Formularul F3

Obiectivul: AMENAJARE CENTRU CIVIC ÎN LOCALITATEA BIRCHIȘ, COMUNA BIRCHIȘ, JUDEȚUL ARAD

LISTA

CU CANTITATI DE LUCRARI PE CATEGORII DE LUCRARI

OBIECTULNR.4 : PARCARE

CATEGORIA DE LUCRARI: INDICATOARE RUTIERE -lei-

Nr. crt. Capitolul de lucrari U.M. Cantitate Pretul unitar Material Manopera Utilaj Transport Total

a)materiale

b)manopera (3x4a) (3x4b) (3x4c) (3x4d) (3x4)

c)utilaj

d)transport

Total

a)+b)+c)+d)

sectiunea tehnica sectiunea financiara

0 1 2 3 4 5 6 7 8 9

001 DF18A1 BUC. 2.000

PLANTARE STILPI PENTRU INDICATOARE DE

CIRCULATIE RUTIERA DIN METAL CONFECTIONA

TI INDUSTRIAL

001 6301793 BUC. 2.000

STILP METALIC CONFECTIONAT INDUSTRIAL

001 2100969 M.C. 0.200

BETON DE CIMENT B 250 STAS 3622

002 DF19A1 BUC. 2.000

MONTAREA INDICATOARELOR PTR CIRC RUT DIN

TABL OTELSAU ALUM PE UN STILP GATA

PLANTAT

002 7101011 BUC. 2.000

INDICATOR CIRCULATIE TABLA OTEL+FOLIE R.

PATRAT LUNGIME= 600 MM F36 S1848

PATRAT LUNGIME= 600 MM F36 S1848 Cheltuieli directe din articole:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL

Alte cheltuieli directe:

-CAS:

-SOMAJ:

-SANATATE:

-CONTRIBUTIE CONCEDII SI INDEMNIZATII:

-FOND RISC:

-FOND GARANTARE SALARII:

Total cheltuieli directe:

GREUTATE MATERIALE MANOPERA UTILAJ TRANSPORT TOTAL

Cheltuieli indirecte:

Profit:

TOTAL GENERAL DEVIZ: