intrare -iesire la LEA 20 kV ERNEA (stalpul nr. 33 existent - Circ. nr.1) si la LEA 20kV - PT 2 AVICOLA (stalpul nr. 34 existent).

LEA 110 kV Orlat-Petresti, între stâlpii nr. 133 si nr. 134

1) Realizarea unei statii de transformare 110/20 kV, cu bara simpla sectionata, pe teren amplasat in axul LEA 110 kV Orlat-Petresti pus la dispozitie de beneficiar, echipata cu: doua celule de linie 110 kV, una celula de cupla 110 kV , un transformator de putere 110/20 kV de 40 MVA, un transformator 1200/120 kVA pentru creere nul si servicii interne si o bobina de stingere 100 A, un sistem 20 kV cu bara simpla sectionata.2) Racordarea statiei se va face intrare-iesire la LEA 110 kV Orlat-Petresti.Instalatia de utilizare - consta in panouri fotovoltaice 245 W si invertoare. Energia produsa va fi colectata prin intermediul unor posturi de transformare 20/0,4 kV racordate in cele patru celule de linie din Statia 110/20 kV proiectata prin intermediul a doua bucle formate din 4 LES 20 kV.

FDEE - EDTS 70201220900

FDEE - EDTS 70201221617

FDEE - EDTS 70201221893

FDEE - EDTS 70201222011

Derivatia LEA 20kV - PT Paucea, stalpul nr. 57A;

Construirea unui punct de conexiune (PC 20 kV) in anvelopa de metal/beton,(amplasat pe teren ce apartine investitorului S.C. AS MANAGEMENT S.R.L.). Realizare LES 20 kV cu conductor tip A2XS(FL)2Y 3x150 mm2 (Ltraseu=200m), intre stalpul nr. 57A proiectat si PC proiectat (celula J04), in apropiera Centralei Fotovoltaice; La celula de racord J01 (CR1) din PC proiectat se va racorda prin LES 20 kV, cu conductor tip A2XS(FL)2Y 3x150 mm2 in lungime de aprox. 0,12 km, un PT 0,4/20 kV - 1250 kVA echipat cu un transformator de putere ridicator, ca instalatie de utilizare;

LEA 20 kV Copsa Mica - Blaj

Construirea unui punct de conexiune (PC 20 kV) proiectat, in anvelopa de metal / beton echipat cu: 2 celule de racord centrala fotovoltaica (J01 si J02) ; 1 celula de masura (J03) ; 1 celula trafo servicii interne (J04) ; 2 celule de linie 20 kV (J05 si J06).Comutatia secundara : DSIc.a. + c.c., cu redresor 230Vc.a. / 24 Vc.c. si o baterie de acumulatori 24V, 75Ah. In PC proiectat se va monta UCMT, iar PC va fi integrat in SAD - PA/PT al SC FDEE Electrica Distributie Transilvania SUD SA + integrare in sitemul de telegestiune al SDEE Sibiu Se va monta analizor de clasa A, pentru monitorizarea calitatii energiei electrice in punctul de delimitare; Racordul PC proiectat se va face in sistem intrare - iesire prin LES 20 kV, la stalpii proiectati 5A, 5B (plantati la o distanta de 5 m unul fata de celalalt), in axul LEA 20 kV Copsa Mica - Blaj. La celula de plecare PT producator, se vor racorda ca instalatie de utilizare prin LES 20 kV, doua posturi de transformare ridicatoare ( 2 x PT 0,4/20 kV - 1600 kVA ).

PT5 Racovita, Statia 110 / 20 kV Marsa

Racordarea centralei fotovoltaice la RED se va realiza prin derivatie 20 kV proiectata din PT5 Racovita , care presupune LES 20 kV proiectata din compartimentul MT pana la postul de transformare ridicator 0,4 kV/20 kV. Se impun lucrari de modernizare a postului de transformare.

LEA 20 kV Agnita - Hosman, Statia 110 / 20 kV Agnita

Construirea unui punct de conexiune (PC 20 kV) in anvelopa metal / beton, amplasat in incinta parcului fotovoltaic la limita de proprietate. Racordul 20 kV se va face la LEA 20 kV Agnita - Hosman. Construirea a doua LES 20 kV cu cablu nou 20 kV intre stalpii nr. 397 si 397A si celulele de linie din PC 20 kV proiectat.

FDEE - EDTS 70201222108

FDEE - EDTS 70201222891

FDEE - EDTS 70201224336

FDEE - EDTS 70201224445

Conexiunea 20 kV din Statia 110/20 kV Marsa

Racordarea la retea a producatorului se va realiza in conexiunea 20 kV din Statia 110/20 kV Marsa, prin realizarea urmatoarelor lucrari in regim de tarif de racordare: - Echiparea unei celule de rezerva 20 kV, existenta in Statia Marsa, cu separatoare, intreruptor cu mediul de stingere a arcului electric in vid, transformatoare de curent si tensiune, CLP spre linie, releu de protecie digital; - Datorita aparitiei acestui producator de energie si a lungimii racordului la statia electrica, se impune inlocuirea bobinei de stingere nr. 1 existenta, cu una noua, avand posibilitea de reglaj a acesteia. De asemenea se va monta un dulap de automatizare a acestei bobine de detectie si declansare a punerilor la pamant la liniile cu defect.

LEA 20 kV Agnita - Hosman, Statia 110 / 20 kV Agnita, Statia 110 / 20 kV Sibiu Nord si Sud

Construirea unui punct de conexiune (PC 20 kV) in anvelopa metal / beton amplasat in apropierea centralei fotovoltaice. Realizarea unui racord in LEA 20 kV cu cablu torsadat de m.t. de la stalpul existent nr. 400 al LEA 20 kV Agnita - Hosman, pana la stalpul nr. 1 proiectat si in LES 20 kV pana la PC 20 kV proiectat.

LEA 20 kV Statia Dumbraveni - Aurel Vlaicu

Racordarea la retea a parcului fotovoltaic se va realiza in LEA 20 kV Statia Dumbraveni - Aurel Vlaicu. Realizare stalp nr. 1 proiectat, intre stalpii nr. 194 si 195, in axul LEA 20 kV Dumbraveni - A.Vlaicu. Realizare stalp nr. 2 proiectat, pe derivatia 20 kV proiectata. Realizare stalp nr. 3 proiectat, pe derivatia 20 kV proiectata si se va racorda ca si instalatie de utilizare un PC 20 kV in anvelopa prin intermediul unui LES 20 kV.

LEA 20 kV Agnita - Bruiu, derivatia 20 kV proiectata - stalpul nr. 349 proiectat

Echiparea stalpului nr. 349 pr. in locul celui ex., in axul LEA 20 kV Agnita - Bruiu: stalp SC 15015; console CIT 140 - 2 buc ; LDI si izolatie tip compozit - 6 buc ; leg. de intindere in colt pt. conductor torsadat - 2 buc ; separator STEPnv 24 kV, 400A cu CLP ; priza de pamant (Rp max. 4 ohmi). Echiparea stalpului nr. 1, pe deriv. 20 kV : leg. de intindere in colt - 2 buc ; reanclansator 20 kV, care se va integra in SAD; releul de protectie cu functii: PMCR, PMCT, PMCD, PMC nedirectionata(2 trepte), PHCD, Umin/max, fmin/max, si conect. intreruptor numai la lipsa tensiune pe linie. Celula din instalatia de evacuare a consumatorului : conectare intreruptor numai in conditii de sincronism ; priza de pamant cu (Rp max. 4 ohmi); stalp SC 15014, in fundatie turnata. Echiparea stalpului nr. 2, pe derivatia 20 kV pr. : leg. de intindere in colt ; set de descarcatori cu ZnO, inclusi in cadrul separatorului STEPnv ; grup de masura 20 kV tip ext.; analizor clasa A, pentru monitoriz. calitatii en. el. in punctul de delimitare; priza de pamant (Rp max. 4 ohmi); stalp SC 15014.

