Post on 20-Sep-2019
A N T E M A S U R A T O A∴R E
Sistematizare pe verticala in curtea spitaluiui
Nr.Simb01articCl UM CANTエTATEA
Crt.
001 DGO6AI M.C. 26.000
SPARG Sェ DESF BET CエM PE SUPRAF L工MェT PT
POZARE CABLE COND,POD,GURI SCURGERE LA
IMBRAC CAROSAB
(54.65 +12)Ⅹ(0.25Ⅹ0.2+0.15Ⅹ0.3)=66・65Ⅹ0・045=6・33 mc
(5.64 +6.64+5.2+6.66)m xO.25 Ⅹ 0・2+0・
(33.5+28)((0.3+0.15+0.5+0.25〉+(0.2Ⅹ0・
Total =17
15Ⅹ03)m=24.14Ⅹ0.095=2.293mc
l)(0.1xO.15)+(1.5Ⅹ0.1)〉=17.22
.22 + 6.33 + 2.293=25.84 mc
002 TSC35Al lOO MC. 0.26
EXC.TRA.INC.エN∴AUT.CU ェNC.FRONT.PE
SENILE O,5-0,99MC.IN PAM.TER.CAT.l LA
DエST.<10M
OO3 TRA01A TONA 62.400
TRANSPORTUL RUTエER AL MATERIALELOR,
SEMIFABR工CATELOR CU AUTOBASCULANTA PE
DIST.= KM.
26 mc x 2.4 t/mc = 62.4 t
OO4 DAO4Al lOO MC. 0.700
SCARェF MEC A PI.AF DRUM∴EXEC CU
AUTOGREDERUI.PE O AD工NC DE CEL PUT工N 5
CM IN ェMP工ETR FARA ADUN M
687.22 mp x O・1m三 68・72 mc
OO5∴TSAOIBI M.C. 37.400
SAP.MAN.工N SPATIE INTエNSE エN PAM.CU
UM工D.NAT.ARUNC.IN DEPOZ.SAU VEHIC.LA H
<0,6M T.M工JLOCェU★
2 Ⅹ15 Ⅹ 0.2 Ⅹ 0.2 = 26.29 mc
(36.06+38.24)Ⅹ 0.2 Ⅹ 0・2 =1・97 mc
(33.5+28〉X3+4.5X4.0=184.5+18 = 202・5
202.5xO.3 x O.15 = 37.37 mc
OO6 DAO6AI M.C. 72.000
STRAT AGREG NAT(BALAST)CILINDR CU FUNCT
REZェST∴FェLTRANT ェZOL∴AERェSIRE ANTCAP CU
ASTERNERE MANUAL
276.75 Ⅹ 0.2=55.35 mc
(68.58+15)xl.6)x O・12 =16・55 mc
Total = 71.90 mc
OO7 TRAOIA TONA 161.000
TRANSPORTUL RUTェER AL MATER工ALELOR,
SEM工FABRェCATEI.0R CU AUTOBASCULANTA PE
D工ST.= KM.
72 mc xl.311t/mc xl.7t/mc =160.46 t
OO8 TRAO5AO2 TONA 17.000
TRANSPORT RUTIER MATERIALE,SEMエFABR工CATE
CU AUTOVEHェC.SPEC工ALE(CエSTERNA,BETON.
ETC)PE DIST.DE 2
72 mc x O.232 mc/mc x lt/mc =16.7 t
OO9 DElOAI M 231.000
BORDURエ PREFABRエCATE DエN BETON PT
TROTUARE 20 X 25CM,PE FUNDATIE D工N BETON
30 X15 CM
28 + 202.5 = 230.50 m
009 2100933 M.C. 10.500
BETON DE CェMENT B lOO STAS 3622
010 DEllAI M 171.000
BORD MIC工 PREF BETON lO X15 CM PT
工NCADR∴TROTUARESPATI工 VERZエ ALE工 ASEZATE
FUND BETON lO X 20 C
(54.65+12.00 + 2Ⅹ15 + 36.06+38・24)m=171m
010 2100933 M。C. 3.420
BETON DE C工MENT B lOO STAS 3622
011 TRAOIA TONA 34.000
TRANSPORTUL RUT工ER AL MATERェALELOR,
SEMIFABRェCATELOR CU AUTOBASCULANTA PE
D工ST.= KM.