FDEE - EDTS 70201226255

FDEE - EDTS 70301118699

FDEE - EDTS 70301219782

Livezeni FDEE - EDTS 70301220781

LEA 20 kV Copsa Mica, PT 14

Construirea unui punct de conexiune (PC 20 kV) in anvelopa metal / beton, amplasat la utilizator, la limita de proprietate. Racordarea PC 20 kV proiectat in bucla (intrare - iesire) prin LES 20 kV tip A2XS(FL)2Y 1x150mmp - 480 m), la LEA 20 kV Copsa Mica - PT 14la stalpii nr. 116A si 116B proiectati in axul LEA 20 kV existente.

LEA 20 kV AVICOLA 1 la stalpul nr. 1A pr., respectiv LEA 20 kV AVICOLA 2 la stalpul nr. 1A pr.

Construirea unui punct de conexiune (PC 20 kV) in anvelopa de metal / beton amplasat in incinta Parcului Fotovoltaic, dimensionat pentru exploatare din interior. Echipare PC 20 kV : 2 celule de linie; 1 celula de masura ; 1 celula servicii interne cu transformator 20/0,23 kV - 4 kVA; 1 celula de linie, plecare spre utilizator ; Celulele vor fi cu motorizare la 24 Vc.c.; DSIc.c. echipat cu redresor automat 230Vc.a./24Vc.c. si baterie de acumulatori 24 Vc.c.; Anvelopa va avea spatiu de rezerva pentru 1 celula cu intreruptor; Racordul PC proiectat se va face prin LES 20 kV, in sistem intrare-iesire, la stalpul nr. 1A proiectat, din LEA 20 kV - AVICOLA 1, respectiv la stalpul nr. 1A proiectat, din LEA 20 kV - AVICOLA 2. Precizare: La celula de plecare PT producator, se va racorda ca instalatie de utilizare prin LES 20 kV, un post trafo PT 20/0,4 kV - 3 x 1250 kVA + 100 kVA.

LEA 20 kV Fantanele-Sovata, derivatia Ghindari-Bira, si in LES 20 kV prin sistem intrare-iesire, la stalpii nr. 6A si 6B proiectati

Realizarea unui racord in LEA 20kV FANTANELE - SOVATA, derivatia GHINDARI - BIRA, prin LES 20kV, in sistem intrare-iesire, la stalpii nr. 6A si 6B proiectati, pana la PCT proiectat.Construirea unui punct de conexiune si transformare (PCT 20 kV)in anvelopa de metal / beton amplasat in incinta SC CAPIDAVA PRODCOM SRL, la limita de proprietate, cu acces liber din strada, dimensionat pentru exploatare din interior, echipat cu celule 24 kV modulare, cu mediu de izolatie a barelor in aer, cu echipament de comutatie in SF6 pentru separatoare, respectiv in vid pentru intreruptor. La celula de plecare spre producator din PCT proiectat, se va racorda ca instalatie de utilizare prin LES 20 kV,un post trafo PT 20/0,4 kV - 2 x 1250 kVA, proprietatea utilizatorului; La BMPT adiacent PCT 20 kV proiectat urmeaza a se racorda, ca instalatie de utilizare, printr-un cablu 1 kV, un TD 0,4 kV, proprietatea utilizatorului.

Realizare Punct de Conexiune (PC) 20 kV in anvelopa din metal / beton, cu exploatare din interior, amplasat in incinta utilizatorului la limita de proprietate. Racordul se va face prin LES 20 kV in bucla, in Statia 110/20 kV Livezeni si in PT 499.

Tarnaveni FDEE - EDTS 70301221138

FDEE - EDTS 70301225267

In statia Tarnaveni, celula 110 kV retrasa definitiv din exploatare (fosta Carbid 6) se va echipa cu: un set de descarcatoare; trei transformatoare de tensiune; separator de linie cu 2 CLP-uri; separator de bara de transfer; intreruptor cu mediu de stingere a arcului electric in SF6; trei transformatoare de curent; doua separatore de bara cu 1CLP; Pe partea de circuite secundare se vor inlocui cutia de cleme si cablurile de comanda control cu altele noi si se va monta protectie diferntiala longitudinala; Instalatia de utilizare este formata dintr-o statie 110/20 kV 1x63 MVA si LES 110 kV de racord in Statia 110/20 kV Tarnaveni. Parcul fotovoltaic va fi compus din 6 grupuri de productie. Pentru conversia energiei obtinuta de panourile fotovoltaice se vor folosi invertoare cc/ca de cca 250-500 kW care vor alimenta panourile de j.t. ale unor posturi de transformare 0,4/20 kV 1000 kVA. Posturile de transformare vor fi racordate la barele de 20 kV ale Statiei 110/20 kV 1x63 MVA apartinand producatorului;

LEA 20 kV Livezeni - Fintinele, derivatia PC 12 Acatari ( ROMCAB ) si LEA 20 kV Ungheni - Miercurea Niraj

Punct de conexiune (PC) 20 kV in anvelopa cu exploatare din interior, amplasat in incinta utilizatorului la limita de proprietate, cu acces liber din strada, echipat cu celule modulare dispuse pe 2 sectii de bara astfel : 2 celule de linie; 2 celule trafo; 2 celule de masura;1 celula sevicii interne; 1 celula de cupla ( 2 module ); AAR intre cele 2 celule de linie; Celulele vor fi prevazute cu protectii digitale, vor fi telecomandate, integrate in SAD PA-PT ( motorizare 24Vc.c., indicatoare de prezenta tensiune cu contacte auxiliare, dulap servicii interne, echipat cu redresor automat 230 Vca/24 Vcc si baterie de acumulatori 24 Vcc, dulap UCMT ).Protectii minime in celulele plecare spre producator : PMCR, PMCT in 2 trepte; PMCD; PHCD; Umin/max; fmin/max si conectare intrerupator numai la lipsa tensiune pe linie. Racord 20 kV din LEA 20 kV Livezeni - Fininele, derivatia PC 12 Acatari ( ROMCAB ), stilpul nr. 29, in lungime de cca. 3 km. Racord 20 kV la LEA 20 kV Ungheni - Miercurea Niraj, in lungime de cca. 1,5 km, cu traseu pe strazile din localitatea Stejaris .

FDEE - EDTS 70301225458

FDEE - EDTS 70401217780

FDEE - EDTS 70501109889

LEA 20 kV Ludus - Sarmas, stalpul nr. 330A

Racord 20 kV in lungime de cca. 25 m, din LEA 20 kV Ludus - Sarmas, realizat pe stilpi de beton tip SC, cu montarea unui separator tripolar de exterior cu clp pe primul stilp al racordului, a unui reanclansator automat telecomandat cu protectii, integrat in SAD, pe cel de-al doilea stilp, respectiv a unui grup de masura 20 kV, echipat cu 3 TT si 3 TC, pe ultimul stilp. Racordul se va realiza de la stilpul nr.330A, stilp special proiectat, intercalat in axul liniei. Se va monta analizor clasa A pentru monitorizarea calitatii energiei electrice in punctul de delimitare. Releul de protectie incorporat in in dulapul de comada al reanclansatorului va avea minim urmatoarele functii de protectie : PMCR, PMCT in 2 trepte PMCD ; PHCD, Umin/max, fmin/max si conectare intrerupator numai la lipsa tensiune pe linie. Precizare : La stilpul cu grupul de masura se va racorda prin LES 20 kV un PT - 20/0,4kV - 1000kVA, ca instalatie de utilizare, prin grija producatorului. Functia de control sincronism se va realiza la producator.

Conexiunea 20 kV din Statia 110/20/6 kV Blaj

Centrala Solara se va racorda in Statia 110/20/6 kV Blaj. Montarea unei celule de 20 kV in Statia 110/20/6 kV Blaj, intr-o carcasa de celula identica cu cele existente.Celula de 20 kV noua se va racorda la conexiunea 20 kV prin prelungirea barelor de 20 kV existente si prin izolatori de trecere la barele de 20 kV. Ca instalatie de utilizare, la celula 20 kV proiectata in Statia Blaj se va racorda un PT utilizator (2x1600 kVA), in anvelopa de beton, prin intermediul unui LES 20 kV.

LEA 110 kV Miercurea Ciuc-Tusnad

Realizarea unei statii de conexiuni 110 kV amplasata langa stalpul nr. 108 al LEA 110 kV Miercurea Ciuc-Tusnad, aflat langa DN 12, avand sistem simplu de bare colectoare nesectionat, echipata cu trei celule de linie realizate cu echipamente clasice. Statia de conexiuni proiectata se va racorda intrare-iesire in LEA 110 kV Miercurea Ciuc-Tusnad. Instalatia de utilizare este formata din Statia 110/20 kV FOTO 1x40 MVA si LES 110 kV de racord in statia de conexiuni 110 kV proiectata. Parcul fotovoltaic va fi compus din 6 grupuri de productie. Pentru conversia energiei obtinuta de panourile fotovoltaice se vor folosi invertoare cc/ca de cca 10-15 kW care vor alimenta panourile de j.t. ale unor posturi de transformare 0,4/20 kV. Posturile de transformare vor fi racordate la barele de 20 kV ale Statiei 110/20 kV FOTO.

FDEE - EDTS 70501110029

FDEE - EDTS 70501212739

Stalpii nr. 37 si 38 din LEA 110 kV Gheorgheni - Toplita

Realiz. unei statii de conexiuni 110 kV cu echipam. clasice, sistem simplu de bare colectoare simplu sectionat; Statia de conex. 110 kV pr. se va integra in SCADA FDEE Transilvania Sud. Racordarea la RED a statiei de conexiuni 110 kV pr. se va realiza intrare-iesire in LEA 110 kV Gheorgheni-Toplita prin montarea in axul LEA, intre stalpii nr. 37 si 38, a unui stalp special din otel zincat bulonat, tip Itn-Tr, in fundatie cvadribloc. Conductoarele existente se remonteaza cu lanturi de izolatoare duble compozite, iar conductorul de protectie se leaga la priza statiei prin doua conductoare 240/40 mmp ALOl, legate intre varful stalpului si cadrele metalice ale statiei. La stalpul pr. se va prevedea priza de pamant; Alim. principala a SI ale statiei de conexiuni 110 kV se va asigura printr-un Trafo 20/0,4 kV 100 kVA. Alim. de rezerva se va asigura din TSICN din statia de transf. 110/20 kV apartinand producatorului. Instalatia de utilizare este formata din statie 110/20 kV 2x31,5 MVA si 2xLES 110 kV de racord in statia de conexiuni 110 kV pr.

LEA 20 kV Sighisoara, la stalpul nr.66A proiectat ;

Construirea unui (PC 20 kV) in anvelopa din metal / beton, amplasat pe terenul Parcului Fotovoltaic, la limita de proprietate, cu exploatare din interior. Echipare PC 20 kV proiectat : 1 celula de linie sosire PT CFv (cu masura 20 kV inglobata), (releul de protectie va asigura minim urmatoarele functii de protectie): PMCR/D,PMCT/D,PMCT/N,PHCD,Umin/max, fmin/max, si conectare intreruptor numai la lipsa tensiune pe linie (spre producator); 1 celula de linie de racord la LEA 20 kV Sighisoara, 1 celula de servicii interne ; transformator servicii interne 20/0,4 kV - 25 kVA ; tablou servicii proprii c.a. 0,4 kV ; (DSI c.c.) echipat cu redresor automat 230Vc.a./24Vc.c., 16A si baterie de acumulatori 24 Vc.c., 100Ah ; UCMT pentru integrarea PC 20 kV in SAD - PA/PT ; analizor de calitate a energiei electrice clasa A ; Racordul PC 20 kV proiectat se va face radial din LEA 20 kV Sighisoara, de la stalpul nr. 66A proiectat.Precizare: La celula de plecare PT producator, se va racorda ca instalatie de utilizare prin LES 20 kV, patru posturi trafo (3 x PT 0,4/20 kV - 1000 kVA si 1 x PT 0,4/20 kV - 1250 kVA).

FDEE - EDTS 70501212740

70601209731

FDEE - EDTS 70601210945

Filipesti racord in LEA 20kV Milcov-Bijghir 1000285987

Milcov racord in LEA 20kV Milcov-Bijghir 1000285936

FAI racord in LEA 20kV FAI-Ursoaia 1000203807

LEA 20 kV Avicola, la stalpul nr. 57A proiectat ;

Construirea unui (PC 20 kV) in anvelopa din metal / beton, amplasat pe terenul Parcului Fotovoltaic, la limita de proprietate, cu exploatare din interior. Echipare PC 20 kV proiectat : 1 celula de linie sosire PT CFv (cu masura 20 kV inglobata), (releul de protectie va asigura minim urmatoarele functii de protectie): PMCR/D,PMCT/D,PMCT/N,PHCD,Umin/max, fmin/max, si conectare intreruptor numai la lipsa tensiune pe linie (spre producator); 1 celula de linie de racord la LEA 20 kV Avicola, 1 celula de servicii interne ; transformator servicii interne 20/0,4 kV - 25 kVA ; tablou servicii proprii c.a. 0,4 kV ; (DSI c.c.) echipat cu redresor automat 230Vc.a./24Vc.c., 16A si baterie de acumulatori 24 Vc.c., 100Ah ; UCMT pentru integrarea PC 20 kV in SAD - PA/PT ; analizor de calitate a energiei electrice clasa A ; Racordul PC 20 kV proiectat se va face radial din LEA 20 kV Avicola, de la stalpul nr. 57A proiectat.Precizare: La celula de plecare PT producator, se va racorda ca instalatie de utilizare prin LES 20 kV, patru posturi trafo (4 x PT 0,4/20 kV - 1000 kVA).

LEA 20kV Statia 110/20KV Campu Frumos-Irigatii, stalpul 61A

Montarea unui stalp LEA MT de tip SC 15014 in axul LEA 20kV Statia 110/20KV Campu Frumos-Irigatii pe pozitia 61A, pe marginea drumului de acces la CES si echiparea stalpului cu un separator de sarcina MT vertical cu CLP. Montarea celui de al doilea stalp (nr.1) SC 15014 la 10 m de la stalpul cu separator proiectat spre CES, pe marginea drumului de camp si echiparea acestuia cu un reanclansator de 20kV, masura la 20kV si protectie digitala, montare conductor OL-AL 50/8mmp. pe deschiderea de 10m. Reanclansatorul va fi echipat cu UCMT, necesara pentru integrarea in SAD, asigurand si transmiterea online a informatiilor minime:P,Q,U,f. si pozitie intrerupator . Se va prevedea in punctul de delimitare analizor de calitate a energiei electrice.Precizare : la stilpul cu grupul de masura , se va racorda prin LES 20 kV, ca instalatie de utilizare un PT producator .Releul numeric va fi prevazut cu functii de protectie, cu codurile ANSI aferente. Pentru celula din instalatia de evacuare a consumatorului : - conectare intrerupator numai in conditii de sincronism .

LEA 20 kV Valcele, Statia 110 / 20 kV Valea Crisului, si Statia 110 / 20 kV Sf. Gheorghe

Se va realiza un racord prin LEA 20 kV din LEA 20 kV Valcele cu montarea a trei stalpi, primul se va echipa cu un separator tripolar STEPno, al doilea cu reanclansator automat (recloser) si al treilea cu grup de masura pe 20 kV in montaj pe stalp, dupa care se continua in LEA 20 kV pana la PT producator.