(231m x O.20m x O.25m+171.m x O.l m x O.15m)Ⅹ2・4t/mc=33・87
012 TRAO6A TONA 34.000
TRANSPORTUL RUTエER AL BETONULUI-
MORTARULU工 CU AUTOBETONエERA DE 5,5 MC
DエST.= KM
(10.50+3.42)mc xl.008 Ⅹ 2.4t/mc = 33.67 t
O13 DA12CI M.C. 94.000
STAT FUND REPROF P SPARTA PT DRUM CU
ASTERNERE MECANエCA EXEC FARA 工MPANARE Sエ
FARA エNNOROIRE
(1046.82-57.6-302)Ⅹ0.12=82.47
68.58 mp x O.12 m= 8・23
15Ⅹ1.6 Ⅹ 0.12 = 2.88 mc
Total = 94 mc
O14 TRAOIA TONA 179.000
TRANSPORTUL RUTェER AL MATERエALELOR,
SEMエFABRICATELOR CU AUTOBASCUI.ANTA PE
D工ST.= KM.
94 mc xl.270 mc/mcxl.5 t/mc =179 t
O15 DB12BI TONA 90.000
STRAT LEGAT BエNDER DE CRエB EXEC LA CALD
CU ASTERNERE MECAN工CA
80.40 t +8.93 t = 89.33 t
O16 2101832 TONA lOl.000
M工XTURA ASFALT工CA BADPC20
687.22 mp x O.05m x 2・37t/mc= 80・405t
687.22 mp x O.013t/mp = 8・934 t
326 m x O.0333 t/m =10.856 t
Total = 100.18
017 DEO8AI M 326.000
ェNCADRAREA ェMBRACAMINTILOR ASFALT工CE
SEM工PERMANENTCU PENE RAMFORT
O18 DBO2Dl lOO MP. 19.000
AMORS SUPRAF STRAT BAZA SAU エMBRAC EXエST
IN VEDER APLIC STRAT UZ MエX ASF CU
EMULSIE CATエONICA
423.31+1046.82-57.60+265.4+210.85=18.89 mp
O19 DAOIAl lOO MP. 19.000
CURATIREA Sエ ェNLAT STRAT NOROI GROS MED
5CM DE PE STRAT RUT工ER
O20 DB16HI MP. 1716.000
IMBRAC BET∴ASF CU AGREGAT∴MARUNT EXEC LA
CALD 工N GROS DE 4′O CM ASTERN∴MECANエCA
423.31+1046.82-57.60+210.85+68.58+15Ⅹ1.5 =1715.96=1716
021 2101834 MェXTURA TIP BAPC16 TONA 162.000
1716 MP X O.04∴M X 2.35 7/MC=161.30 7
161.3 T X l.003 M=161.78 7
022 DB16BI MP. 357.50
IMBRAC BET ASF CU AGREGAT MARUNT EXEC LA
CALD ェN GROS DE 3,O CM∴ASTERN MANUALA
265.24+(33.5+28)Ⅹ1.5 = 357.49
023 2101835 MIXTURA T工P BA8 TONA 25.000
357.50 MP X O.03 M X 2.35 T/MC Xl.003 = 25.28 T
O24 TRAOIA TONA 288.000
TRANSPORTUL RUTェER AL MATERIALELOR′
SEMエFABRエCATELOR CU AUTOBASCULANTA PE
DエST.= KM.
101七 十 162 七 十 25 t = 288 t
O25 IFBO9AI MP. 277.000
STRAT DRENANT GROS工ME 5 CM D工N N工S工P
O26 TRAOIA TONA 27.000
TRANSPORTUL RUTIER AL MATERエALEI.OR,
SEMIFABRICATELOR CU AUTOBASCULANTA PE
DIST.= KM.
277 mp+.05 m Xl.3 mc/mc Xl.5t/mc = 27 t
O27 PRET PAVELE ECOLOGェCE 277 mpxiei/mp
O28 TRAOlA TONA 66.000
TRANSPORTUL RUT工ER AL MATERIALELOR′
SEM工FABRICATELOR CU AUTOBASCULANTA PE
DエST.= KM.
Verificat,