E.ON Moldova Distributie

E.ON Moldova Distributie

E.ON Moldova Distributie

Filipesti1000228387

Tg.Frumos 1000286307

Tg.Neamt1000293346

Sannicolau Mare 1057

Deta 1083

Padurea Verde 1085

Padurea Verde 1123

Padurea Verde 1126

racord in LEA 20kV Filipesti-Irigatii Damienesti

EON Moldova Distributie

racord 20kV in LEA 20kV Targu Frumos - Hodora

EON Moldova Distributie

racord in LEA 20kV Tg. Neamt-Pluton, derivatia Nemtisor – Manastirea Neamt

EON Moldova Distributie

punct de conexiune 20 kV cu acţionare din interior, cu două compartimente (de racordare şi utilizator) racordat în antenă la staţia 110/20 kV Sânnicolau Mare şi amplasat în exteriorul staţiei (la limita de proprietate)

Enel Distributie Banat

LEA 20 kV cu conductoare 95/15 mmp Al-Ol, în lungime de cca. 5 m, de la stalpul nr.46 al LEA 20 kV existente şi cu echiparea stâlpului special proiectat cu separator 24 kV, set descărcătoare cu ZnO cu disconector, terminale de exterior pentru LES 20 kV si Rp< 4 ohmi. - LES 20 kV în lungime de cca. 100 m cu cablu de Al cu izolaţie din polietilenă reticulată (XLPE) de grosime redusă, 3x185 mmp, montat în tub din polietilenă;- Echiparea compartimentului de racordare al punctului de conexiune, astfel:* 1 buc. celula modulara de linie de 24kV, 400A, 12,5 kA(1s), cu separator de sarcină în SF6 şi CLP, cu motorizare, loc pentru înca o celula de linie;* 1 buc. celulă de măsură cu separator de sarcină, cu două transformatoare de tensiune 20/0,1 kV, clasa de precizie 0,5 şi trei transformatoare de curent de 200/5A, clasa de precizie 0,5- Grupul de masurare de decontare.

Enel Distributie Banat

punct de conexiune de 20 kV, cu două compartimente (de racordare şi utilizator) racordat la LES 20 kV Remetea între PT 12353 si PT 12347, din staţia 110/20 kV Padurea Verde

Enel Distributie Banat

punct de conexiune de 20 kV, cu două compartimente (de racordare şi utilizator) racordat la LEA 20 kV Avicola Giarmata stalp 275, din staţia 110/20 kV Padurea Verde

Enel Distributie Banat

constă într-un punct de conexiune de 20 kV cu acţionare din interior, cu două compartimente (de racordare şi utilizator) racordat la LEA 20 kV Ghiroda din staţia 110/20 Padurea Verde

Enel Distributie Banat

Fratelia 1163

Sebis 1164

Sebis 1165

Gataia 1162

Fantanele 1194

Otelu Rosu 11614559

Satchinez 1260

Faget 1257

Carpinis 1264

constă într-un punct de conexiune de 20 kV cu acţionare din interior, cu două compartimente (de racordare şi utilizator) racordat la LEA 20 kV Urseni din staţia 110/20/10 kV Fratelia

Enel Distributie Banat

LES 20kV intre punctul de conexiune proiectat si celula libera existenta de 20 kV a st. 110/20 kV Sebis in lungime de cca. 50 m. Punctul de conexiune va avea doua compartimente, unul de racordare si un compartiment al utilizatorului.

Enel Distributie Banat

LES 20kV intre punctul de conexiune proiectat si celula libera existenta de 20 kV a st. 110/20 kV Sebis in lungime de cca. 50 m. Punctul de conexiune va avea doua compartimente, unul de racordare si un compartiment al utilizatorului.

Enel Distributie Banat

punct de conexiune de 20 kV cu acţionare din interior, cu două compartimente (de racordare şi utilizator) racordat la LEA 20 kV Tormac din staţia 110/20 Gataia

Enel Distributie Banat

punct de conexiune de 20 kV cu acţionare din interior, cu două compartimente (de racordare şi utilizator) racordat la LEA 20 kV Alunis din staţia 110/20 Fantanele

Enel Distributie Banat

punct de conexiune de 20kV cu doua compartimente: un compartiment de racordare, pentru instalatiile din gestiunea operatorului de distributie (2 celule de linie , o celula de masura) si un compartiment pentru instalatiile electrice ale producatorului, racordat in LEA 20kV Iaz - Muntele Mic intre stalpii 89 si 90.

Enel Distributie Banat

punct de conexiune de 20kV racordat la LEA 20kV Carpinis Petrol , din statia 110/20 kV Satchinez

Enel Distributie Banat

punct de conexiune 20 kVcu doua compartimente , racord scurt LEA 20 kV in lungime de cca.65 m si LES 20 kV in lungime traseu de cca.20 m de la stalpul nr.213 al LEA 20kV Manastur

Enel Distributie Banat

Punct de conexiune de 20 kV racordat la LEA 20 kV Beregsau II din staţia 110/20 kV Carpinis.

Enel Distributie Banat

Carpinis 1246

Lovrin 1247

Lovrin 1259

Bocsa 1275

Semlac 1285

Faget 1310

Punct de conexiune 20 kV la LEA 20 kV Pompe Cenei, stalp 331/3 , LES 20kV intre punctul de conexiune si statia colectoare a parcului fotovoltaic de cca. 200 m

Enel Distributie Banat

Punct de conexiune la 20 kV cu doua compartimente, unul pentru inst.el. din gestiunea EDB si unul pentru inst.el. ale producatorului, post trafo 20/0,4 kV in functie de puterea obiectivului, LES 20kV intre punctul de conexiune si statia colectoare a parcului fotovoltaic de cca. 300m .

Enel Distributie Banat

Punct de conexiune de 20 kV cu doua compartimente (de racordare si utilizator) racordat la LEA 20 kV Peciu Nou din statia 110/20 kV Lovrin.

Enel Distributie Banat

LEA 20 kV cu conductoare 50/8 mmp Al-Ol, în lungime de cca. 6 m, de la stalpul nr 55/26/9 al LEA 20kV FNC, echiparea stalpului special proiectat SC 15014 cu separator 24 kV, set descărcătoare cu ZnO cu disconector, terminale de exterior pentru LES 20 kV si Rp< 4ohmi. - LES 20 kV în lungime de cca. 10 m;- Echiparea compartimentului de racordare al punctului de conexiune, astfel:* 1 buc. celulă modulară de linie de 24kV, 400A, 12,5 kA(1s), cu separator de sarcină în SF6 şi CLP, cu motorizare, loc pentru inca o celula de linie;* 1 buc. celulă de măsură - Grupul de masurare de decontare .

Enel Distributie Banat

punct de conexiune de 20 kVcu acţionare din interior, cu două compartimente (de racordare si utilizator) racordat în LEA 20 kV Semlac-Nădlac (în derivaţia din ax spre PT 2160 – Nădlac Peco) în dreptul st. 210/9

Enel Distributie Banat

Punct de conexiune de 20 kV cu doua compartimente (de racordare si utilizator) racordat in LEA 20 kV Faget , între stalpii nr. 104 şi 105.

Enel Distributie Banat

Faget 1311

Calan 1197

Lovrin 1328

Lovrin 1322

Lugoj 1319

Punct de conexiune de 20 kV cu doua compartimente (de racordare si utilizator) racordat in LEA 20 kV Faget , între stalpii nr. 129 şi 130.

Enel Distributie Banat

Punct de conexiune de 20 kV cu acţionare din interior, cu două compartimente (de racordare şi utilizator) racordat prin LES 20 kV si celula de linie 20kV la barele de medie tensiune ale statia 110/20kV Calan

Enel Distributie Banat

Punct de conexiune de 20kV cu actionare din interior, cu doua compartimente (de racordare si utilizator) racordat la barele de MT din statia 110/20 kV Lovrin .

Enel Distributie Banat

Punct de conexiune de 20kV cu actionare din interior, cu doua compartimente (de racordare si utilizator) racordat la barele de MT din statia 110/20 kV Lovrin .

Enel Distributie Banat

montare 1 buc. celulă de linie prefabricată, 24 kV, extensibilă, în anvelopă metalică, cu ţinere la arc intern şi separator de sarcină cu SF6 şi CLP in

compartimentul de racordare al PC proiectat pentru PFVSN2;

- LES 20 kV traseu în lungime de cca. 100 m cu cablu de Al cu izolaţie din polietilenă reticulară (XLPE) de

grosime redusă, 3x185 mmp, montat în tub de polietilenă intre PC proiectat pentru PFVSN2 si PC

proiectat pentru PFVSN1;- Echiparea punctului de conexiune proiectat pentru

PFVSN1, astfel: * 1 buc. celulă de linie prefabricată, 24 kV,

extensibilă, în anvelopă metalică, cu ţinere la arc intern şi separator de sarcină cu SF6 şi CLP;

* 1 buc. celulă de măsura prefabricată, 24 kV, în anvelopă metalică, cu ţinere la arc intern şi separator de sarcină în SF6 şi CLP, cu două transformatoare de tensiune 20/0,1 kV şi trei transformatoare de curent de

100/5 A, clasa de precizie 0,5. * grup de măsurare de decontare;

- montare pe stâlpul de reţea JT existent în imediata apropiere a PFVSN2 a unui BMP trifazat 16 A, cablu 3x25+16 mmp în lungime de 6 m., contor electronic

trifazat Imax = (5 – 80) A;

Enel Distributie Banat

Lugoj 1320

Sebis 25

Satchinez 1295

LEA 20 kV cu conductoare 50/8 mmp Ol-Al, în lungime de cca. 10 m de la stâlpul nr 26/147/74/19 al LEA 20 kV Dezeşti, cu echiparea stâlpului de racord

proiectat cu separator 24 kV, set descărcătoare cu ZnO cu disconector, terminale de exterior pentru LES 20

kV şi Rp < 4 ohmi, consolă întindere CITI 140, legături de întindere cu izolaţie compozit;

- LES 20 kV traseu în lungime de cca. 100 m cu cablu de Al cu izolaţie din polietilenă reticulară (XLPE) de

grosime redusă, 3x185 mmp, montat în tub de polietilenă;

- Echiparea punctului de conexiune proiectat, astfel: * 1 buc. celulă de linie prefabricată, 24 kV,

extensibilă, în anvelopă metalică, cu ţinere la arc intern şi separator de sarcină cu SF6 şi CLP;

* 1 buc. celulă de măsura prefabricată, 24 kV, în anvelopă metalică, cu ţinere la arc intern şi separator de sarcină în SF6 şi CLP, cu două transformatoare de tensiune 20/0,1 kV şi trei transformatoare de curent de

100/5 A, clasa de precizie 0,5. * grup de măsurare de decontare;

- montare pe stâlpul de reţea JT existent în imediata apropiere a PFVSN2 a unui BMP trifazat 16 A, cablu 3x25+16 mmp în lungime de 6 m., contor electronic

trifazat Imax = (5 – 80) A;- procurare şi montare protecţie maximală de curent

direcţională pe plecarea 20 kV LEA din staţia 110/20 kV Lugoj.

Enel Distributie Banat

*extinderea barei colectoare 110 kV in statia Sebis;*montarea unei celule noi 110 kV in extinderea statiei

Sebis aferenta CFV Sebis echipata complet cu intrerupator (cu comanda uni-tripolara si RAR monofazat) si protectii, lucrari anexe aferente;

*echipare celula cu intrerupator in statia 110/20 kV Sebis aferenta LEA 110 kV plecare spre Varfuri,

inclusiv protectii specifice LEA 110 kV;*integrarea celulelor 110 kV noi in sistemul de telecontrol existent la Enel Distributie Banat;

*contor masura energie produsa, montat in instalatia Utilizatorului;

*completare instalatie de legare la pamant.

Enel Distributie Banat

Punct de conexiune de 20kV cu actionare din interior, cu doua compartimente (de racordare si utilizator) racordat la LEA 20 kV Carpinis Petrol,

din statia 110/20 kV Satchinez .

Enel Distributie Banat

Jimbolia 1321

I. Lucrări pe tarif de racordare, conform HG 90/2008:

- Demontarea LEA 20 kV Comlos intre stalpii nr 33 si 34.

- Reîntregire circuit LEA 20 kV cu conductoare 120/21 mmp Ol-Al, în lungime de cca. 65 m între

stâlpul nr. 33 al LEA 20 kV Comlos şi stâlpul proiectat nr.1, şi între stâlpul proiectat nr.2 şi

stâlpul nr.34 al LEA 20 kV Comlos si echiparea stâlpilor proiectaţi cu separator 24 kV, set

descărcătoare cu ZnO cu disconector, consola de intindere CIT 1400, legaturi duble de

intindere, izolatie compozit, terminale de exterior pentru LES 20 kV şi Rp < 4 ohmi.

- LES 20 kV în lungime de cca. 2x15 m cu cablu de Al cu izolaţie din polietilenă reticulară (XLPE) de grosmine redusă, 3x185 mmp, montat în tub

de polietilenă, in canalizare separata.- Echiparea punctului de conexiune proiectat,

astfel:* 2 buc. celule de linie (fără mentenanţă)

extensibile, cu echipament de comutaţie în SF6, echipate cu separator de sarcină şi CLP,

indicator de sc şi de defect la pământ şi indicator capacitiv de prezenţă a tensiunii, motorizată,

alimentarea motorizării 24 Vcc;* 1 buc. celulă de măsura echipată cu separator de sarcină şi CLP, cu două transformatoare de tensiune 20/0,1 kV şi trei transformatoare de

curent de 100/5A, clasa de precizie 0,5.- Grup de masurare de decontare, contor dublu

sens.- Montare protecţie maximală de curent

direcţională in celula de 20 kV plecare LEA 20 kV Comlos din staţia 110/20 kV Jimbolia.

Enel Distributie Banat

Obs. Legislatia Stare ATR

ATR prelungit

90/2008 17.11.2012 VALABIL

ATR prelungit

90/2008 18.11.2012 VALABIL

13.08.2012 90/2008 13.11.2012 VALABIL

Data Emiterii/ Prelungirii

Data expirarii ATR

17.05.2012/03.08.2012

18.05.2012/16.08.2012

06.08.2012 90/2008 06.11.2012 VALABIL

ATR prelungit

90/2008 11/29/2012 VALABIL

ATR prelungit

90/2008 11/25/2012 VALABIL

10/3/2012 90/2008 1/3/2013 VALABIL

9/25/2012 90/2008 12/25/2012 VALABIL

10/2/2012 90/2008 4/2/2013 VALABIL

29.05.2012/07.08.2012

25.05.2012/06.08.2012

10/2/2012 90/2008 4/2/2013 VALABIL

9/26/2012 90/2008 12/26/2012 VALABIL

01.06.2012 ATR nou 90/2008 01.09.2012 Valabil

01.06.2012 ATR nou 90/2008 01.09.2012 Valabil

25.05.2012 ATR nou 90/2008 25.08.2012 Valabil

13.07.2012 ATR nou 90/2008 13.01.2013 VALABIL

12.07.2012 ATR nou 90/2008 12.01.2013 VALABIL

15.10.2012 ATR nou 90/2008 15.04.2012 Valabil

25.04.2012 90/2008 07.11.2012 Valabil

ATR prelungit 90/2008 05.07.2012 VALABIL

03.04.2012 90/2008 03.07.2012 VALABIL

Prelungire ATR 108/07.11.2011

05.01.2012/05.04.2012

03.04.2013 90/2008 03.07.2012 VALABIL

19.04.2012 90/2008 19.10.2012 VALABIL

23.04.2012 90/2008 23.10.2012 VALABIL

ATR prelungit 90/2008 12/1/2012 VALABIL

ATR prelungit 90/2008 11/18/2012 VALABIL

ATR prelungit 90/2008 11/18/2012 VALABIL

ATR prelungit 90/2008 11/30/2012 VALABIL

27.08.2012 90/2008 11/27/2012 VALABIL

01.06.2012/30.08.2012

18.05.2012/02.08.2012

18.05.2012/02.08.2012

20.06.2012/16.08.2012

K39
r102102:
K40
r102102:
K41
r102102: data emiterii ATR in tabelul de producatori este 31.05.2012

11.09.2012 90/2008 3/11/2013 VALABIL

11.09.2012 90/2008 12/11/2012 VALABIL

10.09.2012 90/2008 12/10/2012 VALABIL

5/16/2012 3 luni+prelungire 3 luni HG 90/2008 11/16/2012

VALABIL, adresa prelungire

valabilitate nr. 2347/14.08.2012

5/16/2012 3 luni+prelungire 3 luni HG 90/2008 11/16/2012

5/21/2012 3 luni+prelungire 3 luni HG 90/2008 11/21/2012

6/20/2012 3 luni+prelungire 3 luni HG 90/2008 12/20/2012

7/27/2012 3 luni HG 90/2008 10/27/2012 VALABIL

7/27/2012 3 luni HG 90/2008 10/27/2012 VALABIL

9/20/2012 3 luni HG 90/2008 12/20/2012 VALABIL

7/9/2012 3 luni+prelungire 3 luni HG 90/2008 1/9/2013

8/23/2012 3 luni HG 90/2008 11/23/2012 VALABIL

3/7/2012 3 luni+prelungire 3 luni HG 90/2008 9/7/2012

9/13/2012 3 luni HG 90/2008 12/13/2012 VALABIL

8/21/2012 3 luni HG 90/2008 11/21/2012 VALABIL

VALABIL, adresa prelungire

valabilitate nr. 2348/14.08.2012

VALABIL, adresa prelungire

valabilitate nr. 2411/20.08.2012

VALABIL, adresa prelungire

valabilitate nr. 2807/20.09.2012

VALABIL, adresa prelungire

valabilitate nr. 3014/05.10.2012

VALABIL, adresa prelungire nr.

1613/07.06.2012

9/13/2012 3 luni HG 90/2008 12/13/2012 VALABIL

9/13/2012 3 luni HG 90/2008 12/13/2012

3/28/2012 3 luni+prelungire 3 luni HG 90/2008 9/28/2012

10/12/2012 3 luni HG 90/2008 1/12/2013 VALABIL

10/5/2012 3 luni HG 90/2008 1/5/2013 VALABIL

4/13/2012 3 luni+prelungire 3 luni HG 90/2008 10/13/2012

4/13/2012 3 luni+prelungire 3 luni HG 90/2008 10/13/2012

5/29/2012 6 luni HG 90/2008 11/29/2012 VALABIL

6/1/2012 3 luni+prelungire 3 luni HG 90/2008 12/1/2012

6/8/2012 3 luni+prelungire 3 luni HG 90/2008 12/8/2012

10/2/2012 3 luni HG 90/2008 1/2/2013 VALABIL

VALABIL, adresa prelungire nr.

1708/15.06.2012

VALABIL, adresa prelungire nr.

1875/28.06.2012

VALABIL, adresa prelungire nr.

2023/13.07.2012

VALABIL, adresa prelungire nr.

1969/06.07.2012

VALABIL, adresa prelungire

valabilitate nr. 2558/31.08.2012

VALABIL, adresa prelungire

valabilitate nr. 2636/07.09.2012

10/2/2012 3 luni HG 90/2008 1/2/2013 VALABIL

6/11/2012 3 luni+prelungire 3 luni HG 90/2008 12/11/2012

7/3/2012 3 luni HG 90/2008 10/3/2012

7/3/2012 3 luni HG 90/2008 10/3/2012

7/4/2012 3 luni+prelungire 3 luni HG 90/2008 1/4/2013

7/5/2012 3 luni+prelungire 3 luni HG 90/2008 1/5/2013

7/5/2012 3 luni+prelungire 3 luni HG 90/2008 1/5/2013

7/6/2012 3 luni+prelungire 3 luni HG 90/2008 1/6/2013

7/9/2012 3 luni+prelungire 3 luni HG 90/2008 1/9/2013

7/9/2012 3 luni+prelungire 3 luni HG 90/2008 1/9/2013

7/9/2012 3 luni+prelungire 3 luni HG 90/2008 1/9/2013

VALABIL, adresa prelungire

valabilitate nr. 2672/11.09.2012

VALABIL, ATR in curs de actualizare

VALABIL, ATR in curs de actualizare

VALABIL, adresa prelungire

valabilitate nr. 2940/01.10.2012

VALABIL, adresa prelungire

valabilitate nr. 2921/28.09.2012

VALABIL, adresa prelungire

valabilitate nr. 2922/28.09.2012

VALABIL, adresa prelungire

valabilitate nr. 2950/02.10.2012

VALABIL, adresa prelungire

valabilitate nr. 2934/01.10.2012

VALABIL, adresa prelungire

valabilitate nr. 2936/01.10.2012

VALABIL, adresa prelungire

valabilitate nr. 2938/01.10.2012

9/17/2012 3 luni HG 90/2008 12/17/2012 VALABIL

7/19/2012 3 luni HG 90/2008 10/19/2012 VALABIL

7/3/2012 3 luni+prelungire 3 luni HG 90/2008 1/3/2013

7/26/2012 3 luni HG 90/2008 10/26/2012 VALABIL

7/26/2012 3 luni HG 90/2008 10/26/2012 VALABIL

7/27/2012 3 luni HG 90/2008 10/27/2012 VALABIL

8/8/2012 3 luni HG 90/2008 11/8/2012 VALABIL

8/14/2012 3 luni HG 90/2008 11/14/2012 VALABIL

10/1/2012 3 luni HG 90/2008 1/1/2013 VALABIL

10/1/2012 3 luni HG 90/2008 1/1/2013 VALABIL

9/18/2012 3 luni HG 90/2008 12/18/2012 VALABIL

VALABIL, adresa prelungire

valabilitate nr. 2943/01.10.2012

8/21/2012 3 luni HG 90/2008 11/21/2012 VALABIL

9/3/2012 3 luni HG 90/2008 12/3/2012 VALABIL

9/5/2012 3 luni HG 90/2008 12/5/2012 VALABIL

9/5/2012 3 luni HG 90/2008 12/5/2012 VALABIL

9/11/2012 3 luni HG 90/2008 12/11/2012 VALABIL

9/14/2012 3 luni HG 90/2008 12/14/2012 VALABIL

9/19/2012 3 luni HG 90/2008 12/19/2012 VALABIL

9/28/2012 3 luni HG 90/2008 12/28/2012 VALABIL

10/1/2012 3 luni HG 90/2008 1/1/2013 VALABIL

10/4/2012 3 luni HG 90/2008 1/4/2013

10/5/2012 3 luni HG 90/2008 1/5/2013 VALABIL

10/5/2012 3 luni HG 90/2008 1/5/2013 VALABIL

10/5/2012 3 luni HG 90/2008 1/5/2013 VALABIL

10/5/2012 3 luni HG 90/2008 1/5/2013 VALABIL

10/5/2012 3 luni HG 90/2008 1/5/2013 VALABIL

10/5/2012 3 luni HG 90/2008 1/5/2013 VALABIL

10/5/2012 3 luni HG 90/2008 1/5/2013 VALABIL

10/5/2012 3 luni HG 90/2008 1/5/2013 VALABIL

10/5/2012 3 luni HG 90/2008 1/5/2013 VALABIL

10/5/2012 3 luni HG 90/2008 1/5/2013

10/8/2012 3 luni HG 90/2008 1/8/2012 VALABIL

10/8/2012 3 luni HG 90/2008 1/8/2013 VALABIL

10.09.2012 3 luni 90/2008 10.12.2012 VALABIL

08.12.2011 12 luni 90/2008 08.12.2012 VALABIL

08.12.2011 12 luni 90/2008 08.12.2012 VALABIL

23.02.2012 6 luni 90/2008 23.08.2012 VALABIL

10.09.2012 3 luni 90/2008 10.12.2012 VALABIL

02.10.2012 3 luni 90/2008 02.01.2012 VALABIL

02.10.2012 3 luni 90/2008 02.01.2012 VALABIL

02.10.2012 3 luni 90/2008 02.01.2012 VALABIL

24.05.2012 6 luni 90/2008 24.11.2012 VALABIL

13.06.2012 6 luni 90/2008 13.12.2012 VALABIL

22.06.2012 6 luni 90/2008 22.12.2012 VALABIL

22.06.2012 6 luni 90/2008 22.12.2012 VALABIL

22.06.2012 6 luni 90/2008 22.12.2012 VALABIL

21.06.2012 6 luni 90/2008 21.12.2012 VALABIL

18.07.2012 6 luni 90/2008 18.01.2013 VALABIL

18.07.2012 6 luni 90/2008 18.01.2013 VALABIL

26.07.2012 6 luni 90/2008 26.01.2013 VALABIL

23.07.2012 6 luni 90/2008 23.01.2013 VALABIL

09.08.2012 3 luni 90/2008 09.11.2012 VALABIL

10.08.2012 3 luni 90/2008 10.11.2012 VALABIL

10.09.2012 3 luni 90/2008 10.12.2012 VALABIL

10.09.2012 3 luni 90/2008 10.12.2012 VALABIL

22.08.2012 3 luni 90/2008 22.11.2012 VALABIL

22.08.2012 3 luni 90/2008 22.11.2012 VALABIL

22.08.2012 3 luni 90/2008 22.11.2012 VALABIL

10.09.2012 3 luni 90/2008 10.12.2012 VALABIL

17.08.2012 3 luni 90/2008 17.11.2012 VALABIL

18.08.2012 3 luni 90/2008 18.11.2012 VALABIL

09.08.2012 3 luni 90/2008 09.11.2012 VALABIL

10.09.2012 3 luni 90/2008 10.12.2012 VALABIL

08.08.2012 3 luni 90/2008 08.11.2012 VALABIL

15.08.2012 3 luni 90/2008 15.11.2012 VALABIL

10.09.2012 3 luni 90/2008 10.12.2012 VALABIL

08.08.2012 3 luni 90/2008 08.11.2012 VALABIL

08.08.2012 3 luni 90/2008 08.11.2012 VALABIL

13.06.2012 6 luni 90/2008 13.12.2012 VALABIL

17.10.2012 3 luni 90/2008 17.01.2012 VALABIL

10.09.2012 3 luni 90/2008 10.12.2012 VALABIL

10.09.2012 3 luni 90/2008 10.12.2012 VALABIL

11.09.2012 3 luni 90/2008 11.12.2012 VALABIL

11.09.2012 3 luni 90/2008 11.12.2012 VALABIL

10.09.2012 3 luni 90/2008 10.12.2012 VALABIL

10.09.2012 3 luni 90/2008 10.12.2012 VALABIL

11.09.2012 3 luni 90/2008 11.12.2012 VALABIL

19.09.2012 3 luni 90/2008 19.12.2012 VALABIL

25.09.2012 3 luni 90/2008 25.12.2012 VALABIL

17.08.2012 3 luni 90/2008 17.11.2012 VALABIL

01.10.2012 6 luni 90/2008 01.04.2012 VALABIL

01.10.2012 3 luni 90/2008 01.01.2013 VALABIL

02.10.2012 3 luni 90/2008 02.01.2013 VALABIL

11.10.2012 3 luni 90/2008 11.01.2013 VALABIL

11.10.2012 3 luni 90/2008 11.01.2013 VALABIL

10.10.2012 3 luni 90/2008 10.01.2013 VALABIL

10.09.2012 3 luni 90/2008 10.12.2012 VALABIL

10.10.2012 6 luni 90/2008 10.04.2012 VALABIL

17.10.2012 3 luni 90/2008 17.01.2013 VALABIL

17.08.2012 HG 90/2008 17.02.2013 VALABIL

24.04.2012 HG 90/2008 24.10.2012 VALABIL

17.08.2012 HG 90/2008 17.02.2013 VALABIL

25.04.2012 HG 90/2008 25.10.2012 VALABIL

09.07.2012 HG 90/2008 09.01.2013 VALABIL

16.07.2012 HG 90/2008 16.01.2013 VALABIL

18.07.2012 HG 90/2008 18.01.2013 VALABIL

20.08.2012 HG 90/2008 20.02.2013 VALABIL

24.08.2012 HG 90/2008 24.02.2013 VALABIL

28.08.2012 HG 90/2008 20.02.2013 VALABIL

04.09.2012 HG 90/2008 04.03.2013 VALABIL

12.09.2012 HG 90/2008 12.03.2013 VALABIL

21.09.2012 HG 90/2008 21.03.2013 VALABIL

11.04.2012 HG 90/2008 11.10.2012 VALABIL

25.06.2012 HG 90/2008 25.12.2012 VALABIL

25.06.2012 HG 90/2008 25.12.2012 VALABIL

25.06.2012 HG 90/2008 25.12.2012 VALABIL

17.07.2012 HG 90/2008 17.01.2013 VALABIL

10.09.2012 HG 90/2008 10.03.2013 VALABIL

14.09.2012 HG 90/2008 14.12.2012 VALABIL

10.05.2012 HG 90/2008 10.11.2012 VALABIL

29.06.2012 HG 90/2008 29.12.2012 VALABIL

18.09.2012 HG 90/2008 18.03.2013 VALABIL

22.05.2012 HG 90/2008 22.11.2012 VALABIL

25.05.2012 HG 90/2008 25.11.2012 VALABIL

18.06.2012 HG 90/2008 18.12.2012 VALABIL

22.06.2012 HG 90/2008 22.12.2012 VALABIL

21.08.2012 HG 90/2008 21.02.2013 VALABIL

28.08.2012 HG 90/2008 28.11.2012 VALABIL

27.08.2012 HG 90/2008 27.02.2013 VALABIL

05.09.2012 HG 90/2008 05.03.2013 VALABIL

21.09.2012 HG 90/2008 21.03.2012 VALABIL

24.04.2012 HG 90/2008 24.10.2012 VALABIL

25.05.2012 HG 90/2008 25.11.2012 VALABIL

18.06.2012 HG 90/2008 18.12.2012 VALABIL

18.06.2012 HG 90/2008 18.12.2012 VALABIL

14.09.2012 HG 90/2008 14.03.2012 VALABIL

24.09.2012 HG 90/2008 24.03.2013 VALABIL

24.09.2012 HG 90/2008 24.03.2013 VALABIL

29.05.2012 / HG 90/2008 11/29/2012 VALABIL

16.05.2012 / HG 90/2008 5/16/2013 VALABIL

11.07.2012 / HG 90/2008 1/11/2013 VALABILInlocuieste

ATR 70101226500 / 10.05.2012

12.07.2012 / HG 90/2008 1/12/2013 VALABIL

12.07.2012 / HG 90/2008 1/12/2013 VALABIL

12.07.2012 / HG 90/2008 1/12/2013 VALABIL

22.08.2012 / HG 90/2008 22.02.2013 / VALABIL

20.08.2012 / HG 90/2008 20.02.2013 / VALABIL

20.08.2012 / HG 90/2008 20.02.2013 / VALABIL

02.05.2012 / HG 90/2008 11/2/2012 VALABILInlocuieste

ATR 70101120932 / 02.11.2011

05.07.2012 / HG 90/2008 1/5/2013 VALABIL

29.08.2012 / HG 90/2008 29.02.2013 VALABIL

05.06.2012 / HG 90/2008 6/5/2013 VALABIL

Inlocuieste ATR 70101113404 /

17.08.2011

Inlocuieste ATR 70101226197 /

20.04.2011

05.07.2012 / HG 90/2008 7/5/2013 VALABIL

11.09.2012 / HG 90/2008 3/11/2013 VALABIL

12.12.2011 / HG 90/2008 6/12/2012 VALABIL

27.08.2012 / HG 90/2008 8/27/2013 VALABIL

Inlocuieste ATR 70101226590 /

16.05.2012

Inlocuieste ATR 70101223169 /

23.01.2012

Inlocuieste ATR 70201002139 / 08.04.2010

21.05.2012 / HG 90/2008 11/21/2012 VALABIL

13.09.2012 / HG 90/2008 3/13/2013 VALABIL

18.04.2012 / HG 90/2008 10/18/2012 VALABIL

26.04.2012 / HG 90/2008 10/26/2012 VALABIL

Inlocuieste ATR 70201115102 /

06.10.2011

Inlocuieste ATR 70201118774

/06.12.2011

11.07.2012 / HG 90/2008 1/11/2013 VALABIL

29.05.2012 / HG 90/2008 11/29/2012 VALABIL

24.07.2012 / HG 90/2008 1/24/2013 VALABIL

19.09.2012 / HG 90/2008 3/19/2013 VALABIL

Inlocuieste ATR 70201115259 /

24.11.2011

Inlocuieste ATR 70201220372 /

13.02.2012

05.10.2012 / HG 90/2008 4/5/2013 VALABIL

01.10.2012 / HG 90/2008 4/1/2013 VALABIL

29.05.2012 / HG 90/2008 11/29/2012 VALABIL

28.03.2012 / HG 90/2008 9/28/2012 VALABIL

Inlocuieste ATR 70201118912 / 06.04.2012

Inlocuieste ATR 70301110659 /

01.06.2011

20.08.2012 / HG 90/2008 8/20/2013 VALABIL

04.10.2012 / HG 90/2008 4/4/2013 VALABIL Inlocuieste ATR 70301220623 / 16.03.2012

04.10.2012 / HG 90/2008 4/4/2013 VALABIL

12.10.2012 / HG 90/2008 4/12/2013 VALABIL

21.05.2012 / HG 90/2008 5/21/2013 VALABIL

Inlocuieste ATR 70401109111 / 01.09.2011

09.05.2012 / HG 90/2008 11/9/2012 VALABIL

09.10.2012 / HG 90/2008 4/9/2013 VALABIL

09.10.2012 / HG 90/2008 4/9/2013 VALABIL

01.10.2012 / HG 90/2008 4/1/2013 VALABIL

20.09.2012 / HG 90/2008 3/20/2013 VALABIL

18.09.2012 3 luni 90/2008 18.12.2012 VALABIL

18.09.2012 3 luni 90/2008 18.12.2012 VALABIL

25.07.2012 3 luni 90/2008 25.10.2012 VALABIL

Inlocuieste ATR 70601210386 /

27.07.2012

9/11/2012 3 luni 90/2008 11.12.2012 VALABIL

9/19/2012 3 luni 90/2008 19.12.2012 VALABIL

28.09.2012 3 luni 90/2008 28.12.2012 VALABIL

ATR prelungit 90/2008 07.09.2012 VALABIL

ATR prelungit 90/2008 05.09.2012 VALABIL

ATR prelungit 90/2008 06.09.2012 VALABIL

ATR prelungit 90/2008 06.10.2012 VALABIL

ATR prelungit 90/2008 10.10.2012 VALABIL

10.02.2012/08.05.2012

05.03.2012/17.05.2012

06.03.2012/17.05.2012

06.04.2012/26.06.2012

10.04.2012/27.06.2012

ATR prelungit 90/2008 04/11/2012 VALABIL

ATR prelungit 90/2008 04/11/2012 VALABIL

ATR prelungit 90/2008 04/11/2012 VALABIL

ATR prelungit 90/2008 10/11/2012 VALABIL

ATR prelungit 90/2008 23/11/2012 VALABIL

ATR prelungit 90/2008 29.11.2012 VALABIL

16.07.2012 90/2008 16.10.2012 VALABIL

13.07.2012 90/2008 13.10.2012 VALABIL

18.07.2012 90/2008 18.10.2012 VALABIL

04.05.2012/05.07.2012

04.05.2012/19.07.2012

04.05.2012/19.07.2012

10.05.2012/21.08.2012

23.05.2012/17.08.2012

29.05.2012/21.08.2012

13.07.2012 90/2008 13.10.2012 VALABIL

13.07.2012 90/2008 13.10.2012 VALABIL

13.07.2012 90/2008 13.10.2012 VALABIL

26.07.2012 90/2008 26.10.2012 VALABIL

31.07.2012 90/2008 31.10.2012 VALABIL

27.08.2012 90/2008 27.11.2012 VALABIL

27.08.2012 90/2008 27.11.2012 VALABIL

ATR prelungit 90/2008 18.12.2012 VALABIL

29.08.2012 90/2008 29.11.2012 VALABIL

28.08.2012 90/2008 28.11.2012 VALABIL

28.08.2012 90/2008 28/11/2012 VALABIL

18.06.2012/10.08.2012

28.08.2012 90/2008 28/11/2012 VALABIL

08/08/2012 90/2008 08/02/2013 VALABIL

09/08/2012 90/2008 09/11/2012 VALABIL

28/08/2012 90/2008 28/11/2012 VALABIL

Data estimata PIF

2013

oct. 2012

2013

2012

2012

12.2012

iunie 2013

2013

2013

2013

2013

2012

2012

2014

2012

2012,2014, 2016

2013

2014

2012

30.06.2012

30.06.2013

2013

2013

2012

2012

2013

0.5 in 2012; 1.0MW in 2013

0.5 in 2012; 1.5MW in 2013

2013

2013

2013

PIF 2012

PIF 2012

PIF 2012

PIF 2012

PIF 2012

PIF 2013

PIF 2013

PIF 2013

PIF 2012

PIF 2012

PIF 2013

PIF 2013

PIF 2012

PIF 2011

PIF 2013

PIF 2013

PIF 2013

PIF 2013

PIF 2012

PIF 2012

PIF 2012

PIF 2012

PIF 2012

PIF 2012

PIF 2012

PIF 2012

PIF 2012

PIF 2012

PIF 2012

PIF 2012

PIF 2012

PIF 2012

PIF 2012

PIF 2012

PIF 2012

PIF 2012

PIF 2013

PIF 2012

PIF 2012

PIF 2012

PIF 2012

PIF 2012

PIF 2012

PIF 2012

PIF 2012

PIF 2012

PIF 2012

PIF 2013

PIF 2013

PIF 2013

PIF 2013

PIF 2013

PIF 2013

PIF 2013

PIF 2013

PIF 2013

2013

2014

2013

2013

2013

2013

2013

2013

2013

2013

2013

2013

2013

2014

2013

2013

2013

2013

2013

2013

2013

2013

2013

2013

2013

2013

2013

2013

2013

2013

2013

2013

2013

2013

2013

2013

2013

2013

2012

2012

2013

2012

2013

2012

2013

15.12. 2012

15.12.2012

30.12.2012

2013

trim. I 2013

trim III 2012

trim III 2012

2012

trim 3.2012

31.01.2013

octombrie 2012

decembrie 2012

Trimestrul 3 2012

sem.II 2012

sem.II 2012

sem.II 2012

trim II 2013

trim IV 2012

octom. 2014

octom. 2014

trim.I 2013

septembrie 2013

septembrie 2013

31.11.2012

31.11.2012

septembrie 2013

octombrie 2014

01.06.2013

Data: 05.11.2012

Codul culorilor ATR emise de:

Transelectrica

Enel Dobrogea

E.ON Moldova

Electrica Transilvania Nord

Electrica Transilvania sud

CEZ

Electrica Muntenia Nord

Enel Muntenia

Enel Banat

ATR Expirate

ATR Noi

Nr. crt Denumire investitor Judetul

1 SC Termoelectrica SA CTE Braila

Total

Denumire centrale electrice eoliene

U(kV) Comentariu Emitent Nr. ATR

880 400 CN Transelectrica SA 95

Putere instalata

(MW)

Staţia de racord

Lacu Sarat

racordare la RET in statia electrica 400kV Lacul Sarat prin LEA 400kV s.c.de racordare a

fostului grup G4 din CTE Braila

Obs. Stare ATR

11.10.2011 11.04.2012 Expirat

Data Emiterii/ Prelungirii

Legislatia

Data expirarii

ATR

Data estimata

PIF

Prelungire ATR 35/11.04.2011